L-86-185, Requests Extension of Submittal of Reactor Vessel Matl V Surveillance Specimen Capsule Fracture Toughness Test Results Until 860901.Delay Due to Death of Swri Project Manager
| ML17346B198 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 04/30/1986 |
| From: | Woody C FLORIDA POWER & LIGHT CO. |
| To: | Thompson H Office of Nuclear Reactor Regulation |
| References | |
| L-86-185, NUDOCS 8605060299 | |
| Download: ML17346B198 (4) | |
Text
J~
REQULA~ INFORMATION'ISTRIBUTIO
'YSTEN (R IDS)
ACCESSION NBR: 8605060299'OC.
DATE: 86/04/30 NOTARIZED:
NO DOCKET 0 FACIL:50-250 Tuv keg 'Point Plant.
Unit 3.
Flov ida Potter and Light C
05000250
,50<251 Turkey Point Planti Unit 4i Flov ida Power and Light C 05000251 AUTH. NANE AUTHOR AFFILIATION MOODYB C. 0-Flov ida Pomer Sc Light Co.
RECIP. NANE RECIPIENT AFFILIATION THONPSOl4 H L.
Divlsion of Pv essuv i 2 ed Watev'eactor Licensing A
( post 8
SUBJECT:
Requests extension of submittal of reactov vessel matl "V" surveillance specimen capsule fvactuve toughness test v esults until 860901. Delay due to death of SWRI prospect managev',
DISTRIBUTION CODE:
AOOID COPIES RECEIVED: LTR g ENCL + SIZE:
TITLE:
OR Submittal:
Genev al Distribution NOTES:
RECIPIENT ID CODE/NAME PWR-A ADTS PWR-A EICSB PWR-A PD2 PD 01 PWR-A PSB I
INTERNAL: ADN/LFNB R~
/TSCB REQ FILE 04 COPIES LTTR ENCL 1
2 5
1 RECIPIENT ID CODE/NAME PWR-A EB PWR-A FOB NcDONALDz D PWR-A RSB ELD/HDS4 NRR/GRAS RQN2 COP IES LTTR ENCL EXTERNAL. 24X LPDR NSIC 03 05 EQhQ BRUSKEB 8 NRC PDR 02 TOTAL NU>BER OF COPIES REQUIRED:
LTTR 24 ENCL
,tjl',tti 4787Q NCXThktPtJit<<Z
't fA 44~tt~~".
~P'".)tj(
'('3')'Ct
'ib
-Q tV 7 "Q t )IN
&hatt
- f. t a tr't 'f'i."u's Gt't tt't tt I
t tlat
~
e'WQ 3 VftZt t )t:
(j! "Q(3>> dB 31~<Q jQQ WP~O~AOi.OuP I'c,I 3,S 8xAU
.8 a.'IR ftti'<,'t pad'ru t
i'rn <<."-N,>>
"; LeU fttttI~l io.tt l ttu'foul 3 J 't,5 L.JS l lrc Ht;td flJ;)
6 '>. t. L3
~ "i
< }:ted )
t:i4 h'ti3 I '4 tlat',",I 3Y '1A I'NlK'JI")-',8 up >".'t
$ 9 t".Qs ~,fv;.9 RQN Nflti~~l,.
0~'.". 0;. t t."t8 fi;G>Qc",
~f'!AM.1 QUA 0,,} iYt'44'
'7t
~~N.e 7, ~ HR
.J,l' N(Jd ltd t.'H
>'-'J'-'~iiil t "t--'".'3'Q'f'3i "i 3 t iO 1Ci+<<> Ltttti'<<d
'Pu fthm w "tf">0 V 9 Qd'~~ tule'.>8
" ""4t/t)Quod' t'u", 'p4'i% <<>Iu2q6~
tr~'>ttlx 3<t <~<
'L 1ttGII t'""~'tvt'
~ago rq EHt'<
~ ')u t',.-tc ~b ~i 9", b pt IttG IOPO~t>
LxPtru S)use r
,.'r'3 tt F~trGtp.
0
. Box 14000, JUNO BEACH, FL 3340B I
6 FLORIDAPOWER & LIGHTCOMPANY
~ 3 P188B L-86-185 Office of Nuclear Reactor Regulation Attention:
Mr. Hugh L. Thompson, Jr., Director Division of PWR Licensing - A U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Mr. Thompson:
Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Reactor Vessel Material Surveillance Pro ram 10 CFR 50, Appendix H,
Section Ill requires that reactor vessel material surveillance specimen capsule fracture toughness test results be included in a summary technical report and submitted to the Director, Office of Nuclear Regulation, within one year of capsule withdrawal, unless an extension is granted by the Director.
The "V" surveillance capsule from Turkey Point Unit 3 was removed from the reactor vessel in late April 1985.
Capsule analysis and testing was contracted to Southwest Research lnc. (SWRI) of San Antonio, Texas.
The project has been delayed because of the death of the SWRI Project Manager.
Based on discussion with SWRI, Florida Power & Light Company will receive the SWRI report by the end of June.
In order to provide sufficient time for review and resolution of comments, FPL requests an extension of the submittal date to September I, 1986.
lf you have any questions, please call us.
Very truly yours, C. O. Woody Ad Group Vice President Nuclear Energy COW/TCG/gp cc: