ML17347A254
| ML17347A254 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 01/14/1987 |
| From: | Mcdonald D Office of Nuclear Reactor Regulation |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17347A255 | List: |
| References | |
| GL-83-28, TAC-52972, TAC-52973, TAC-53809, TAC-53810, NUDOCS 8701300131 | |
| Download: ML17347A254 (3) | |
Text
January 14, 1987 Docket Nos.
50-250 and 50-251 Mr. C. 0. Woody, Group Vice President Nuclear Energy Department Florida Power and Light Company P. 0. Box 14000 Juno Beach, Florida 33408 DISTRI BUTION NRC PDR Local PDR PD ¹2 Reading TNovak OGC-Bethesda EJordan BGrimes J Parti ow NThompson, DHFT LEngle DMiller ACRS (10)
Gray File
Dear Mr. Woody:
SUBJECT:
GENERIC LETTER (GL) 83-28, ITEMS 3.1.1, 3.1.2, 3.2.1, and 3.2.2 RELATING TO TURKEY POINT UNITS 3 AND 4
Reference:
TAC Numbers
- 52972, 52973, 53809 and 53810 By letter dated November 8, 1983, you provided your responses to GL 83-28 which included Item 3.1.1, "Review of Test and Maintenance Procedures and Technical Specifications (Reactor Trip System Components)";
Item 3.1.2, "Post-Maintenance Testing (Reactor Trip System Components)";
and Items 3.2.1 and 3.2.2, "Post-Maintenance Testing (All Other Safety-Related Components}."
We reviewed your submittal and requested additional information relating to Items 3. 1.2, 3.2.1 and 3.2.2 by letter dated April 30, 1986.
You provided your response to our request by letters dated June 19 and July 31, 1986.
The staff has reviewed your initial response and the supplemental response in relation to the above referenced items and conclude that your responses are acceptable.
The details of our evaluation and the basis for our conclusion are included in the enclosed Safety Evaluation.
GL 83-28, Items 3.1. 1, 3. 1.2, 3.2. 1 and 3.2.2 are complete for the Turkey Point Plant, Units 3 and 4.
This completes our effort related to the above referenced TAC numbers.
Sincerely,
/s/
Enclosure:
As stated cc:
See next page
¹2 McDonald:aj I/ig/87 Daniel G. McDonald, Project Manager PWR Project Directorate ¹2 Division of PWR Licensing-A bcc w/encl:
bcc w/o encl:
T. Conlon, RII M. Allen, RII A. Herdt, RII
~
~
~
N. Merriweather, RII K. Landis, RII D:PAD LRubenstein I/tQ/87 8701300131 870114
'j PDR
- DOCK 05000250
)
P PDR
A
~ r
~
r it
~ I-I I
I 1hh
'I I I I
~
I I ll h'
~
Ii ht I'1 Ihf W
A A
l)
I ~
I A
Mr. C. 0.
Woody Florida Power and Light Company Turkev Point Plant CC'arold F. Reis, Esquire Newman and Holtzinger, P.C.
1615 L Street, N.W.
?0036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Norman A. Coll, Esquire
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Fl or ida 33131-2398 Mr. C.
M. Wethy, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Rox 029100 Miami, Florida 33102 Mr. M..R. Stierheim County Manaaer of Metropolitan Dade County Miami, Florida 33130 Resident Inspector U.S. Nuclear Regulatory Commission Turkey Point Nuclear Generatina Station Post Office Rox 57-1185 Miami, Florida 33257-1185 Mr. Allan Schubert, Manager Office of Radiation Cont~ol Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Ta 1 1 aha ssee, Flori da 32301 Intergovernmental Coor dina tion and Review Office o< Planning A Budaet Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of Fnvironmental Reaulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Reaional Administrator, Region II U.S. Nuclear Reaulatorv Commission Suite 2900 101 Marietta Street Atlanta, Georgia 30323 Martin H. Hodder, Esauire 1131 NE, 86th Street Miami, Florida 33138 Joette Lorion 7269 SW, 54 Avenue Miami, Florida 33143 Mr. Chris J. Baker, Plant Manager Turkey Point Nuclear Plant Florida
~ower and Light Company P.O.
Box 0?9100 Miami, Florida 3310?
Attorney General Department of Leaal Affairs The Capitol Tallahassee, Florida 32304