L-86-338, Responds to Noncompliances Noted in Insp Repts 50-250/86-24 & 50-251/86-24.Corrective Actions:Personnel Counseled to Ensure Training Process Implemented as Designed & Clearance Tags Placed on 480-volt Tie Breakers

From kanterella
(Redirected from L-86-338)
Jump to navigation Jump to search
Responds to Noncompliances Noted in Insp Repts 50-250/86-24 & 50-251/86-24.Corrective Actions:Personnel Counseled to Ensure Training Process Implemented as Designed & Clearance Tags Placed on 480-volt Tie Breakers
ML17342A685
Person / Time
Site: Turkey Point  
Issue date: 08/18/1986
From: Woody C
FLORIDA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
L-86-338, NUDOCS 8609030385
Download: ML17342A685 (8)


Text

,~g8"

+y~)ll/g<

rill FLORIDAPOWER & LIGHTCOMPANY NG 13NSB L-86-338 Dr. 3. Nelson Grace Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Maietta Street, N. W., Suite 2900 Atlanta, Georgia 30323

Dear Dr. Grace:

Re:

Turkey Point Units 3 and 0 Docket Nos. 50-250, 50-251 Ins ection Re ort 86-20 and 86-20 Florida Power 2 Light Company has reviewed the subject inspection report, and a response is attached.

There is no proprietary information in the report.

Very truly yours,

. O. Woody roup Vice President Nuclear Energy COW/SAV:aa Attachment cc:

Harold F. Reis, Esquire agocyP30g85 S

0250 818 F"

t pop ADOCK 050 Op (,

8 PD L0:I W< ~/iii PEOPLE... SERVING PEOPLE

4I al

~~

~ w

~

0 J

ATTACHMENT Turkey Point Units 3 and 0 Docket No. 50-250, 50-251 IE Ins ection Re ort 250-86-20 R 251-86-20 FINDING:

10 CFR 50, Appendix B, Criterion XVI, as implemented by FPL Topical Quality Assurance Report (FPL TQAR) 1-76A (Rev. 8) and Topical Quality Requirement (TQR) 16.0 (Rev. 0),

requires that in the case of significant conditions adverse to quality, that measures shall assure that the cause of the condition is determined and corrective actions are taken to preclude repetition.

Contrary to the above, after the NRC resident inspection staff identified that prior to August 10, 1985, no operator training had been provided on the use of Gamma Metrics neutron flux monitor pursuant to licensee commitments, the licensee's corrective actions failed to preclude repetition, in that, replacement Hot License Class 10 operators receiving licenses after February 1986, were not provided training in the use of the Gamma Metrics neutron flux monitor.

RESPONSE

1) FPL concurs with the finding.
2) The Training Department failed to consider the need of the Group 10 license candidates for this training due to an oversight.
3) The Group 10 license candidates have been trained in the use of Gamma Metrics neutron flux monitors.
0) The Training Department has evaluated the process for dealing with training for plant modifications.

The results of this evaluation indicate that this is an isolated incident and not a result of deficiencies in the existing program.

The personnel involved have been counseled to ensure that in the future they implement the process as designed.

5) a)

Full compliance for Item 3 above was achieved by April 23, 1986.

b)

Full compliance for Item 0 above was achieved by August 1, 1986.

NOTICE OF DEVIATION:

A Confirmation of Action letter issued to FPL on April 2, 1986, confirmed that the total loads on emergency diesel generators would be reduced to no more than 2805 K)V and that procedures would be changed to ensure operation within this limitation.

Contrary to the above, the licensee failed to adequately revise procedures to assure operation of the emergency diesel generators within load limitations, in that:

t I

W y

I

Re: IE Ins ection Re ort 250-86-20 R 251-86-20 Page 2

Deviation a:

Operating procedure 0-OP-006 was not revised to ensure that the Confirmation of Action letter specified emergency diesel generator load limit of 2805 KlV was not exceeded.

On April 10, 1986, this procedure was utilized to crosstie the OB 080 volt load center to the OA 080 volt load center without a safety evaluation to ensure that the Confirmation of Action letter load limit would not be exceeded for emergency diesel generator A under accident conditions.

