MONTHYEARLIC-12-0027, License Amendment Request (LAR) 12-02, Proposed Change to Relocate Operating and Surveillance Requirements for Technical Specifications 217 and 3.13 Concerning Miscellaneous Radioactive Material Sources2012-03-0909 March 2012 License Amendment Request (LAR) 12-02, Proposed Change to Relocate Operating and Surveillance Requirements for Technical Specifications 217 and 3.13 Concerning Miscellaneous Radioactive Material Sources Project stage: Request ML1210706522012-04-16016 April 2012 Acceptance Review Email, Relocate Technical Specification Limiting Condition for Operation 2.17, Miscellaneous Radioactive Material Sources, and Surveillance Requirement 3.13 to Updated Safety Analysis Report Project stage: Acceptance Review ML12284A1012012-10-24024 October 2012 Request for Additional Information, Request to Relocate Technical Specification Limiting Condition for Operation 2.17, Miscellaneous Radioactive Material Sources, and Surveillance Requirement 3.13 to Updated Safety Analysis Report Project stage: RAI LIC-12-0161, OPPD Response to NRC Request for Additional Information (RAI) Regarding Miscellaneous Radioactive Material Sources License Amendment Request2012-10-31031 October 2012 OPPD Response to NRC Request for Additional Information (RAI) Regarding Miscellaneous Radioactive Material Sources License Amendment Request Project stage: Response to RAI ML13070A0422013-03-29029 March 2013 Issuance of Amendment No. 271, Relocate Technical Specification LCO 2.17, Miscellaneous Radioactive Material Sources, and Surveillance Requirement 3.13 to Updated Safety Analysis Report Project stage: Approval 2012-03-09
[Table View] |
|
---|
Category:Letter type:LIC
MONTHYEARLIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-22-0006, Reactor Head Disposition Project Overview2022-03-17017 March 2022 Reactor Head Disposition Project Overview LIC-22-0004, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2022-02-17017 February 2022 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-21-0008, Organizational and Management Change2021-10-28028 October 2021 Organizational and Management Change LIC-21-0007, ISFSI Only Emergency Plan Update2021-09-0808 September 2021 ISFSI Only Emergency Plan Update LIC-21-0004, Radiological Effluent Release Report and Radiological Environmental Operating Report2021-04-29029 April 2021 Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-21-0003, Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report2021-03-30030 March 2021 Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-21-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-22022 February 2021 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0015, Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092)2020-07-29029 July 2020 Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092) LIC-20-0014, Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2020-07-15015 July 2020 Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-20-0012, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2020-05-18018 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool LIC-20-0011, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-05-0707 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0009, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2020-04-30030 April 2020 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-20-0008, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-04-13013 April 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0006, (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2020-03-26026 March 2020 (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E LIC-20-0004, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-03-10010 March 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-02-27027 February 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0002, Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan2020-02-27027 February 2020 Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan LIC-20-0001, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-02-0606 February 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0025, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-12-19019 December 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0007, Post-Shutdown Decommissioning Activities Report2019-12-16016 December 2019 Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-19-0022, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-11-18018 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0018, Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2019-11-14014 November 2019 Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-19-0020, Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis2019-10-17017 October 2019 Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis LIC-19-0017, Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 20042019-08-0808 August 2019 Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 An LIC-19-0010, License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associa2019-05-20020 May 2019 License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated LIC-19-0008, Submittal of 2018 Annual Report2019-04-0404 April 2019 Submittal of 2018 Annual Report LIC-19-0004, Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP)2019-03-28028 March 2019 Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP) LIC-19-0005, 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report2019-03-28028 March 2019 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report LIC-19-0001, License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2019-02-28028 February 2019 License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme LIC-19-0003, Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation R2019-02-28028 February 2019 Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation Requ LIC-19-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-01-0303 January 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-18-0031, Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update2018-12-17017 December 2018 Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update LIC-18-0030, Request for Partial Site Release Phase 22018-11-12012 November 2018 Request for Partial Site Release Phase 2 LIC-18-0028, Letter of Intent to Submit Request for Additional Partial Site Release2018-10-18018 October 2018 Letter of Intent to Submit Request for Additional Partial Site Release LIC-18-0027, Submittal of Foreign Ownership, Control or Influence Five-Year Renewal Filing and NRC Facility Clearance Update2018-10-0303 October 2018 Submittal of Foreign Ownership, Control or Influence Five-Year Renewal Filing and NRC Facility Clearance Update LIC-18-0003, License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool2018-09-28028 September 2018 License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool LIC-18-0025, Guarantee of Payment of Deferred Premiums for the Period of July 1, 2018 to June 30, 20192018-07-19019 July 2018 Guarantee of Payment of Deferred Premiums for the Period of July 1, 2018 to June 30, 2019 LIC-18-0023, Fort Calhoun Station, Unit 1 Request for Partial Site Release2018-06-29029 June 2018 Fort Calhoun Station, Unit 1 Request for Partial Site Release LIC-18-0021, Transmittal of Revision 3 to the Physical Security Plan (PSP) and Revision 4 to the FCS Protective Strategy (Safeguards Contingency Plan)2018-06-0606 June 2018 Transmittal of Revision 3 to the Physical Security Plan (PSP) and Revision 4 to the FCS Protective Strategy (Safeguards Contingency Plan) LIC-18-0017, Submittal of Revision 2 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) and Revision 3 of the FCS Protective Strategy2018-04-26026 April 2018 Submittal of Revision 2 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) and Revision 3 of the FCS Protective Strategy 2023-08-24
[Table view] |
Text
- - - - - - - - -
October 31, 2012 LlC-12-0161 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington , D.C. 20555
References:
- 1. Docket No. 50-285
- 2. Letter from OPPD (D. J. Bannister) to NRC (Document Control Desk),
"License Amendment Request (LAR) 12-02, Proposed Change to Relocate Operating and Surveillance Requ.irements for Technical Specifications 2.17 and 3.13 Concerning Miscellaneous Radioactive Material Sources," dated March 9, 2012 (LlC-12-0027)
- 3. Letter from NRC (L. E. Wilkins) to OPPD (L. P. Cortopassi), "Fort Calhoun Station, Unit No.1 - Request for Additional Information Regarding License Amendment Request to Relocate Operating and Surveillance Requirements for Technical Specifications 2.17 and 3.13 Concerning Miscellaneous Radioactive Material Sources (TAC ME8220)," dated October 24, 2012 (ML12284A101) (NRC-12-0098)
Subject:
OPPD Response to NRC Request for Additional Information (RAI) Regarding Miscellaneous Radioactive Material Sources License Amendment Request In Reference 3, the NRC requested additional information regarding the Omaha Public Power District's (OPPD) license amendment request (Reference 2) relocating Technical Specification (TS) requirements for miscellaneous radioactive material sources to the Updated Safety Analysis Report. OPPD's response is attached .
If you should have questions, please contact Mr. Bill Hansher at (402) 533-6894.
I declare under penalty of perjury that the foregoing is true and correct. Executed on October 31, 2012 .
Sincerely, Michael J. Prospero Plant Manager MJPIDMB/mle Attachment Employment with Equal Oppor1unity
LIC-12-0161 Attachment Page 1 REQUEST FOR ADDITIONAL INFORMATION FORT CALHOUN STATION, UNIT NO. 1 MISCELLANEOUS RADIOACTIVE MATERIAL SOURCES LAR By letter dated March 9, 2012, Omaha Public Power District (the licensee) requested an amendment (LAR) to the Renewed Facility Operating License No. DPR-40 for Fort Calhoun Station (FCS), Unit No.1. The proposed amendment would relocate Technical Specifications (TS) Limiting Condition of Operation (LCO) 2.17, Miscellaneous Radioactive Material Sources, and the associated surveillance requirement (SR) 3.13, Radioactive Material Sources Surveillance, from the FCS TS. NUREG-1432, Standard Technical Specifications, Combustion Engineering Plants, Revision 3, does not contain a TS or SR for radioactive source surveillance.
The NRC staff has determined that the information specified below is needed for the staff to complete its evaluation.
NRC Question 1:
Section 4.1.3 of the LAR [License Amendment Request] lists two references as approved Methodologies - Regulatory Guide (RG) 8.21, Revision 1, October 1979 and NUREG-1556, Volume 11. Please identify the specific guidance in these two documents that are being referenced. In addition, please verify that the guidance in RG 8.21 for leak testing sources will be incorporated into the FSAR.
OPPD Response Amendment 11, issued February 4, 1976, placed Limiting Condition for Operation (LCO) 2.17 and Surveillance Requirement (SR) 3.13 into Facility Operating License No. DPR-40. OPPD requested those Technical Specification (TS) changes to comply with a letter from the Atomic Energy Commission (AEC) dated December 16, 1974 (Reference 1). The AEC letter proposed a more generalized approach for nuclear power plants regarding receipt, possession and use of byproduct, source and special nuclear material that was consistent with the provisions of Regulatory Guide (RG) 1.70.3, Radioactive Materials Safety for Nuclear Power Plants, dated February 1974.
However, RG 1.70.3 is no longer an active Regulatory Guide. Regulatory Guide 8.21 and NUREG-1556, Volume 11 were listed as approved methodologies because of their general applicability to the evaluation of radiation hazards associated with the production, use, release, disposal, or presence of radioactive materials or other sources of radiation whether at a power reactor like FCS or at a facility processing byproduct material or manufacturing such material for distribution.
LIC-12-0161 Attachment Page 2 For example, RG 1.70.3 dated November 1974, references several Occupational Health (Division 8) Regulatory Guides including RG 8.10, Operating Philosophy for Maintaining Occupational Exposure as Low as is Reasonably Achievable. RG 8.21 also references RG 8.10 because keeping radiation exposure ALARA (as low as is reasonably achievable) is as critical at facilities processing byproduct material or manufacturing such material for distribution as it is at power reactors.
As shown in the markup provided with the LAR, OPPD is relocating TS 2.17 and SR 3.13, which have requirements for leak testing of byproduct, source, and special nuclear materials to Section 11.2 of the Updated Safety Analysis Report. It is unnecessary to incorporate RG 8.21 guidance concerning leak testing of sources into the USAR because other than minor editorial changes to meet the format of the USAR, the requirements of the LCO and SR are unchanged from those requested of OPPD by the AEC in its 1974 letter (Reference 1). Once relocated to the USAR, future changes are subject to the controls of 10 CFR 50.59, which ensures that if necessary, NRC approval is obtained beforehand.
The Final Commission Policy Statement on Technical Specifications for Nuclear Power Reactors, dated July 22, 1993 (Reference 2), concluded that those existing TS requirements, which do not satisfy the screening criteria specified in regulation 10 CFR 50.36, may be deleted from the TS, and the requirements established in licensee-controlled documents, subject to the controls of 10 CFR 50.59. The miscellaneous radioactive material sources LCO and SR do not meet any of the screening criteria of 10 CFR 50.36(c)(2)(ii), which is supported by the absence of these requirements in NUREG-1432, Standard Technical Specifications - Combustion Engineering Plants.
NRC Question 2 Please verify that the text to be added to the FSAR will be contained in Chapter 16 as part of the Technical Requirements Document.
OPPD Response OPPD has custom TS and does not have a Technical Requirements Document (Manual). As stated above, the changes will be incorporated into USAR Section 11.2.
References
- 1. Letter from NRC (G. Lear) to OPPD (J. L. Wilkins), Information Regarding Application for License Amendment Regarding Special Nuclear, Byproduct, and Source Material, dated December 16, 1974 (NRC-74-0089).
- 2. NRC "Final Policy Statement on Technical Specifications Improvement for Nuclear Power Reactors" (58 FR 39132, dated July 22, 1993).