L-87-346, Forwards Jul 1987 Summary Progress Rept of Select Sys Assessment

From kanterella
(Redirected from L-87-346)
Jump to navigation Jump to search
Forwards Jul 1987 Summary Progress Rept of Select Sys Assessment
ML17342A875
Person / Time
Site: Turkey Point  
Issue date: 08/21/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-87-346, NUDOCS 8708280107
Download: ML17342A875 (6)


Text

r"'

REGULATORY JFORMATION DISTRIBUTION S M (RIDS)

ACCESS IL)N NBR: 8708280107 DOC. DATE: 87/08/21 NOTARIZED:

NO FACIL: 50-250 Turkey Point Plant>

Unit 3> Florida Power and Light C

50-251 Turkey Point Plant>

Unit 4> Florida Poeer and Light C AUTH. NAME AUTHOR AFFILIATION WOODY> C. O.

Florida Power 5 Light Co.

RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Foreards Jul 1987 summary progress rept of select sos assessment.

DISTRIBUTION CODE:

A001D COPIES RECEIVED: LTR ENCL SIZE:

TITLE:

OR Submittal:

General Distribution DOCKET 0 05000250 05000251 NOTES:

REC IP IENT ID CODE/NAME PD2-2 LA McDONALD>D COPIES LTTR ENCL 1

0 1

1 RECIPIENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL 5

5 INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB NRR/DEST/RSB ILRB REG FILE, 01 EXTERNAL:

EGSG BRUSKE> S NRC PDR 1

0 1

1 1

1 1

1 1

1 1

NRR/DEST/*DS NRR/DEST/MTB NRR/DOEA/TSB OGC/HDS2 RES/DE/EIB LPDR NSIC 1

1 1

1 1

1 0

1 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 21 ENCL 18

0 v

8

P. O. BOX 000, JUNO BEACH, FL 33408-0420

+~jg<

iw 5U@53l 2 i 1987 L-87-346 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I Select S stem Assessment Pro ress Summar Attached please find the July l987 progress summary of the Select System Assessment.

Ifyou have any questions regarding this information, please contact us.

Very truly yours, O. Woody roup Vice President Nuclear Energy COW/RG/gp Attachment cc:

Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 8708280i07 87082i PDR ADOCK 05000250 R

PDR RG3/008/ I an FPL Group company

K H

SELECT SYSTENI REVIEW JULY l987 PROGRESS Reconstitution of Desi Basis The formal design basis validation packages for the Containment Spray and Residual Heat Removal Systems have been completed to support the scheduled design basis verification.

Finalization of validation packages for the other Select Systems continues to move through the review, comment and comment resolution cycles.

Walkdowns All walkdowns have been completed and identified operability/functionality concerns evaluated and dispositioned for the original list of Select Systems.

Scope and schedule development for correction of other deficiencies and as-building of appropriate documents has commenced.

Other Si nificant Pr ress Resolved discrepancies between Safety Injection instrument setpoint documents Repaired various Safety Injection valve limit swit'ch cover gaskets Evaluated adding isolation valves for accumulator check valves Corrected Safety Injection System elementary wiring diagram deficiency Rebuilt 4B High Head Safety Injection Pump Revised EOP for LOCA for switchover time to cold leg recirculation Completed evaluation under IO CFR Part 2I criteria for inverter operating problems Resolved discrepancy between test requirement document on Station Batteries Implemented IEEE 450 testing criteria for Batteries by PC/M Change Request Cleaned l25 VDC busses Resolved discrepancies between various Battery procedures RG3/008/2

~

~