ML082100126
Person / Time
Site: Monticello, Prairie Island  Xcel Energy icon.png
Issue date: 07/25/2008
From: Weinkam E
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-HU-08-014, RIS-08-016
Download: ML082100126 (1)


Text

Nuclear Management Company 4 14 Nicollet Mall (MP-400)

Minneapolis, M N 55401 N

Cornmined to Nuclear Excellence July 25, 2008 L-HU-08-014 RIS 2008-16 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Prairie Island Nuclear Generating Plant Monticello Nuclear Generating Plant Units 1 and 2 Docket No. 50-263 Dockets 50-282 and 50-306 License No. DPR-22 License Nos. DPR-42 and DPR-60 Planned Initial License Operator Examination Data As requested by NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations", dated June 27, 2008, Nuclear Management Company, LLC (NMC) hereby submits the planned initial licensed operator examination data through 2012 for the Monticello Nuclear Generating Plant and Prairie lsland Nuclear Generating Plant. Enclosed is a corresponding NRC Form 536 for each site which provides the estimated number of applicants to be tested and the proposed primary and alternate dates for the examinations.

This letter makes no new commitments or changes to any existing commitments.

and Emergency Preparedness Nuclear Management Company, LLC Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Prairie lsland Nuclear Generating Plant, USNRC, NRR Resident Inspector, Prairie lsland Nuclear Generating Plant, USNRC Project Manager, Monticello Nuclear Generating Plant, USNRC, NRR Resident Inspector, Monticello Nuclear Generating Plant, USNRC

ENCLOSURE Planned Initial License Operator Examination Data for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 Page 1 of 3

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005)

Estimated burden per res onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments re arding burden OPERATOR LICENSING estimate to the Records and FOlNPrivacy Services Branch 8 - 5 F53). U S .

Nuclear Re ulatory Comm~sslon,Washington, DC 20555-0001, or by Internet EXAMINATION DATA and Regulatory e-mail Affairs, N E ~ov, to infoco~~ects@nrc. B - 0202, I

and to(31 the50-01 Desk 31),Officer, OfficeOffice of Manag,ement of Information and Budget, Washtngton, DC 20503. If a means used to tmpose an lnformation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the lnformatlon collection.

I FACILITY NRC REGION Prairie Island Nuclear Generating Plant Ill A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER -

CY 2009 cy- 2010 cy- 201 1 cy- 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS r

PROPOSED NUMBER -

CY 2009 CY2010 CY2011 CY2012 NUMBER OF REACTOR 0 7 3 0 OPERATORS NUMBER OF SENIOR REACTOR 5 3 0 0

OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0 1 3 0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSEDDATES PRIMARY DATE 04/12/2010 11/28/2011 ALTERNATE DATE 03/09/2010 12/05/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED - ~- -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 6 0 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005)

Estimated burden per res onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments re ardjng burden OPERATOR LICENSING estimate to the Records and FOlAlPrivacy Services Branch (T-5 F53), U.S.

Nuclear Re ulatory Commlsslon, Washlngton, DC 20555-0001, or by Internet EXAMINATION DATA and Regulatory e-mail to inYoco~~ect~@nrc.

Affairs, NE~B-10202, ov, and to(3150-OI~I),

the Desk Officer,OfficeOffice of Management of Information and Budget, Washlngton, DC 20503. If a means used to impose an information collection does not display a currently valid, OMB control number, the NRC may not conduct or sponsor, and a person IS not requlred to respond to, the information collection.

FACILITY NRC REGION Monticello Nuclear Generating Plant Ill A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 cy-2010 cy- 201 1 cy- 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER -

CY 2009 -

CY2010 -

CY2011 CY2012 NUMBER OF REACTOR 6 0 8 0 OPERATORS NUMBER OF SENIOR REACTOR 0 8 0 6

OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 1 0 2 0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LIMITED 0 PROPOSEDDATES PRIMARY DATE 02/23/2009 01/17/2011 ALTERNATE DATE 03/02/2009 0 1/24/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2011 PROPOSED . - ~ ------

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 18 0 0 0 18 0 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER