MYAPC License Termination Plan Revision 1 June 1, 2001 MYAPC License Termination Plan Revision 1 June 1, 2001 Page 2-98 ATTACHMENT 2E Site and Survey Area Maps

SWITCHYARD SERVICE BUILDING TURBINE HALL 115KV REACTOR 13 14 16 17 18 39 36 53 55 71 68 67 104 103 49 48 30 46 43 27 45 41 58 73 74 81 83 87 89 90 86 98 96 100 102 33 64 BUILDING Site Characterization West Side Yard Figure 2-3 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R0100 Approximate Survey Location XX N

15 MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-99

SERVICE BUILDING TURBINE HALL REACTOR BUILDING Figure 2-4 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Site Characterization East Side Yard Survey Package R0200 214 2

5 6

16 21 42 44 68 75 212 222 132 161 159 143 158 215 155 152 151 114 109 78 77 102 86 55 46 38 214 Approximate Survey Location MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-100

B-201 B-202 B-205 B-203 B-206 B-206 BK-1 "7D" "7 E" "7 F" "6 A" "7 G" "7 C" "6H" "6G" "6F" "6E" "6D" "6C" "6J" "6K" "6M" "6L" "5C" "5B" "5A" "6I" "7H" "7B" "6B" 005 006 007 RD BUILDING ADMINISTRATION BUILDING Site Characterization Roof and Yard Drains Figure 2-5 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN

  1. 005, 006, 007; Survey Package R0300-1 N

WAREHOUSE FIRE POND PARKING REACTOR 115KV TURBINE HALL SERVICE BUILDING SWITCHYARD MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-101

30 SERVICE BUILDING TURBINE HALL ADMIN PARKING "9E" "9D" "9B" "9C" "9A" "10B" "10A" "10C" "10E" "10D" "10F" "10H" "11A" "11B" "11C" "11D" "11E" MW-1OO 009 010 011 012 N13 SP-7 Site Characterization Roof and Yard Drains Figure 2-6 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Post Indicator Valve SP-6 SP-12 008 MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-102

BACK RIVER FOXBIRD ISLAND BAILEY POINT TURBINE HALL SWITCHYARD SERVICE BUILDING TURBINE HALL 115KV REACTOR BAILEY COVE FOREBAY 0

20 10 20 10 30 0

10 20 6

7 9

8 1

5 2

4 3

MONTSWEAG BAY Site Characterization Forebay Shorelines Figure 2-7 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R0400-1A BUILDING X

N MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-103

2 5

7 9

12 14 15 17 18 19 21 25 27 34 36 42 45 47 49 53 54 56 57 59 60 62 63 64 65 66 POINT BAILEY XX

- APPROXIMATE SAMPLE LOCATION MONTSWEAG BAY Site Characterization Bailey Point Figure 2-8 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R0500-2 0

20 10 0

10 MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-104

0 20 10 0

10 MONTSWEAG BAY Site Characterization Bailey Point Figure 2-9 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R0500-2 2

5 7

9 12 14 15 17 18 19 21 25 27 34 36 42 45 47 49 53 54 56 57 59 60 62 63 64 65 66 POINT BAILEY XX

- APPROXIMATE SAMPLE LOCATION MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-105

0 20 10 0

10 MONTSWEAG BAY Site Characterization Bailey Point Figure 2-10 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R0500-4 POINT BAILEY XX

- APPROXIMATE SAMPLE LOCATION 1

2 3

4 5

6 7

8 10 11 12 13 14 15 16 17 18 19 20 23 22 21 24 25 26 27 28 30 31 32 33 36 35 MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-106

OLD FERRY ROAD 20 10 60 30 30 Site Characterization Ball Field Figure 2-11 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R0600-1 MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-107

OLD FERRY ROAD 20 10 60 30 30 Site Characterization Ball Field Figure 2-12 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R0600-2 3

1 2

13 23 33 43 53 63 73 82 90 97 101 91 83 74 64 54 44 34 24 14 4

98 MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-108

OLD FERRY ROAD Site Characterization Ball Field Figure 2-13 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R0600-2 3

1 2

13 23 33 43 53 63 73 82 90 97 101 91 83 74 64 54 44 34 24 14 4

98 15 25 26 27 19 12 36 49 50 51 62 61 59 66 75 79 86 71 81 91 96 72 30 Biased Survey N

Approximate Survey Location XX 20 10 60 30 30 MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-109

1 7

19 20 30 61 76 102 2

3 4

10 14 15 25 26 27 36 37 40 45 47 51 52 56 64 67 73 78 81 84 90 92 94 95 99 100 BALL FIELD Figure 2-14 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R0700-2 Approximate Survey locations

    1. Reference Points 0

0 20 10 30 40 OLD FERRY ROAD TEMPORARY GENERATOR ENCLOSURE MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-110

LITTLE OAK ISLAND BUILDING ADMIN BUILDING 1

6 12 19 31 45 59 73 87 114 127 136 137 128 130 125 122 119 117 116 101 108 109 110 113 89 90 75 81 82 60 67 68 70 72 52 33 34 35 36 41 43 44 29 26 25 13 2

4 Site Characterization Admin. and Parking Areas Figure 2-15 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Approximate Survey Location Survey Package R0800-2 BACK RIVER WAREHOUSE FIRE POND PARKING SWITCHYARD 345KV Bailey Cove REACTOR PARKING STORAGE L.L.W.

115KV BUILDING SERVICE SWITCHYARD TURBINE HALL MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-111

FOREBAY WAREHOUSE FIRE POND PARKING SWITCHYARD 345KV ENCLOSURE GENERATOR TEMPORARY BAILEY COVE ADMIN REACTOR PARKING STORAGE L.L.W.

115KV TURBINE HALL BUILDING SERVICE SWITCHYARD TURBINE HALL PLANT ACCESS ROAD ISLAND OAK LITTLE BACK RIVER 39 40 48 50 52 69 73 78 80 83 93 94 95 98 100 101 107 108 109 111 113 115 120 123 126 128 130 151 153 158 BUILDING Site Characterization Balance of Plant Areas Figure 2-16 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R0900 XX Approximate Sample Locations MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-112

FOREBAY BAILEY COVE MONTSWEAG BAY POINT BAILEY ISLAND FOXBIRD Site Characterization Foxbird Island Figure 2-17 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN 5

12 14 17 19 34 39 44 54 63 65 68 69 71 73 76 78 81 83 85 86 88 91 93 94 98 102 118 122 125 Survey Package R1000 XX Approximate Survey Locations MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-113

SERVICE BUILDING TURBINE HALL "9E" "9D" "9B" "9C" "9A" "10B" "10A" "10C" "10E" "10D" "10F" "10H" "11A" "11B" "11C" "11D" "11E" MW-1OO 009 010 011 012 N13 SP-7 Site Characterization Roof and Yard Drains Figure 2-18 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN

  1. 005, 009-12; Survey Package R1100-1 Post Indicator Valve SP-6 SP-12 30 ADMIN PARKING MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-114

WAREHOUSE PARKING ADMIN REACTOR 115KV TURBINE HALL SERVICE BUILDING SWITCHYARD BUILDING Site Characterization Roof and Yard Drains Figure 2-19 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN INFORMATION CENTER B-201 B-206 B-202 B-203 BK-1 B-204 "7C" "7B" "7A" "7D" "7E" "7F" "7G" "7H" "7I" "6A" "6B" "6C" "6D" "6J" "6K" "6E" "6F" "6G" "6H" "6I" "6L" "5A" "5B" "5C" 005 006 007 SP-5 SP-9 SP-10 MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-115

30 40 60 30 ENCLOSURE 40 PLANT ACCESS ROAD PARKING GENERATOR TEMPORARY STORAGE L.L.W.

20 Figure 2-20 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Outfall #017

  1. 017 Survey Package R1100-1 Site Characterization Roof and Yard Drains MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-116

STORAGE L.L.W.

2 3

6 7

8 9

10 11 13 14 20 18 17 16 15 22 23 24 25 26 27 28 29 30 31 32 33 36 38 39 Figure 2-21 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN XX Approximate Survey Locations MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-117

PARKING 138 142 134 137 145 156 Site Characterization Dry Cask Storage Area Figure 2-22 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R1300-2 73 XX Approximate Survey Locations 11 15 22 27 28 39 46 53 55 68 72 79 88 95 102 103 107 110 113 116 136 137 GENERATOR TEMPORARY STORAGE L.L.W.

20 40 PLANT ACCESS ROAD 30 ENCLOSURE 60 40 30 MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-118

WESTPORT ISLAND BACK RIVER LITTLE ISLAND OAK BAILEY POINT MONTSWEAG BAY FOXBIRD ISLAND N

Figure 2-23 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN LONG EDGE DISCHARGE AREA (DIFFUSER)

PLANT 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 DISCHARGE FOREBAY INTAKE XX APPROXIMATE SURVEY LOCATION MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-119

ASH ROAD AA BB CC DD EE FF A

B C

D E

F G

I 1

2 3

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 29 30 33 34 35 Site Characterization Ash Road Rubble Piles TERMINATION PLAN ATOMIC POWER CO.

LICENSE MAINE YANKEE Figure 2-24 Survey Package R1500-2 XX Approximate Survey Location N

MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-120

410,000 N 620,000 E 405,000 N 625,000 E BACK RIVER CHEWONKI CREEK POINT FOXBIRD ISLAND BAILEY POINT LITTLE OAK ISLAND PLANT ACCESS ROAD OLD FERRY ROAD TURBINE HALL SWITCHYARD SERVICE BUILDING TURBINE HALL 115KV L.L.W.

STORAGE PARKING REACTOR ADMIN MONTSWEAG BAY BAILEY COVE TEMPORARY GENERATOR ENCLOSURE 345KV SWITCHYARD PARKING FIRE POND WARE-HOUSE FOREBAY YOUNG YOUNG POINT ROAD YOUNG BROOK READY POINT ROAD N

Site Characterization Owner Controlled Area Figure 2-25 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R1600-4 Approximate Survey Locations 1

5 8

11 14 17 23 24 27 28 29 30 31 33 39 40 41 63 67 69 70 73 45 46 49 50 51 54 56 61 XX MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-121

410,000 N 620,000 E 410,000 N 620,000 E 405,000 N 625,000 E POINT FOXBIRD ISLAND BAILEY POINT LITTLE OAK ISLAND PLANT ACCESS ROAD OLD FERRY ROAD TURBINE HALL SWITCHYARD SERVICE BUILDING TURBINE HALL 115KV L.L.W.

