Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Section 8.2, Offsite Power System
ML17046A442
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/30/2017
From:
Public Service Enterprise Group
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17046A230 List: ... further results
References
LR-N17-0034
Download: ML17046A442 (4)


Text

8.2 OFFSITE POWER SYSTEM 8.2.1 Description Each unit generates electric power at 25 kV which is fed through an isolated phase bus to the main transformer bank where it is stepped up to 500 kV and delivered to the switching station. The 500-kV switching station design incorporates a breaker-and-a-half scheme for high reliability and is connected to three 500-kV transmission lines. Two transmission lines go north via separate rights-of-way to two major switching stations: Public Service Electric & Gas (PSE&G) New Freedom Switching Station and Atlantic City Electric's Orchard Switching Station. The New Freedom Switching Station is solidly connected to the PSE&G 230-kV bulk power system via four 500/230-kV autotransformers. Orchard Switching Station is also connected to Atlantic City Electric's 230-kV bulk power system via a autotransformer. In addition, it is connected to the Pennsylvania/New Jersey/Maryland 500-kV interconnected system. The third transmission line serves as a tie line to the adjacent Hope Creek 500-kV switchyard which is also integrated into the Pennsylvania/New Jersey/Maryland 500-kV interconnected system. All three 500-kV power lines are available for either or both units. Site transmission lines are routed as shown on Plant Drawing 205415. A one-line diagram of the 500-kV switching station Electrical System is shown on Figure 8.2-2. There are no present plans to incorporate automatic load dispatching for the Salem units. 8.2.2 Analysis Reliability considerations to minimize the possibility of power failure due to faults in the network interconnections and the associated switching are as follows: SGS-UFSAR 8.2-1 Revision 27 November 25, 2013

1. Each of the three transmission lines takes a separate route to its destination 2. The breaker-and-a-half switching scheme in the 500-kV switching station 3. Primary and backup relaying systems have been provided for each circuit along with circuit breaker failure protection 4. Two independent de circuits are provided for each 500-kV breaker from the two independent and separate sources of de control power which are supplied to the 500-kV switchyard from the station batteries. Loss of either de source will not prevent connection of the station auxiliary power system to a 500-kV source. System network performance has been analyzed and evaluated on a computer model for critical three-phase faults cleared by primary relay protection. The Salem nuclear units are stable for the following postulated conditions: 1. Loss of One Salem Nuclear Unit For the loss of one of the two Salem nuclear units (i.e., a fault in the generator or in its step-up transformer), the remaining Salem nuclear unit is stable. From the stability standpoint, the loss of a Salem unit is less severe than the loss of the most critical line as described below. 2. Loss of Largest Generating Unit on the Grid SGS-UFSAR The largest generators on the system are the Salem units. Therefore, the results of 111" above apply. 8.2-2 Revision 6 February 15, 1987
3. Loss of the Most Critical Transmission Line There are three 500-kV transmission outlets from Salem Generat one to New Freedom Switching and one to the adjacent one to Orchard Creek 500-kV switchyard. For stability analysis purposes, a three-phase fault at Salem v.1as simulated on each of the three 500-kV circuits. A fault on the Salem-Hope Creek 500-kV line is the most critical line fault in evaluat:ing Salem stabi.l.ity. units will remain stable. Studies conditions such as Hope Creek For a fault on this line the Salem for Red Lion 500-kV or East Windsor New Freedom 500-kV line having an extensive outage, have indicated that the most critical condition is disconnection of the East Windsor -New Freedom or the Hope Creek -Red Lion 500-kV line respectively. In such a situation to maintain System Stability, the tripping of one of the Salem Units is required. The relay was modified to this The above considerations mir.imize the of loss of more than one offsite power source. In the event of a loss of all offsite power sources, the Engineered Safeguards will be supplied from the standby ac power supply {see Section 8.3.1.5). 8.2-3 SGS-UFSAR Revision 25 October 26, 2010 Emergency lighting is provided throughout various areas of the plant where operator action may be required. In addition, 8-hour battery pack lights have been provided in selected areas of the plant as part of the fire protection program. Sufficient lighting exists for postulated loss of ac power events. No action is required for these lights to be operational. 8.2-4 SGS-UFSAR Revision 15 June 12, 1996