L-85-132, Responds to Generic Ltr 84-24 Re Environ Qualification Documentation Reverification.Qualification Documentation Available for All Equipment Identified in 10CFR50.49 Lists. Sser 4 (NUREG-0843) Demonstrated Compliance w/10CFR50.49
| ML17215A805 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 04/02/1985 |
| From: | Williams J FLORIDA POWER & LIGHT CO. |
| To: | Thompson H Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0843, RTR-NUREG-843, RTR-REGGD-01.097, RTR-REGGD-1.097 GL-84-24, IEB-82-04, IEB-82-4, L-85-132, NUDOCS 8504090191 | |
| Download: ML17215A805 (6) | |
Text
REGULATORY FORMATION DISTRIBUTION SY M (RIDS)
ACCESSION NBR! 85040'90 191 DOC ~ DATE 85/04/02 NOTARIZED YES FACIL:50-335 St ~ Lucie Planti Unjt ii Florida Power 8 Light Co ~
50-389 St. Lucie Planti Unit 2< Florida Power 8 Light'o.
AUTH ~ NAME AUTHOR AFFILIATION WILLIAMS/J.W ~
Florida Power 8 Light Co, RECIP ~ NAME.
RECIPIENT AFFILIATION THOMPSONFH.L.
Division of Licensing
SUBJECT:
Responds to Generic Ltr 84-24 re environ qualification documentation reverification, Qualification documentation available for all equipment identified in 10CFR50.49 lists, SSER 4
(NUREG 0843) demonstrated compliance w/10CFR50.49R I
DISTRIBUTION CODE:
A048D COPIES RECEIVED:LTR g ENCL SIZE; TITLE: OR/Licensing Submittal!
Equipment Qualfication NOTES:
OL$ 02/01/76 OL;04/06/83 DOCKET ¹ 05000335 05000389 05000335 05000389 RECIPIENT ID CODE/NAME NRR ORB3 BC SELLSpD 01 INTERNAL: ACRS 15 ELD/HDS2 12 GC'3 NRR/DE/EQB 07 NRR/DSI/AEB RGN2 COPIES LTTR ENCL RECIPIENT COPIES ID CODE/NAME LTTR ENCL NRR ORB3 BC 12 1
ADM/LFMB ELD SHIELDSF W NRR KARSCHFR N
IR'4 REG FILE 04 EXTERNAL! LPDR NSIC 03 05 NRC PDR 02 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 25 ENCL f2
11
.~
C 1
~
h I
I1 i g lf I
s 1 I gl f,
l, I
[
4
%gg I
f r
s H
N f
1
'a H
'W l4 I
l, 6
FLORIDAPOWER & LIGHTCOMPANY April 2, 19S5 L-85-132 Office of Nuclear Reactor Regulation Attention:
Mr. Hugh L. Thompson, 3r.
Director, Division of Licensing U. S. Nuclear Regulatory Commission V/ashington, D. C.
20555
Dear Mr. Thompson:
Re:
St. Lucie Unit Nos.
1 and 2 Docket Nos. 50-335 and 50-389 Generic Letter 80-20 In response to Generic Letter 80-20, Florida Power R Light Company completed a reverification of the environmental qualification documentation required for 10 CFR 50.09 compliance.
As a
result of this reverification, qualification documentation is available for all equipment identified on the 10 CFR 50.09 lists for St. Lucie Units 1 and 2.
For St. Lucie Unit 1, the methodology used for identifying electrical equipment within the scope of 10 CFR 50.09, was presented during a meeting with the NRC on May 8, 1980, submitted to the NRC in a letter dated 3uly 12, 1980 (L-80-162), and approved by the NRC as detailed in an NRC letter dated November 15, 1980.
In that 3uly 12, 1980, letter, 3COs for five solenoid valves, five accelerometers, four pressure transmitters, ten temperature detectors, and four radiation monitors were provided.
All of this equipment has been qualified and there are no outstanding 3COs.
For St. Lucie Unit 2, the 10 CFR 5089 list was submitted to NRC on May 25, 1983 (L-83-329). NRC, in Supplement 0 to the Safety Evaluation Report (NUREG 0803),
concluded that compliance with 10 CFR 50.09 had been demonstrated.
Also, FPL letter L-80-333, dated November 20, 1980, which provided a status of NPF-16 license conditions, stated that all equipment required to be qualified by 10 CFR 50.09 had been qualified.
Regarding environmental qualification of, the instruments required by Regulatory Guide 1.97, FPL submitted Reg. Guide 1.97 Evaluation Reports on November 30, 1983 (L-83-573) for St. Lucie Unit 2, and December 30, 1983 (L-83-605) for St.
Lucie Unit 1.
These reports are currently under NRC review, and any additional instruments required as a result of NRC's review willbe included under the 10 CFR 50.09 program.
8504090iqi 850402 PDR ADOCK 05000335 P
PDR PEOPLE... SERVING PEOPLE
Office of Nuclear Reactor Regulation Attention: Mr. Hugh L. Thompson, 3r.
Page 2
FPL reviewed IE Bulletin 82-00, and responded to NRC in FPL letter L-83-102, dated February 28, 1983, for St. Lucie Unit 2 and L-83-103, dated February 28, 1983, for St.
Lucie Unit 1.
Regarding the Information Notices identified in your letter, FPL is continuing to review these for applicability.
Very truly your.",
J. W. Williams, 3r.
Group Vice President Nuclear Energy 3 WW/RR3/R3S/js cc:
Harold F. Reis, Esquire PNS-LI-85-132ch
STATE OF FLORIDA
)
)
COUNTY OF DADE
)
J. W. Williams, 3r., being first duly sworn, deposes and says:
That h~ is a Groi p Vic~ President of Florida pnwer
~~ I.i<hi ~pm'..r hei eln; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said licensee.
C 1
- 3. W. Williams, 3r.
Subscribed and sworn to before me this day of l9 /W
- H
'NQTP,R~'-PVf<,'..., in and for the County
'o~ Dade,. State bf Florida h
C My Commission expires:
Er lFP7
h 1,
l
'I
, 0
'P p
~l g1
'll~I)~i'l~
1<
I ih I
l)