LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Section 14.2, Initial Tests and Operation

From kanterella
Jump to navigation Jump to search
Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Section 14.2, Initial Tests and Operation
ML17046A551
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/30/2017
From:
Public Service Enterprise Group
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17046A230 List: ... further results
References
LR-N17-0034
Download: ML17046A551 (1)


Text

14.2 INITIAL TESTS AND OPERATION 14.2.1 Testing Program Description Prior to initial core loading, a comprehensive testing program was conducted to ensure that all plant systems were properly prepared to support fuel loading and subsequent nuclear testing. To accomplish this, preoperational and operational testing was completed on all systems except for those tests which required the core to be in place. For this reason, operational testing of the Control Rod System and In-core Monitoring System were deferred until after fuel loading. 14.2.2 Test Objectives In the development of the System Operational Test Program, Public Service Electric & Gas complied with the intent of Regulatory Guide 1.68, dated November 1973. Table 14.2-1 depicts, in their approximate sequence, the tests performed. The program included many nonsafety-related tests and, therefore, exceeded the requirements of the Regulatory Guide. 14.2-1 SGS-UFSAR Revision 6 February 15, 1987