The use of 0-OP-006 placed the plant in a condition outside of the assumptions in a justification for continued operation contained in 3PE-L-86-59, Revision 1 for the operation of Unit 3.

RESPONSE

1) FPL concurs with the deviation in that the OB 080 volt load center was cross-tied to the OA 080 volt load center without a safety evaluation to ensure that EDG loading limits would not be exceeded.

However, the Operations Department had taken an additional conservative

measure, not required by the EDG loading evaluation, 3PE-L-86-59, Revision 1, of deenergizing the OD normal containment cooler (powered from the OB 080 volt load center) and taking it out of service on a clearance.

In addition, with Unit 0 in cold shutdown, certain engineered safety feature equipment (not required for Unit 3 operation) was also taken out of service to prevent operation.

Therefore, it was felt that the EDG loading limits would not be exceeded.

2) The reason for the deviation was that this procedure was not identified as requiring a change during the initial review of 3PE-L-86-59, Revision 1.

3) a)

A safety evaluation of the April 10, 1986 alignment of the OB loads and their affect on total EDG loading was performed by our Engineering Department.

The results of this evaluation indicated that the conservative measure taken by the Operations Department resulted in an actual reduction of design basis accident EDG loading by 03 KhV during the time the OB load center was cross-tied to the OA load center.

Therefore, the evaluation concluded that the loading on the EDGs would not have exceeded the limits specified in the EDG loading evalution, 3PE-L-86-59, Revision 1.

b) 3(0)-OP-006 has been revised to incorporate a caution. in the infrequent operations section of the procedure that states that unless both units are in a cold shutdown, the 080 volt load center cross-tie breakers shall be'acked out and tagged in accordance with AP 0103.0, In-Plant Equipment Clearance Orders.

These breakers may be closed only in accordance with Technical Specifications, a safety evaluation, or as directed by the Technical Support Center Staff when activated under the emergency plan.

0) After this incident, clearance tags were placed on the 080 volt tie breakers to preclude recurrence.

A letter was issued to plant supervisors, nuclear, emphasizing that no electrical system cross connects between trains can be made without first discussing the new alignment with the Engineering Department.

6

W I

I Pr Re:

IE Ins ection Re ort 250-86-20 R 251-86-20 Page 3

5) a)

Full compliance for Item 3.a above was achieved by April 10, 1986.

b)

Full compliance for Item 3.b above was achieved on 3uly 28, 1986.

c)

Full compliance for Item 0 above was achieved by April 17, 1986.

DEVIATIONS b R c:

b.

Emergency Operating Procedure 3-ECA-0.0, Loss of AllAC Power, did not ensure that an RHR pump would be secured and a battery charger restored within 30 minutes to prevent overloading an emergency diesel generator (EDG) with a loss of all AC power on Unit 3. Attachment E of ECA 0.0 also did not contain direction to ensure that in the one EDG available case, that the battery charger is restored utilizing the normal bypass switch. Utilizingthe "reset switch", which is the normal method of restoration, could potentially overload the EDG.

c. Attachment E of 3-EOP-E-O, Step 2, directed the operator to restart a computer room chiller within one hour following a reactor trip and loss of offsite power.

Starting a overload an EDG. Specific precautions to ensure the computer room chillers were not restarted until after the containment spray pumps are secured were not contained in Attachment E of 3-OP-E-O.

RESPONSE

1) FPL concurs with the deviation.
2) The reason for the deviation was that the correct version of the procedures had been approved by the Plant Nuclear Safety Committee, however, an earlier version of the procedures had inadvertently been given to Document Control for distribution.

The earlier version had outdated information on EDG loading capability.

3) The corrected procedures, consistent with the EDG justification for continued operation, were reissued to Document Control for distribution.
0) The word processing procedures have been revised to provide additional assurance that only the final approved versions of procedures are sent to Document Control for distribution.

5) a)

Full compliance for Item 3 above was achieved by April 6, 1986.

b)

Full compliance for Item 0 above was achieved by August 1, 1986.

II v

C