STORAGE PARKING REACTOR ADMIN MONTSWEAG BAY BAILEY COVE TEMPORARY GENERATOR ENCLOSURE 345KV SWITCHYARD PARKING FIRE POND WARE-HOUSE FOREBAY YOUNG YOUNG POINT ROAD BACK RIVER CHEWONKI CREEK READY POINT ROAD KK JJ II HH GG FF EE DD CC BB AA Z

Y X

W V

U T

S R

Q P

O N

M L

K J

I H

G F

E D

C B

A N

Site Characterization Owner Controlled Area Figure 2-26 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R1600-4 Elevated Reading Drive-over Area Scanned MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-122

BACK RIVER ACCESS ROAD ASH ROAD OLD FERRY ROAD YOUNG BROOK Site Characterization Owner Controlled Area Figure 2-27 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN North of Old Ferry RD Survey Package R1700-1 N

4 7

15 18 21 22 23 25 28 31 32 35 38 38 39 41 43 45 52 54 55 56 57 59 60 61 62 63 71 73 75 XX Approximate Survey Location MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-123

51 60 64 72 75 76 78 83 87 92 96 103 120 121 132 133 144 141 158 Site Characterization Owner Controlled Area Figure 2-28 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN North of Old Ferry RD Survey Package R1700-4 N

XX Approximate Survey Location 9

12 17 18 20 23 25 343 42 45 BACK RIVER ACCESS ROAD ASH ROAD OLD FERRY ROAD YOUNG BROOK MYAPC License Termination Plan Revision 1 June 1, 1001 Page 2-124

BACK RIVER Site Characterization Bailey House Area Figure 2-29 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R1800-1 N

PLANT ACCESS ROAD ASH ROAD OLD FERRY ROAD L.L.W.

STORAGE PARKING TEMPORARY GENERATOR ENCLOSURE 345KV SWITCHYARD FIRE POND YOUNG BROOK MYAPC License Termination Plan Revision 1 June 1, 1001

PLANT FOREBAY INTAKE APPROXIMATE SURVEY LOCATION 1

2 3

4 17 20 23 XX WESTPORT ISLAND BACK RIVER LITTLE ISLAND OAK BAILEY POINT MONTSWEAG BAY FOXBIRD ISLAND N

Figure 2-30 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Site Characterization Bailey Cove Survey Package R1900 LONG EDGE DISCHARGE AREA (DIFFUSER)

MYAPC License Termination Plan Revision 1 June 1, 1001

PLANT FOREBAY INTAKE APPROXIMATE SURVEY LOCATION XX 1

2 3

4 5

WESTPORT ISLAND BACK RIVER LITTLE ISLAND OAK BAILEY POINT MONTSWEAG BAY FOXBIRD ISLAND N

Figure 2-31 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Site Characterization Diffusers Survey Package R2000 LONG EDGE DISCHARGE AREA (DIFFUSER)

MYAPC License Termination Plan Revision 1 June 1, 1001

ENCLOSURE GENERATOR TEMPORARY Figure 2-32 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R2100 1

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 2

XXX Approximate location of sample and survey point MYAPC License Termination Plan Revision 1 June 1, 1001

BUILDING N

REACTOR SERVICE BUILDING BWST B

BWST A

PWST 1

2 3

4 4

3 1

2 28/28 27/29 27/28 24/28 32/26 28/29 28/30 25/26 Grid 1 Grid 2 P. A. B.

Fuel Building Figure 2-33 Survey Package R2300-1 TERMINATION PLAN ATOMIC POWER CO.

LICENSE MAINE YANKEE General Area Survey Results 6/36 uR/hr Ludlum 2350-1

  1. 126182 3-22-98 MYAPC License Termination Plan Revision 1 June 1, 1001

N BWST B

1 2

3 4

4 3

1 2

P. A. B.

Figure 2-34 Survey Package R2300-2 TERMINATION PLAN ATOMIC POWER CO.

LICENSE MAINE YANKEE Scan #1 Grid ID Scan #2 Grid ID Transformer X16 Transformer X14

= Area Scan

= Sample Point Point location X

MYAPC License Termination Plan Revision 1 June 1, 1001

0 20 10 0

10 POINT BAILEY

- APPROXIMATE LOCATION OF ELEVATED AREA MONTSWEAG BAY Site Characterization Drive Over Elevated Areas Figure 2-35 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R2500-1 MYAPC License Termination Plan Revision 1 June 1, 1001

OLD FERRY ROAD 20 10 60 30 30 Site Characterization Drive Over Area Figure 2-36 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R2500-2 Approximate location of elevated area MYAPC License Termination Plan Revision 1 June 1, 1001

OLD FERRY ROAD TEMPORARY GENERATOR ENCLOSURE 0

0 20 10 30 40 BALL FIELD Figure 2-37 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R2500-3 1

2 3

4 5

6 7

8 Approximate location of elevated area MYAPC License Termination Plan Revision 1 June 1, 1001

WAREHOUSE FIRE POND PARKING SWITCHYARD 345KV Bailey Cove REACTOR PARKING STORAGE L.L.W.

115KV BUILDING SERVICE SWITCHYARD TURBINE HALL BACK RIVER LITTLE OAK ISLAND BUILDING ADMIN BUILDING Site Characterization Drive Over Areas Figure 2-38 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R2500-4 3

2 1

Approximate location of elevated area MYAPC License Termination Plan Revision 1 June 1, 1001

30 40 60 30 ENCLOSURE 40 PLANT ACCESS ROAD PARKING GENERATOR TEMPORARY STORAGE L.L.W.

20 Figure 2-39 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Site Characterization Drive Over Elevated Areas 2

1 Approximate location of elevated areas MYAPC License Termination Plan Revision 1 June 1, 1001

410,000 N 620,000 E 410,000 N 620,000 E 405,000 N 625,000 E BACK RIVER CHEWONKI CREEK POINT FOXBIRD ISLAND BAILEY POINT LITTLE OAK ISLAND PLANT ACCESS ROAD OLD FERRY ROAD TURBINE HALL SWITCHYARD SERVICE BUILDING TURBINE HALL 115KV L.L.W.

