LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Section 17.1, Quality Assurance During the Design and Construction Phases

From kanterella
Jump to navigation Jump to search
Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Section 17.1, Quality Assurance During the Design and Construction Phases
ML17046A582
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/30/2017
From:
Public Service Enterprise Group
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17046A230 List: ... further results
References
LR-N17-0034
Download: ML17046A582 (1)


Text

SECTION 17 QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING THE DESIGN AND CONSTRUCTION PHASES This section is not applicable since these phases are completed. See Appendix D of Amendment 43 to FSAR for the Quality Assurance Program applicable during design and construction. 17.1-1 SGS-UFSAR Revision 6 February 15, 1987