L-87-137, Forwards Feb 1987 Progress Summary of Select Sys Assessment

From kanterella
(Redirected from L-87-137)
Jump to navigation Jump to search
Forwards Feb 1987 Progress Summary of Select Sys Assessment
ML17347A369
Person / Time
Site: Turkey Point  
Issue date: 03/19/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-87-137, NUDOCS 8703250170
Download: ML17347A369 (6)


Text

ACCESSION NBR:

FACIL:50-250 50-25i AUTH. NAME MOODY';O.

RECIP. NANE REQULATORY ORl'1ATION DISTRIBUTION SYS 3

(R IDS) 8703250i70 DOC. DATE: 87/03/i9'OTARIZED:

NO DOCKET Turkey Point Planti Unit 3i Florida power and Light C 05000250 Turkeg Point Plant.

Unit 4i Florida Power and Light C

0500025i AUTHOR AFFILIATION Florida Power 5 Light Co.

RECIPIENT AFFILIATION Document Control Branch (Document Cbntrol e

SUBJECT:

Forwards Feb i987 Progress summary of select sos..assessment.

DIBTRIBUTION CODE:

AOOID COPIEB RECEIVED: LTR Q ENCL g BI'ZE:

TITLE: OR, Submittal:

General Distribution NOTES:

RECIPIENT ID CODE/NAME PMR-A EB PNR-A FOB PNR-A PD2 PD PNR-A PSB INTERNAL: ADN/LFNB

~E ILE oi EXTERNAL:

EQRcQ BRUSKE> S NRC PDR COPIES LTTR ENCL i

i i

5 5

i i

0 i

0 i

i i

i i

RECIP IENT ID CODE/NANE, PMR-A EICSB PWR-A PD2 LA NcDONALDi D PNR-A RSB NRR/DHFT/TSCB OQC/HDS2 LPDR NSIC COP IES LTTR ENCL 2

2 0

ii i

ii 0

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL i8

R'R' l

Ri L',

R II II R.Jh l',hR a lRRf

'IRR V

R

'R<",R',')

11 Ih p

Rill h'll RR

'R 11 gh 1

)!1P tl ),

)1 IQ ~

ll fhh 1 (

II jg 1, QI 1$

~ $

gII 'I

.Il 'IR',"<, LRI 1,(49R R

]R h 117

P. O. BOX, JUNO BEACH, FL 3340B-0420 quit'6g, MARCH 19 1987 L-87-I37 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I Select S stem Assessment Pro ress Summar Attached please find the February l987 progress summary of the Select System Assessment.

lfyou have any questions regarding this information, please contact us.

Very truly yours,

. O. Woody Group Vice President Nuclear Energy COW/RG/gp Attachment cc:

Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 8?03250170 870319 PDR ADOCK 05000250 R

PDR RG I /006/ I r/(

g~cy 0o I an FPL Group company

I i

~

ll A

III>>I tl

~ >>N Rt A

I>>

R*'t J>>

r RRN ~ ~

~

~

>> I' I

1>>i i

I II I I'I I

R ~

J

~

Ill I lt" lt

~

~ '

ll

>> f' N

SELECT SYSTEM REVIEW FEBRUARY 1987 PROGRESS Reconstitution of Desi n Basis Engineering review and comment promulgation on revised versions of the reconstituted design bases are essentially

'complete.

Resolution of comments is in progress.

Design verification procedures and criteria are being developed.

Walkdowns One hundred and sixty-one (161) small bore piping and tubing walkdowns are complete.

I One hundred and twenty-six (126) breaker list walkdowns are complete.

One hundred and ten (110)

P&ID walkdowns are complete.

Other Si nificant Pro ress Installed HIS cover plates for designated AFW components on the Control Board Completed addition of AFW area emergency lighting.

Developed AFW dynamic nitrogen consumption surveillance test procedure.

Repair inlet pipe to 4B Containment Spray Pump Seal heat exchanger.

Resolved issue of Boric Acid Storage Tank level alarms.

Repair "A" charging pump fluid cylinder.

Closed various CVCS NCRs.

Evaluated risk of inadvertent actuation of the Emergency Filter System in terms of fire protection.

Issued operating procedure for Instrument Air dryers.

Issued preventative maintenance procedure to periodically clean Instrument Air separators and receivers.

Reviewed Reg Guide 1.68 applicability.

Corrected miscellaneous tagging deficiencies on Instrument Air.

Closed various ICW NCRs.

MWDisk/DAC2/$f'019/C