STORAGE PARKING REACTOR ADMIN MONTSWEAG BAY BAILEY COVE TEMPORARY GENERATOR ENCLOSURE 345KV SWITCHYARD PARKING FIRE POND WARE-HOUSE FOREBAY YOUNG YOUNG POINT ROAD YOUNG BROOK READY POINT ROAD KK JJ II HH GG FF EE DD CC BB AA Z

Y X

W V

U T

S R

Q P

O N

M L

K J

I H

G F

E D

C B

A N

Site Characterization Drive Over Elevated Areas Figure 2-40 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R2500-7 Approximate location of elevated area MYAPC License Termination Plan Revision 1 June 1, 1001

PLANT ACCESS ROAD ASH ROAD OLD FERRY ROAD L.L.W.

STORAGE PARKING TEMPORARY GENERATOR ENCLOSURE 345KV SWITCHYARD FIRE POND YOUNG BROOK Site Characterization Drive Over Elevated Areas Figure 2-41 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package R2500-8 N

1 2

3 4

Approximate location of elevated areas BACK RIVER MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Forebay Area Survey Package R2501 Figure 2-42 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

17 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 18 19 20 21 22 23 24 25 26 FOREBAY RWST R2501 / 01OA1

/ 01OB1 R2501 / 02OA1

< 2 pci/gm CS137 XX -Approximate Survey Location MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Dry Cask Storage Area Survey Package R2501 Figure 2-43 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Plant Access Road L.L.W.

STORAGE PARKING Temporary Generator Enclosure Maintenance Storage Yard 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 XX-Approximate Survey Locations R2501/03OA1

/03OA1 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Follow-up Sampling At Elevated Soil Sample Locations Survey Package Figure 2-44 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

1 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 1

2 X

X 0 - 6" Soil Sample Location (Approximate) 6 - 12" Soil Sample Location (Approximate)

Dry Cask Storage Area MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Containment Building -2ft Elevation Survey Package A0100 Figure 2-45 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN SIT#2 RCP#2 PZR QUENCH TANK ICI SUMP S/G#2 RCP#3 S/G#3 SIT#3 REACTOR HEAD LAYDOWN RCP#1 SIT#1 S/G#1 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 1

2 3

4 5

1 2

3 4

5 6

7 8

9 10 11 12 13 14 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 10 9

8 7

6 5

4 3

2 1

1 2

3 4

5 Stairway 01SW2 Stairway 01SW1 Floor 01FL1 Walls 01WS2 Walls 01WS1 Equipment 01EQ1 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization 20 ft Elevation Survey Package A0200 Figure 2-46 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN SIT#1 UPPER GUIDE STRUCTURE STORAGE AREA CORE BARREL&

THERMAL SHIELD STORAGE AREA RCP#1 S/G#1 PZR SIT#2 RCP#2 S/G#2 RCP#3 S/G#3 SIT#3 CEA CHANGE STA FUEL TRANSFER CANAL XX XX XX NW Stair well 01SW2 SW Stairwell 01SW1 Equipment 01EQ1 XX XX XX Outer Walls 01WS1 Inner Walls 01WS2 Floors 01FL1 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 20 19 18 17 16 15 14 13 12 11 10 9

8 7

6 5

4 3

2 1

1 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1

2 3

4 5

1 2

3 4

5 1

2 3

4 5

6 7

8 9

10 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Fuel Building 21 ft Elevation Survey Package A0400 Figure 2-47 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN P-17B P-17A P-85 90 91 92 XX XX XX Stair well Floor Drains Equipment 01EQ1 XX XX XX Walls Floor Drain Floors This area not surveyed due to high dose rates.

1 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 1

2 3

4 5

6 7

8 9

10 1

2 3

4 5

1 2

3 1

2 This area not surveyed due to high dose rates.

MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Demineralized Water Storage Tank (DWST) Survey Package A0500 Figure 2-48 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Floor 02FL1 XX 1

2 3

4 5

6 7

8 9

1 2

3 4

5 6

1 2

1 2

3 4

5 6

1 2

3 1

2 3

4 5

6 1

2 3

XX XX XX Tank Exterior 01WE1 Wall Exterior 02WE1 Ceiling 02CL1 XX XX XX Wall Interior 02WS1 Equipment 02EQ1 Structural Tank Supports 01SS1 Spray Building N

MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Primary Auxiliary Building 11 ft Survey Package A0600 Figure 2-49 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN TK-11 P-15A P-15B DA-1A DA-1B P-66A P-66B P-21 P-65 P-20 P-19 P-22 P-11 P-18A P-18B P-24A P-24B FL-8A FL-35A Letdown HXCHs FL-35B FL-34A FL-34B FL-8B I-4 I-5A I-5B R-45 I-2C I-2B I-2A I-3 TK-12A TK-12B P-16A P-16B P-23B P-23A P-7 FL-33A FL-33B P-8 TK-3 P-81 P-67A/B E-92A/B 1

2 3

4 5

6 7

8 1

2 3

4 5

6 1

2 3

1 2

3 4

9 10 11 12 13 14 15 16 17 18 19 20 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1

