Responds to NRC Re Violations Noted in IE Insp Rept 50-389/82-13.Corrective Actions:Weld 123-2 Presently Scheduled for re-examination Using Proper Calibr Block
ML20054K277
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/28/1982
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20054K276 List:
References
L-82-232, NUDOCS 8207010372
Download: ML20054K277 (2)


Text

,

P.O. BOX 529100 MI AM1, F L 33152 UStlRC RErnon -

$U%

AU ANIA, GEOHd[A 82.10N 2 A10 3 2.

" 'o ^ "o* ' a ' 'io " r co""^"v May 28, 1982 Ir82-232 Mr. James P. O'Reilly Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: RII:WPK St. Lucie Unit 2 Docket No. 50-389/82-13

Dear Mr. O'Reilly:

Florida Power & Light Company has reviewed the subject Inspection Report which identified the following violations; "Use of Incorrect Calibration Block for PSI UT of Weld 123-2."

Please find attached our response to this violation.

Very truly yours,

/

hk L

Robart E g

Vice President Advanced Systems and Technology REU/PPC/isc cc: Harold F. Reis, Esquire F207010372 820615 PDR ADOCK 05000389 G

PDR PEOPLE.. SERVING PEOPLE

~

d RII:WPK 50-389/82-13 Violation:

"Use of Incorrect Calibration Block for PSI UT Weld 123-2" 10 CPR 50.55.a(g), as implemented by paragraph 5.2.4 of the FSAR, requires in part that, ASME Code Class I components meet preservice (PSI) examination requirements of Section XI of the ASsE Boiler and Pressure Vessel Code (B&PV). Article 4 of ASME B&PV,Section V, referenced in Section XI, has been identified by the licensee as the applicabic Code for PSI ultrasonic inspection (UT) of reactor coolant pressure boundary piping. Table T-434.1 and paragraph T-434.3 of ASLIE B&PV,Section V require that the thickness of the UT calibration block be within one inch of the thickness of the weld.

Contrary to the above, on April 27, 1981, preservice inspection was not being performed in accordance with ASME B&PV,Section XI in that the thickness of the UT calibration block used for the 45 angle beam calibration for reactor coolant pressure boundary weld 123-2, zone 7, was not within one inch of the thickness of the weld.

This is a Severity Level V Violation (Supplement II.E)

Response

1)

FP&L concurs with the finding.

2)

The reason for the violation is examination personnel error. At that time ( April 1981) it was customary for NDE examiners to calibrate the ultrasonic equipment and then perform examinations as they became acces-sible, regardless of zoned location.

In the cited instance, the examiner was calibrated for " cold leg" primary coolant piping and had performed examinations on five different welds. The examined welds were located in three different zones with weld 123-2 being zone 7, which is a " hot leg".

Although it was correct to switch zones during the examination, it was not correct to apply the " cold leg" calibration to the thicker piping of the hot leg zones.

3)

Since June of 1981 it has been recognized by FP&L that such problems can occur when examination teams are allowed to float from zone to zone.

Thus, it has been our policy to assign examination crews to a particular zone with emphasis on calibration block applicability. Further, the present procedures, examiner orientation and the examinations which follow-up these sessions provide safegaards for the identification of calibration block selection problems.

4)

Weld 123-2 is presently scheduled to b'e re-examined using the proper calibration block. As stated above, examiner orientation provides a reminder to NDU examiners that they should be aware of ultrasonic res-ponse differences between calibrations and examinations. Examination data for the balance of plant data is carefully reviewed for such errors.

Primary coolant piping Jata_will.be re-reviewed to insure that such problems do not exist.

5)

Full compliance will be achieved by June 15, 1982.