L-82-234, Interim Deficiency Rept Re Fanbelt Problem During Initial Startup of Diesel Generator.Final Rept Will Be Submitted by 820820,pending Flight Dynamics Investigation

From kanterella
(Redirected from L-82-234)
Jump to navigation Jump to search
Interim Deficiency Rept Re Fanbelt Problem During Initial Startup of Diesel Generator.Final Rept Will Be Submitted by 820820,pending Flight Dynamics Investigation
ML20054K005
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/03/1982
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, L-82-234, NUDOCS 8206300291
Download: ML20054K005 (1)


Text

P.O. ROX 523100 MI A M t. F L 33152 9

'[ '

A

.; ')

FLORIDA POWER & LIGHT COMPANY

~~ J!It)?? P 2, y ;}

June 3, 1982 L-82-234 w

Mr. James P. O'Reilly Regional Administrator, Region II U. S. Nuclear Regu.latory Commission 101 Marietta Street. Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Re:

ST. LUClE UNIT 2 DOCKET No. 50-389 FAN BELT PROBLEM DURING INITIAL

_STARTUP OF DIESEL GENERATOR Ref: Florida Power and Light letter L-82-103, dated March 17, 1982 from Uhrig to O'Reilly On February 10, 1982, Florida Power and Light identified, via telecon, a potential 10 CFR 50.55(e) condition existing at the site involving the diesel generators (2A and 2B) fan belts. During initial startup and testing excessive vibration of the diesel generators (2A and 2B) fan belts was observed at speeds in excess of 700 rpm.

In the above referenced letter, Florida Power and Light indicated that the diesel generator vendor, Power Systems, had been contacted and is working very closely with Florida Power and Light Company to resolve this problem.

Currently, at Power Systems request, an outside consultant from Flight Dynamics has been called in to investigate the problem further. Based on this, it is not possible to issue our final report on June 4 as in-dicated in the above reference. We expect to be able to complete our evaluation and submit a response for this potential 10 CFR 50.55(e) concern by August 20, 1982.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems and Technology i

l REU/lej a

cc: Director of Inspection and Enforcement

~

U. S. Nuclear Regulatory Commission IL[I Washington, D.C.

20555 B206300291 920603 PDR ADOCK 05000389 0