Text

REGULA Y INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION.NBR: 8711160241 DOC. DATE: 87/11/10 NOTARIZED:

NO DOCKET 0

~FACIL: 50-250 Turkey Point Planti Unit SI Florida Power and Light C

05000250 50-251 Turkey Point Planti Unit 4i Florida Power and Light C

05000251 AUTH. NAME AUTHOR AFFILIATION WOODY> C. O.

Florida Poujer h Light Co.

RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk>

SUBJECT:

Forwards select sos assessment progress summary for Oct 87.

DISTRIBUTION CODE:

AOOID COPIEB RECEIVED: LTR l

ENCL J SIZE:

TITLE:

OR Submittal:

General Distribution NOTES:

RECIPIENT ID CODE/NAME PD2-2 L*

McDONALD> D INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB NRR/DEST/RSB ILRB G FI E

01 EXTERNAL: EGM BRUSKEI S NRC PDR COPIES LTTR ENCL 1

0 1

1 0

1 1

1 1

1 1

1 1

1 1

RECIPIENT ID CODE/NAME PD2-2 PD NRR/DEBT/ADS NRR/DEST/MTB NRR/DOEA/TSB OGC/HDS2 RES/DE/EIB LPDR NSIC COPIES LTTR ENCL 5

5 1

1 1

1 1

0 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 21 ENCL 18

gl k

P.

OX 14000, JUNO BEACH, FL 33408-0420

+~Ny

+~e++

NOVEMBER 2 0

$987 L-87-460 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gen tlemen:

Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I Select S stem Assessment Pro ress Summar Attached please find the October l987 progress summary of the Select System Assessment.

lf you have cny questions regarding this information, please contact us.

Very truly yours, C. O. Woody Group Vice President Nuclear Energy COW/RG/gp Attachment cc:

Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 871ii6024i 87iiio PDR'BODE 05000250 PDR RG3/008/ I an FPL Group company

IIII I

~

II ~

I'

~ I I

Ih tl I

p f

~

~

SELECT SYSTEM REVIEW OCTOBER 1987 PROGRESS Safet Fn ineerin Grou SEG Review The SEG Unit 3 closeout report is on schedule for issuance by November 11,'987.

Confi ration Mana ement Revisions to the affected drawings resulting from implementation of Select System modifications during the Unit 3

Refueling Outage are scheduled for completion by January 11, 1988.

Other Si ificant Pro ress Closed various (approximately fifty) Nonconformance Reports (NCRs) on the Component Cooling Water (CCW) System (details available on request)

Completed review of emergency bus control logic per SOER 81-10.

Recommendations will be incorporated into Emergency Diesel Generator Upgrade Project Implemented revised criteria for CCW heat exchanger operability based on measure fouling rates Installed valves to facilitate cleaning of Intake Cooling Water (ICW) basket strainers Completed various ICW maintenance items and NCRs (details available on request)

Upgraded Main Steam Isolation Valves (MSIV) maintenance procedures to perform fail safe testing Overhauled MSIV actuators Developed Refueling Water Storage Tank (RWST) level curves to accommodate existing instrumentation Issued Battery load profiles as a controlled document.

Revised various Vital Power procedures (details available on request)

'I