Forwards June 1987 Progress Summary of Select Sys Assessment
ML17342A777
Person / Time
Site: Turkey Point  
Issue date: 07/21/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-87-305, NUDOCS 8707240103
Download: ML17342A777 (6)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDB)

ACCESSION NBR: 87D7240103 aIOC. DATE: 87/07/31 NOTARIZED:

ND FACIL: 50-250 Turkey Point Planti Unit 3i Florida Power and Light C

50-251 Turkey Point Planti Unit 4i Florida Poeer and Light C

AUTH. NAME AUTHOR AFFILIATION NOODYI C. O.

Florida Poujer 5 Light Co.

RECIP. NAME RECIPIENT AFFILlATION Document Control Branch (Document Control Desk)

SUBJECT:

Forujards June 1987 progress summary o0 select sos assessment.

DISTRIBUTION CODE:

AOOID COPIES RECEIVED: LTR f ENCLj SIZE:

TITLE:

OR Submittal:

General Distribution DOCKET 05000250 05000251 NOTES:

REC IP IENT ID CODE/NAME PD2-2 L*

McDONALDBD COP IEB LTTR ENCL 1

0 1

RECIPIENT ID CODE/NAME PD2-2 PD COPIEB LTTR ENCL 5

5 INTERNAL'RM/DAF/LFMH NRR/DEST/*DB NRR/DOE*/TSH OGC/HDB2 RES/DE/EIB EXTERNAL:

EG8cG HRUSKEI S NRC PDR 1

0 1

1 1

1 1

0 1

1 1

1 1

NRR/DEBT/*DE NRR/DEST/CEH NRR MAB/ILRB IL 01 LPDR NBIC 1

1 1

1 1

1 1

1 TOTAL NUMHER OF COPIES REQUIRED:

LTTR 20 ENCL

'l

P. O. B 4000, JUNO BEACH, FL3340B FLORIDA POWER & LIGHT COMPANY QULY 81 1987 L-87-305 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I Select S stem Assessment Pro ress Summar Attached please find the June l987 progress summary of the Select System Assessment.

lf you have any questions regarding this information, please contact us.

Very truly yours, C'. O.

dy Group ice President Nucl ear Energy COW/RG/gp Attachment cc:

Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 8707240i03 87072i

,i, PDR ADQCH, 05000250 R

PDR

'G I /008/I PEOPLE... SERVING PEOPLE

4

~ wa Pt t

14 n

t O

I II

\\I 0

0

SELECT SYSTEM REVIEW JUNE l987 PROGRESS Reconstitution of Desi n Basis Engineering review, comment and comment resolution of system verification attributes continues.

System verification attribute packages will constitute the formal design basis verification packages.

Wa Ikdowns All walkdowns are now completed except small bore piping and tubing walkdowns outside Unit 4 Containment.

These walkdowns, due to be completed by July 3I, I 987, are 80% complete.

Other Si nificant Pro ress Completed modifications to partially remove and cap Component Cooling Water lines to the Unit 3 Primary Shield Coolers Closed various Component Cooling Water NCRs (Non-Conformance Reports)

- detailed listing available on request Resolved various Component Cooling Water related discrepancies with procedures 3-OP-30 and 4-OP-30 Resolved various Component Cooling Water related discrepancies with drawing 56 I 0-T-E-45 I 2 Closed Containment Spray NCR on MOV-3-880A pipe support deficiency Completed inspection of below ground Intake Cooling Water piping with only minor discrepancies found Closed out documentation associated with installation of modified Intake Cooling Water check valves Enhanced Intake Cooling Water process flow indication Completed material study for replacement of Intake Cooling Water Piping