2 3

4 5

6 7

8 XX XX Equipment Ceiling XX XX Floors Walls MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Service Building Hot Side 21 ft Survey Package A0900 Figure 2-50 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN RCA Boundary RP Checkpoint Meter Cal RP Count Room Chemistry Offices Chemistry Lab Meter Room RCA Boundary RP Offices Dosimetry Men's Restroom Men's Locker Room Dress Out Room Respirator Room Hot Shop Tool Room MOVAT Room Seal Rebuild Room Women's Restroom XX Equipment Ceiling XX Floors Walls 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 1

2 3

4 5

6 7

1 2

3 4

5 6

7 8

1 2

3 4

1 2

3 4

1 2

3 4

5 6

7 8

9 1

2 3

4 5

6 1

2 3

4 5

6 7

8 9

XX 1

2 3

4 5

1 2

1 2

3 1

2 3

4 5

6 1

1 2

1 2

3 4

1 1

1 1

1 1

1 1

1 2

3 4

5 6

7 8

9 10 11 1

2 1

2 1

1 1

2 3

4 5

6 7

8 1

1 05EQ1 05EQ2 05EQ3 05EQ4 05EQ5 05EQ6 Survey Unit 08 Survey Unit 07 Survey Unit 06 Survey Unit 05 Survey Unit 04 Survey Unit 01 Survey Unit 03 Survey Unit 02 XX MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Low Level Waste Storage Building 21 ft Survey Package A1100 Figure 2-51 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 31 30 32 33 34 35 36 37 38 39 40 41 42 43 44 45 1

2 3

4 5

6 XX Walls Lower (01WL1)

XX XX Equipment (01EQ1)

Floors (01FL1)

N 1

2 3

4 5

6 7

8 9

10 11 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Low Level Waste Storage Building 21 ft Survey Package A1100 Figure 2-52 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN XX XX Stairs (01SW1)

Walls Upper (01WU1)

XX XX Ceiling #2 (01CL2)

Ceiling #1 (01CL1)

N 1

2 3

4 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 3

4 1

2 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Low Level Waste Storage Building 21 ft Office Survey Package A1100 Figure 2-53 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

XX XX Equipment (02EQ1)

Walls (01WS1)

XX XX Ceiling #2 (02CL1)

Floor (02FL1) 1 2

3 4

5 6

7 8

9 10 11 12 13 14 1

2 3

4 5

6 7

5 1

2 3

4 1

2 3

4 5

MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization RCA Storage Building Survey Package A1200 Figure 2-54 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

Berm HIC Jib Crane Jib Crane Berm Decon Pad TK-109 TK-85 TK-95 XX XX Upper Walls (01WU1)

Equipment (01EQ1)

XX XX Ceiling (01CL1)

Floor (01FL1) 1 2

3 4

5 6

7 8

9 10 1

2 3

4 5

6 7

8 9

10 11 12 1

2 3

4 5

6 XX 8

9 10 11 12 13 14 15 16 17 18 19 20 1

2 3

4 5

6 7

8 9

10 1

2 3

4 5

6 7

8 Lower Walls (01WL1)

XX MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Equipment Hatch Area 21ft Survey Package A1300 Figure 2-55 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

XX XX Walls (01WS1)

Equipment (01EQ1)

XX XX Ceiling (01CL1)

Floor (01FL1) 1 2

3 4

5 6

7 8

9 10 11 12 1

2 3

1 2

3 4

5 6

7 8

9 10 1

2 3

4 5

MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Personnel Hatch Area 21ft Survey Package A1400 Figure 2-56 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

Ventilation Units UP Filter Banks Personnel Hatch Wall Vent 130 129 XX XX Walls Equipment XX XX Ceiling Floor 1

2 3

4 5

6 7

8 9

10 11 12 1

2 3

4 5

5 6

7 8

9 10 1

2 3

4 1

2 1

2 3

4 3

4 1

2 3

4 5

6 1

2 3

4 5

2 01FL1 01CL1 01EQ1 01WS1 02WS1 02EQ1 02CL1 02FL1 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Mechanical Penetration Room 21 ft Survey Package A1500 Figure 2-57 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

Mechanical Penetration Room TK-25 P-25B XX XX Walls Equipment XX XX Floor Drain Floor 1

2 3

4 5

6 7

8 1

2 3

4 5

6 7

8 9

10 1

2 3

4 2

1 1

2 01EQ1 01EQ2 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Mechanical Penetration Room Elevations 2, 3, 4, and 5 Survey Package A1500 Figure 2-58 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

XX Equipment XX XX Ceiling Floor 1

2 3

1 2

1 2

3 4

1 2

3 4

1 2

3 4

5 6

1 2

1 1

1 1

1 1

1 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Electrical Penetration Room Bottom Level Survey Package A1600 Figure 2-59 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

XX Equipment XX XX Walls Floor 1

2 3

1 2

1 1

2 3

bk bk bk bk bk bk

Background

bk MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Containment Spray Building 4 ft and 6 ft Elevations Survey Package A1700 Figure 2-60 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

Spray Building Elevation 4'-0 Spray Building Elevation 6-0 XX Walls Stairs XX XX Equipment XX XX Ceiling Floor 14 1

2 3

4 5

6 7

8 9

10 11 12 13 1

2 3

4 5

6 7

1 2

3 4

5 6

7 8

1 2

3 4

1 2

3 4

1 2

3 4

5 6

7 8

9 10 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 1

2 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Containment Spray Building 12 ft and 21 ft Elevations Survey Package A1700 Figure 2-61 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

Elevation 21'-0" Elevation 12'-0" UP DN UP UP XX Walls 03WS1 Stairs 03SW1 XX XX XX Ceiling 03CL1 Floor 03FL1 Floor Opening 7

