L-82-465, Forwards Revision to Loose Parts Monitoring Sys Training Program Previously Submitted in
| ML17213A602 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 10/27/1982 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| L-82-465, NUDOCS 8211010242 | |
| Download: ML17213A602 (6) | |
Text
WlM 5y DOCKET 05000389 NOTES:
I REGULATORY ORMATION DISTRIBUTION SY~M (RIDS)
ACCESSION NBR>>82110102<I2 D
C ~ DATE: 82/10/27 NOTARIZED:
NO FACIL:,50 389 St, Lucie Planti Unit 2i Flor ida Power 8 Light Co, AUTH,NAME AUTHOR AFFILIATION UHRIGiR>> E ~
Florida 'Power 8 Light Co, R EiC IP ~ NAME RECIPIENT AFFILIATION EISENHUTiD>>G, Division of Licensing
SUBJECT:
Forwards revision to loose parts monitoring sys training program previously submitted in 820930 ltr.
DISTRIBUTION CODE!
B001'S COPIES RECEIVED!LTR, / ENCI.
/
SIZE:
TITLE: Licensing Submittal:
PSAR/FSAR Amdts 8, Related Correspondence RECIPIENT ID CODE/NAME A/D LICENSNG LIC BR 03 LA INTERNAL': ELO/HOS2 IE/OEP EPDS 35 NRR/DE/AEAB NRR/DE/EQB 13 NRR/OE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 2g NRR/DHFS/HFEBQO NRR/DHFS/OLB 3Q NRR/DS I/AEB 26 NRR/DSI/CP8 10 NRR/DSI/ETSB 12 NRR/DSI/PS B
19 04 RM/DDAMI/MIB EXTERNAL: ACRS 41 DMB/DSS (AMDTS)
LPDR 03 NSIC 05 COPIES LTTR ENCL 1
0 1
0 1
0 1
1 0
3 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1.
1 1
1 1
1 1
1 0
6 6
1
'1 1
1 1
1
, RECIPIENT
-ID CODE/NAME LIC BR 03 BC NERSESiV>>
01 IE FILE IE/DEP/EPI.B 36 NRR/OE/CEB 11 NRR/DE/GB 28 NRR/OE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/OHFS/LQB 32 NRR/OHFS/PTRB20 NRR/DSI/ASB 27 NRR/DSI/CSB 09 NRR/DSI/ICS8 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 RGN2 BNL(AMDTS ONLY)
FEMA REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1
0 1
1 1
1 3
3 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 2
2 TOTAL NUMBER OF COPIES REQUIRED:
I.TTR 55 ENCL Q9
(c,'t3
>)
") v~
% I i.>'i T
.~3 0<<>nr a
~ l 4'<; 9 '" "
s I c'i ~ i ~ )
n
<<I )pi
, 9. H i e) 1 H <<'
J 9 )$, g ~ 41 I ') g 4 il
. ().t) g 7Jt<~tlc,'I 3 I "v ffl rh'0 4 g ~ A'1r 903 r 41cl"
~') 'I<
'i
'>mr"0 1 c4)
<9 rc'r V'>'4
,1 p 1
rye <~048 mr
) '>) 4 r "n>><! y 1c t>~>rv'~'4't, >,'lr;< lrt
- 7 9 g[,W,>en
FLORIDAPOWER & LIGHT.COMPANY October 27, 1982 L-82-465 Office of Nuclear Reactor Regul ati ons Attention:
Nr. Darrell G. Eisenhut, Director Division of Licensing U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Nr. Eisenhut:
Re:
St. Lucie Unit No.
2 Docket No. 50-389 Loose Parts Monitorin S stem Trainin Pro ram Attached please find a revision to the loose parts monitoring system training program previously submitted in our letter L-82-4l8 dated September 30, 1982.
If you have any questions regarding this submittal, please contact us accordingly.
Very
- yours, Robert E. Uhrig Vice President Advanced Systems and Technology REU/RJS/JES/jea 1
Attachment cc:
J.
