L-85-157, Advises That Rev to Westinghouse ECCS Evaluation Model Procedure by Which Core Flooding Rate Info Generated by Wreflood Code Introduced Into Bart Heat Transfer Coefficient Resulted in Higher Peak Clad Temp Calculation

From kanterella
(Redirected from L-85-157)
Jump to navigation Jump to search
Advises That Rev to Westinghouse ECCS Evaluation Model Procedure by Which Core Flooding Rate Info Generated by Wreflood Code Introduced Into Bart Heat Transfer Coefficient Resulted in Higher Peak Clad Temp Calculation
ML17346A959
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/16/1985
From: Williams J
FLORIDA POWER & LIGHT CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
L-85-157, NUDOCS 8504190305
Download: ML17346A959 (8)


Text

DOCKET 05000250 05000251 DISTRIBUTION CODE:

A001D COPIES RECEIYED:LTR ENCL TITLE:

OR Submittal:

General Distribution REGULATORY INFORh1ATION DISTRIBUTION SYSTEM (RIDS)

ABC'f88ION NBR: 8500190305 OC ~ DATE: 85/00/16 NOTARIZO:

NO FACIL:50-250 Turkey Point Plant~'nit 3~ Florida Power and Light C

50-251 Turkey Point Planti Unit 4< Florida Power and Light C

AUTH' NAhlE AUTHOR AFFILIATION HILLIAMSiJ ~ N; Florida Power 8 Light Co.

REC IP ~ NAME RECIPIENT AFF ILIATION VARGAgS ~ AD Operating Reactors Branch 1

n

SUBJECT:

Advises that rev to Nestinghouse ECCS evaluation model procedure by which core flooding rate info generated by NREFLOOD code introduced into BART heat transfer coefficient resulted in higher peak clad temp calculation.

NOTES; OL: 07/19/72 OL:04/14/73 05000250 05000251 RECIPIENT ID CODE/NAblE NRR ORB1 BC 01 INTERNAL; ACRS 09 ELD/HOSE NRR/DL DIR NRR/DL/TSRG NRR/DS I/RAB RGN2 COPIES LTTR ENCL RECIPIENT ID CODE/NAME ADM/LFMB NRR/DE/MTEB NRR/DL/ORAB

/METB EG FIL OA COPIES LTTR ENCL EXTERNAL: EGHG BRUSKEgS NRC PDR 02 LPDR NSIC 03 05 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 27 ENCL

II@

C

FLORIDAPOWER 5 LIGHTCOMPANY APR I 6 IIISS L-85-157 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. S. A. Varga, Chief Operating Reactor's Branch III Division of Operating Reactors

Dear Mr. Varga:

Re:

Turkey, Point Units 3 and 0 Docket Nos. 50-250 and 50-251 BART-IIVREFLOODIn ut Revision As you are

aware, IIVestinghouse has revised the ECCS evaluation model procedure by which the core flooding rate information generated by the WREFLOOD code is introduced into the BART heat transfer coefficient calculation.

Reanalysis of the Turkey Point Units 3 and 0 ECCS performance utilizing the revised procedure resulted in a higher peak clad temperature (PCT) than the previously calculated PCT of 1972DF.

As reported to the NRC by Westinghouse in a March 22, 1985 letter to Mr. D.

G. Eisenhut, and as discussed at the prehearing conference of March 26, 1985, the new calculated PCT for Turkey Point Units 3 and 0 is 2051 F. This value is well below the 10 CFR 50.06 limit of 2200o.

Analyses using the FLECHT correlation in lieu of the BART code had confirmed that the acceptance criteria in 10 CFR 5046 had been met (PCT of 2130OF vs. the 2200 limit).

If you have any questions, please call us.

Very truly yours

~

~

~

3. W. Wi1', 3r.

Group V e President Nuclear Energy 3 WW/TCG/js cc:

Dr. 3. Nelson'race Harold F. Reis, Esquire PNS-LI-85-156p 85041'70305 850416 I

PDR ADOCK 05000025 p

PDR PEOPLE... SERVING PEOPLE

J

'e T

,tent

~

~

)

k

April 8, 1985 w

DOCKET NO(S). 50-280/251 Hr. J. M. Millisans, Jr., Yice President Nuclear Energy Department Florida Power and Light Post Office Box 14000 Juno Beach, Florida 33408

SUBJECT:

FLORIDA POMER AND LIGHT COMPANY TURKEY POINT PLANT,UNIT NOS. 3 AND 4 DISTR+ION;

.Docket.l-ile. w/o encl:.~

ORB¹1 Rdg w/o.'encl.

CParrish w/encl/

DMcDonald w/encl.

Sholly File The following documents concerning our review of the subject facility are transmitted for. your information.

D Notice of Receipt of Application, dated D Draft/Final Environmental Statment, dated D Notice of Availabilityof Draft/Final Environmental Statement, dated D Safety Evaluation Report, or Supplement No

, dated D Notice of Hearing on Application for Construction Permit, dated

D Notice of Consideration of Issuance of Facility Operating License, dated I

H D Monthly Notice; Applications and Amendments to Operating Licenses Involving no Significant Hazards Considerations, dated D Application and Safety Analysis Report, Volume D Amendment No, to Application/SAR dated D Construction Permit No. CPPR-

, Amendment No.

dated D Facility Operating License No

, Amendment No.

, dated D Order Extending Construction Completion Date, dated IX3 Other (Specify) m s

S rveillance Re. For

Enclosures:

'As stated

.Di>>cion o~~Ldc~ensina, ORB¹T Office of Nuclear Reactor'Regulation CC:

O¹eFICK+

SURNAME+

DATE+

ORB¹1:DL CParri sh; 4/Q /85

~

~

~

~

~

~ ~ ~

~

~ ~ \\

~ ~

NRC FORM 318 t1/84) NRCM 0240

0 II 1

1 h

C

April 2, 1985 DOCKET NO(S) 58-858/251 Nr. J. M. Nillimtls, Jr., Vice President Nuclear Energy Department F1orida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408

SUBJECT:

FLORIDA PO>lER AND LIGHT COMPANY TURKEY POINT PLANT, UNITS 3/4 DISTRIBUTION

/Docket-.,g j.le-,w/o-e 1.

ORB%1 Rdg w o enc CParrish w/o encl.

DMcDonald /w/encl.

The following documents concerning our review of the subject facility are transmitted for your information.

D Notice of Receipt of Application, dated D Draft/Final Environmental Statment, dated D Notice of Availabilityof Draft/Final Environmental Statement, dated D Safety Evaluation Report, or Supplement No

, dated D Notice of Hearing on Application for Construction Permit, dat'ed D Notice of Consideration of Issuance of Facility Operating License, dated D Monthly Notice; Applications and Amendments to Operating Licenses Involving no Significant Hazards Considerations, dated D Application and Safety Analysts Report, Volume D Amendment No.

to Application/SA R dated D Construction Permit No. CPPR-D Facility Operating License No.

, Amendment No.

, Amendment No.

dated

, dated D Order Extending Construction Completion Date, dated Kl Other (SpecifyJ Monthly Notice covering period March 27, 1985.

Expiration date for hearing requests and comments April 26, 1985.

Division of Licensing, ORB81 Office of Nuclear Reactor Regulation

Enclosures:

As stated cc:

w(encTosures Oar iCe>

SURNAMe+

ORB81:DL CParrisfi; s

4'/85 NRC FORM 318 (1/84) NRCM 0240

0 f

\\