L-PI-14-016, Readiness for 95001 Inspection
| ML14031A390 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 01/31/2014 |
| From: | Davison K Northern States Power Co, Xcel Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-PI-14-016 | |
| Download: ML14031A390 (2) | |
Text
(l Xcel Energy JAN 3 1 2014 U S Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Unit 2 Docket 50-306 Renewed License No. DPR-60 L-PI-14-016 Prairie Island Nuclear Generating Plant (PINGP) Readiness for 95001 Inspection
References:
(1) Letter from the Nuclear Regulatory Commission to Mr. Jim Lynch, Site Vice President, Prairie Island Nuclear Generating Plant, dated February 25, 2013, "Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Unit 2" (ADAMS Accession Number ML13056A511)
(2) Letter from NSPM to NRC dated November 25, 2013, "Prairie Island Nuclear Generating Plant (PINGP) Readiness for 95001 Inspection" (ADAMS Accession Number ML13329A495)
In December 2012, the Unit 2 Mitigating System Performance Indicator (MSPI) for Emergency Alternating Current (AC) power systems at PINGP changed from green to white.
The NRC requested that Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM"), provide notification when PINGP is prepared to undergo the supplemental 95001 inspection. In a letter dated November 25, 2013, NSPM notified the NRC that PINGP was ready for the 95001 inspection.
NSPM requests that the NRC postpone the 95001 inspection. This request is being made due to questions regarding corrective action effectiveness. NSPM will advise the NRC in writing when PINGP is ready for the 95001 Supplemental Inspection.
If there are any questions or if any additional information is needed, please contact Ms.
Ingrid Nordby, P.E., at 651-267-1755.
Document Control Desk Page 2 Summary of Commitments This letter contains no new commitments and no revisions to existing commitments
~~F~
.<'e-o-. m.-,:s~
Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota cc:
Regional Administrator, Region Ill, USNRC Project Manager, Prairie Island Nuclear Generating Plant, USNRC Resident Inspector, Prairie Island Nuclear Generating Plant, USNRC