6 5

4 3

8 9

10 2

1 12 1

2 3

4 5

6 7

1 2

3 4

5 6

7 1

2 3

4 5

1 2

3 4

1 2

3 4

1 2

02FL1-Floor 02WS1-Walls 02EQ1-Equipment 02CL1-Ceiling 02SW2 2 samples 02SW1 2 samples 03-Survey Unit MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Containment Spray Building 14 ft Elevation Survey Package A1700 Figure 2-62 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

Spray Building 14'-0" (Motors)

Walls XX XX Floor 1

2 3

4 5

6 7

8 9

10 1

2 3

4 5

6 7

8 9

10 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Auxiliary Feed Pump Room 21 ft Survey Package A1800 Figure 2-63 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

ATW-A-201 AFW-A-39 Primary Vent Stack CTMT APD Rock Room CTMT Purge Valves TK-89 Chemical Addition Tank ALT S.D.

Panel AFW-A-101 P-25-C P-25-A Walls 01WS1 XX XX Floor 01Fl1 XX XX Equipment 01EQ1 Ceiling 01CL1 1

2 5

6 7

8 9

10 11 12 1

2 3

4 5

6 7

8 9

10 1

2 3

4 1

2 3

4 5

6 3

4 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Equipment Access Area 21 ft Survey Package A1900 Figure 2-64 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

UP Spray Pump Area Heating & Ventilation Unit Purge Air Supply Unit HV-9 HV-7 Walls XX XX Floor XX XX Equipment Ceiling 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 1

2 3

4 5

6 1

2 3

4 5

6 7

8 9

10 11 12 13 14 1

2 3

4 5

6 1

2 3

4 5

6 7

8 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Reactor Water Storage Tank Survey Package A2100 Figure 2-65 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

CS-72 CS-65 CS-66 CS-68 LSI-M-41 LSI-M-40 SIA-A-57 SIA-A-56 HSI-54 HSI-53 HSI-52 CPU-23 HSI-M-51 HSI-M-50 CS-67 CS-73 CS-M-71 XX XX Greenhouse Floor 02FL1 Greenhouse Interior Walls 02WS1 XX XX Equipment 02EQ1 Greenhouse Ceiling (plastic) 02CL1 XX XX XX Greenhouse Ceiling (I-Beams) 02CL2 Tank Base 01WE1 Greenhouse Exterior Walls 02WE1 1

2 3

4 5

6 7

8 9

10 1

2 3

4 5

1 2

3 4

5 6

1 2

3 4

5 6

7 8

1 2

3 4

5 6

7 8

1 2

3 1

2 3

MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Borated Water Storage Tanks Survey Package A2200 Figure 2-66 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

XX XX Floor Wall XX Equipment Sump XX "A" BWST 36'-0" FHB "B" BWST SUMP SUMP 1

2 3

4 5

6 7

8 9

10 11 12 13 1

2 3

4 5

6 7

8 9

10 11 1

2 3

4 5

6 1

2 3

4 5

6 1

2 3

4 5

6 7

8 9

10 11 12 13 1

2 3

4 5

6 7

8 9

10 11 S

S MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Primary Storage Tank Area Survey Package A2300 Figure 2-67 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

21'-0" FHB XX XX Shed Wall Inside 02WS1 Tank Base 01SS1 XX XX Equipment 02EQ1 Tank Outside 01WE1 XX Shed Ceiling 02CL1 1

2 3

4 5

6 7

8 1

2 3

4 5

6 7

8 1

2 3

1 2

3 4

1 2

Note: 2 points also taken on shed roof, not shown 02RF1 4

MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Test Tanks 21 ft Survey Package A2400 Figure 2-68 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

TT-B TT-A XX XX 02WE1 02SS1 XX 02EQ1 01WE1 XX 01EQ1 XX 01SS1 XX 1

2 5

1 2

3 4

5 6

7 8

1 3

4 5

1 2

3 4

5 6

7 8

1 2

4 3

3 4

5 1

5 2

1 4

2 3

MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Control Room & Computer Room Survey Package B0200 Figure 2-69 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

NSE OFFICE PSS OFFICE SECURITY SOS DESK ALCOVE Floor XX Ceiling XX Walls XX XX BK XFW Equipment

Background

Cable Tunnel 03FW1 2FW 3FW 1FW 1

2 3

4 5

6 7

8 9

1 2

3 4

1 2

3 4

5 6

7 1

2 3

4 5

1 2

3 4

5 1

2 3

4 5

BK BK BK BK BK BK BK BK BK BK 02FL1 01FL1 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Fire Pump House Survey Package B0400 Figure 2-70 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

Floor 01FL1 XX Ceiling 01CL1 XX Walls 01WS1 XX XX X

Equipment 01EQ1 Sediment Sample Floor Drain 01FD1 1

2 3

4 5

6 7

8 1

2 3

4 5

1 2

3 4

5 6

2 7

1 2

3 2

1 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Turbine Building 21 ft Survey Package B0500 Figure 2-71 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

Ceiling 01EQ1 XX Stairways 01WS1, 01WS2,... 01WS6 XX Cable Trays 01CL1 XX XX Horizontal Supports 01CL2 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 1

2 3

4 5

6 7

8 9

10 1

2 3

4 5

7 8

9 10 1

2 3

4 5

6 6

MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Turbine Building 21 ft Survey Package B0500 Figure 2-72 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