P. O'Rei lly, Region II Harold F. Reis, Esquire or 821iOi0242 82i027
,PDR
- DOCK 05000389 A
PDR PEOPLE... SERVING PEOPLE
ATTACHMENT Loose Parts Monitorin S stem Trainin Pro ram As a means to insure the proper startup, operation and maintenance of the loose parts monitoring system at St. Lucie 2, Florida Power and Light pro-vides a broad training to our startup personnel, plant operators and I &
C maintenance crews.
Each group is trained in the specific operation of the system with emphasis on the aspects that they come in contact with'rou-tinely.
This loose parts monitoring system is functionally identical to the system that is installed in St. Lucie Unit 1.
This system has been in,operation since 1975 and has been utilized to monitor the indications of several potential loose parts in the St. Lucie Unit 1 reactor coolant system.
Since operating and maintenance personnel on St. Lucie Unit 1 are the same people who will be responsible for St. Lucie Unit 2, the operation of the St. Lucie Unit 2 loose parts monitor will be handled'y people who have had extensive experience with this equipment.
Plant startup personnel perform the system installation checks and initial alignment.
FPL startup department assigns the responsibility for loose parts monitoring system startup to a single individual who is very experi-enced in the alignment and operation of electronic systems similar to the loose parts monitor.
This assures that a knowledgeable and competent in-dividual will supervise the initial startup phase of the system.
In ad-dition to an indepth knowledge of the type of equipment, the vendor's technical manual is closely reviewed to assure proper initial alignment.
Plant I & C maintenance personnel who periodically check the equipment do so under the direction of a single highly qualified field supervisor who has overall responsibility for the operation of this equipment.
The field supervisor that has been responsible for the loose parts monitor-ing system on St. Lucie Unit 1 is the same individual who will be in charge on St. Lucie Unit 2.
This provides for a smooth transfer of knowledge of the
'design, operat'ion and maintenance of the St. Lucie Unit 2 loose parts mon-itoring system and insures that St. Lucie Unit 2 system will be maintained at the same level of proficiency as the existing system at Unit 1.
This individual is knowledgeable and very familiar with RG 1.133 and its recom-,
mendations.
Under this program, this one individual will be cognizant of what work is being performed and the overall status of this equipment.
The respon-sible field supervisor is required to study the vendor manuals to thoroughly familiarize himself. with the performance and operation of the equipment.
This review is supplemented with an overview by the I & C department head to complete the on-the-gob training.
The I & C department retains the services of the NSSS vendor (Combustion Engineering) to assist in trouble-shooting when the loose parts monitoring system indicates the possible presence
. of a loose part.
The onsite personnel request assistance from
-CE when the loose parts monitoring system exhibits a variation in detector
ATTACHMENT Pa e
2 output that may be indicative of a loose item moving about within the reactor coolant system.
The offsite personnel are equipped with the necessary sound monitoring instrumentation to pinpoint and identify the potential loose part and thereby provide the additional expertise necessary to effectively operate the system.
Finally. the plant operations personnel are provided with instruction in the operation of the loose parts monitoring system during their formal on-shift training watches.
This instruction familiarizes the control room licensed operators with the fundamentals of operation of the equip-ment.
With this instruction, the operators are prepared to respond to system alarms in a manner consistent with safe operation.
Plant operating procedures govern the actions of the controlroom operators when an alarm occurs on the loose parts monitor.
Plant off-normal procedure f/0030131 requires the controlroom operator to acknowledge any alarm on the loose parts monitor and'then notify the Instrumentation and Control depart-ment of the alarm.
The I &
C department, when notified by operations of a loose parts monitor alarm, investigates whether the alarm is spurious or valid. If the alarm is valid, as certified by vendor manual instructions, the I & C department will notify the NSSS vendor and request assistance to diagnose the problem.
The I & C department action to resolve identified problems with the loose parts monitor is governed by site procedure f/0010432 which requires that the I & C department correct the identified discrepancy including use of outside assistance when necessary.
This,comprehensive program of supervised on-the-job training and vendor manual instruction provides assurance that the loose parts monitoring system will be tested, aligned and operated properly.
The assistance of specialized offsite personnel will provide St. Lucie Unit 2 with the technical capability to identify and locate potential problems involving loose parts in the reactor coolant system.