7 Walls XX Floor XX 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 31 32 33 1

2 3

4 5

6 7

8 9

10 01WS3 5 Sample Points 1

2 3

4 5

6 8

9 10 11 12 13 14 15 7

01WS2 8 Sample Points BKG 1 BKG 5 BKG 3 BKG 2 BKG 6 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Service building Cold Side 21 ft Survey Package B0700 Figure 2-73 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

RP Checkpoint RCA Boundary Women's Lock Room Dosimetry RP Offices Lunch Room Plant Services Maintenance Stock Room Men's Locker Room Upstairs Walls XX Floor XX Survey Unit 07 Survey Unit 06 Survey Unit 05 Survey Unit 03 Survey Unit 04 Survey Unit 08 Survey Unit 02 1

2 3

4 1

2 3

4 5

6 7

8 9

10 1

2 3

4 1

2 3

1 2

3 4

1 2

3 4

5 6

7 8

9 10 11 2

3 4

5 6

5 6

7 8

9 10 11 12 4

5 6

1 6

5 4

3 2

1 8

2 3

4 7

1 2

3 4

1 2

3 3

2 1

2 3

1 1

2 3

4 5

6 1

2 3

4 5

6 7

8 9

10 1

2 3

4 5

6 7

8 9

10 11 12 13 1

1 1

SW1 1

1 1

1 1

1 1

1S 1D EQ1 EQ2 03SW1 04EQ1 04EQ2 05EQ3 05EQ1 05EQ2 XX XX Ceiling Equipment Drain XX XX Sink 1

MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Fuel Oil Storage Building Survey Package B0800 Figure 2-74 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN 7

2 3

4 5

6 1

1 2

3 4

5 1

1 2

1 2

1 8

9 10 11 12 13 14 15 1

2 3

4 5

6 7

8 9

10 EQ-2 EQ-2 EQ-3 EQ-4 EQ-1 EQ-4 bk XX XX XX XX Walls Floor Ceiling Equipment bk Background Survey Unit 01 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Diesel Generators Survey Package B0900 Figure 2-75 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

XX XX XX XX Walls Floor Ceiling Equipment bk Background 1

2 3

4 5

6 7

8 9

1 2

3 4

5 6

7 8

9 1

2 3

4 1

2 3

4 1

2 3

4 5

6 1

2 3

4 5

6 5

1 2

5 3

4 1

2 3

4 5

bk bk bk bk bk bk bk bk bk bk bk bk bk bk bk bk bk bk bk bk bk "B" Survey Unit 02 "A" Survey Unit 01 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Auxiliary Boiler Room Survey Package B1000 Figure 2-76 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

XX XX XX XX Walls Floor Ceiling Equipment bk Background 1

2 3

4 5

6 1

2 3

4 5

6 7

8 1

2 3

4 5

1 2

1 1

1 1

bk bk bk bk bk bk bk bk bk bk bk EQ-5 EQ-4 EQ-3 EQ-2 EQ-1 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Recirc Water Pump House Lower Elevation Survey Package B1100 Figure 2-77 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

XX XX XX Walls Floor Equipment 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 1

2 3

4 5

6 7

8 9

10 1

2 3

4 5

MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Recirc Water Pump House Upper Elevation Survey Package B1100 Figure 2-78 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

XX XX XX Walls 02WS1 Floor 02FL1 Equipment 02EQ1 XX Ceiling 02CL1 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 1

2 3

4 5

6 7

8 9

10 1

2 3

5 1

2 3

5 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Administration Building Front office Survey Package B1100 Figure 2-79 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

XX XX XX Walls 01WS1 Floor 01FL1 Equipment 01EQ1, Q2, Q3 XX Ceiling 01CL1 bk Background 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 1

2 3

4 1

2 3

bk bk bk bk bk bk bk bk bk bk bk bk MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization New Office Building (WART Bldg.)

Survey Package B1300 Figure 2-80 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

First Floor / I & C Shop XX XX XX Walls 01WS1, 02WS1, 03WS1 Floor 01FL1, 02FL1, 03FL1 Equipment XX Ceiling 01CL1, 02CL1, 03CL1 1

2 3

4 5

6 7

8 9

10 11 12 1

2 3

4 5

6 7

8 1

2 3

4 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Visitor and Information Center Survey Package B1400 Figure 2-81 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

XX XX XX Walls 01WS1, 02WS1, 03WS1 Floor 01FL1, 02FL1, 03FL1 Equipment XX Ceiling 01CL1, 02CL1, 03CL1 A

B C

D E

F G

H J

K L

M N

1 2

3 4

5 6

7 8

9 10 11 12 2

1 6

4 3

5 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 22 21 23 24 25 26 27 28 29 30 1

2 3

4 5

6 7

8 9

10 11 12 14 13 15 1

2 3

4 6

7 9

1 7

12 13 18 19 24 25 30 C

B A

12 24 36 48 60 72 84 96 1

13 25 37 49 61 73 85 Area Where Carpet Removed MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Warehouse 2 Survey Package B1500 Figure 2-82 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

XX XX XX Walls 02WC1 Floor 01FL1 Ceiling 02WC1 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 24 25 26 28 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 23 27 29 30 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Training Annex Survey Package B1600 Figure 2-83 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

XX XX XX Walls 01WS1 Floor 01FL1 Ceiling 01CL1 XX Equipment 01EQ1 1

2 3

4 5

1 2

3 4

5 6

7 8

9 10 11 12 13 14 15 1

2 3

4 5

6 7

8 9

10 11 12 13 14 1

2 3

4 5

6 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Staff Building 1st Floor (22ft)

Survey Package B1700 Figure 2-84 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

107 105 106 110 111 124 119 114 103 116 118 120 123 121 UP UP DN XX XX XX Walls 01WS1 Floor 01FL1 Stairwell 01SW1 XX Ceiling 01CL1 25 29 24 30 21 17 18 24 9

23 26 14 25 22 27 28 21 2

29 30 1

1 8

23 1

3 4

5 6

7 8

10 11 12 13 15 16 17 18 19 1

2 27 4

5 7

20 8

9 10 11 6

26 28 19 12 13 14 15 16 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Spare Generator Building Survey Package B1800 Figure 2-85 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

XX XX Walls Ceiling XX Equipment 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 1

2 3

4 5

1 2

3 4

5 Platform Over Tank MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Environmental Services Building Survey Package B1900 Figure 2-86 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

XX XX XX Walls 02WC1 Floor 02FL1 Ceiling 03WC1 XX Fume Hood (All internal surfaces) 02MO1 Attic Floor 03Fl1; Stairway 02SW1 Bathroom Floor and Walls 02FW1 Ground Floor Walls and Ceiling 02WC1 1

2 3

5 6

1 4

1 2

3 2

6 5

4 1

1 2

MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Environmental Services Building Basement Survey Package B1900 Figure 2-87 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

XX XX XX Walls 01WC1 Floor 01FL1 Soil Sample 1

2 3

1 2

3 1

2 Oil Tank Heating Unit MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Bailey Barn Survey Package B2000 Figure 2-88 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

XX XX XX Walls Floor

Background

XX Ceiling 01FL1 1

2 3

4 1

2 3

4 5

6 7

8 9

10 11 1

2 3

4 5

6 7

8 9

10 11 12 13 14 1

2 3

MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Lube Oil Storage Room 21 ft Survey Package B2100 Figure 2-89 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

XX XX XX Walls Floor Equipment XX Ceiling bk Background 1

2 3

4 1

1 1

2 3

4 1

2 bk bk bk bk bk bk bk bk bk bk bk bk EQ-2 EQ-1 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Cold Machine Shop Turbine Building 21 ft Survey Package B2200 Figure 2-90 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN N

XX XX XX Walls Floor Equipment XX Ceiling bk Background 1

2 3

4 5

6 1

1 1

1 1

2 3

4 5

6 1

2 3

4 bk bk bk bk bk bk bk bk bk bk bk bk EQ-4 EQ-3 EQ-2 EQ-1 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Staff building Tunnel Survey Package B2400 Figure 2-91 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN XX XX Walls 01WS1 Floor 01FL1 XX Stairwell 1

2 3

4 5

6 7

8 9

10 11 12 1

2 3

4 5

6 7

8 1

1 01SW2 01SW1 N

MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization Staff building Tunnel Survey Package B2400 Figure 2-92 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN XX Equipment XX Ceiling 1

1 1

1 1

2 3

4 5

6 01EQ3 01EQ4 01EQ1 01EQ5 N

MYAPC License Termination Plan Revision 1 June 1, 1001

01FL1 01FL2 FIRST AID 04WS1 Northwest Stairwell Exit East Tower Exit Garage Exit Background Survey Floor Mechanical Equipment Room Switchgear Room 01WS1 Mechanical Equipment Site Characterization CMP Building Augusta Figure 2-93 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package B9800 MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization CMP building Augusta Survey Package B9800 Figure 2-94 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN First Aid 01WS1 Switchgear Room Corridor

Background

Wall Survey 7

6 5

4 3

2 1

14 13 12 11 10 9 8 15 16 XX Approximate location of survey point.

MYAPC License Termination Plan Revision 1 June 1, 1001

First Aid Background Survey Tile Walls First Aid/Bathroom 04WS1 Switchgear Room Site Characterization CMP Building Augusta Figure 2-95 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package B9800 16 17 15 14 13 12 18 19 20 21 Switchgear XX Approximate location of survey point.

MYAPC License Termination Plan Revision 1 June 1, 1001

01FL2 Mechanical Equipment Site Characterization CMP Building Augusta Figure 2-96 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package B9800 Floor-Garage Exit Background Survey 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 XX Approximate location of survey point.

MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization CMP Building Augusta Figure 2-97 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package B9800 Mechanical Equipment Room Background Survey 18 19 20 21 21 22 23 24 25 26 27 28 29 30 31 32 XX Approximate location of survey point.

MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization CMP Building Augusta Figure 2-98 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package B9800 2nd Floor Men's Bathroom Tile Wall 22 23 24 25 26 Background Survey 04WS1 XX Approximate location of survey point.

MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization CMP Building Augusta Figure 2-99 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package B9800 2nd Floor Men's Bathroom Tile Wall 22 23 24 25 26 Background Survey 04WS1 XX Approximate location of survey point.

MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization CMP Building Augusta Figure 2-100 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package B9800 3rd Floor Women's Bathroom Tile Wall Background Survey 1

BK 2

3 4

5 6

7 8

BK 11 10 9

XX Approximate location of survey point.

MYAPC License Termination Plan Revision 1 June 1, 1001

Site Characterization CMP Building Augusta Figure 2-101 MAINE YANKEE ATOMIC POWER CO.

LICENSE TERMINATION PLAN Survey Package B9800 4th Floor Men's Bathroom Tile Wall 27 28 29 30 31 Background Survey 04WS1 32 XX Approximate location of survey point.

MYAPC License Termination Plan Revision 1 June 1, 1001

MYAPC License Termination Plan Revision 1 June 1, 2001