L-82-126, Responds to Generic Ltr 81-36 Re NUREG-0737 Item II.D.1,PWR Relief & Safety Valve Testing.Valve Testing Completed in Aug & Dec 1981.Plant-specific Evaluations Will Be Completed by 821001
| ML17212B487 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 04/01/1982 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.D.1, TASK-TM GL-81-36, L-82-126, NUDOCS 8204060069 | |
| Download: ML17212B487 (8) | |
Text
REGULATORY ORMATION DISTRIBUTION SY 8 (RIDS)
ACGESS ION, NBR: 8204060069 DOC ~ DATE: 82/04/01 NOTARIZED:
NO FACIL:50"335 St ~ Lucio Planti Unit ii Flor ida Power L Light Co>>
AUTH ~ NAME AUTHOR AFFILIATION UMRIGPR ~ E ~
Florida Power 8 Light Co.
RE'CIP ~ NAME RECIPIENT AFF ILIATION EISENHUTF D>>G, Division of Licensing DOCKET 0
05000335
SUBJECT:
Responds to Generic Ltr 81 36 re NUAEG 0737 Item II~ D ~ ii'PNR relief 8, safety valve testin'g,Valve testing completed Aug 8
Dec 1981>>Plant-specific evaluations will be completed by 821001>>
DISTRIBUTION "CODE AO i6S
'COPIES "RECEIVED LTR ENCL SIZE ~
TITLE: Response to NUREG "0737/NUREG-0660 TMI Action Plan Rgmts (OL's)
NOTES:
RECIPIENT ID CODE/NAME ORB P3 BC 01 INTERNAL: ELD IE/DEP D IR 33 IE/DEP/EPLB NRR/DE/ADCSE 22 NRR/DE/ADSA 17 NRR/DHFS/DEPY29 NRR/DL/ADL 16 NRR/DL/DRAB 18 NRR/DSI DIR 24 NRR/DSI/ADPS 25 NRR/DS I/AEB NRR/DSI/RAB NRR/DST/ADT 32 RGN2 EXTERNAL: ACRS 3'NPOtJ
~ STARNES NRC PDR 02 NTIS COPIES LTTR ENC 7
1 1
3 1
1 1
1 3
1 1
1 1
1 1
10 1
1 1
1 1
1 RECIPIENT ID CODE/NAME IE 12 IE/DEP/EPDB NRR/DE D IR 21 NRR/DE/ADMQE 23 NRR/DHFS DIR 28 NRR/DL DIR 10 NRR/DL/ADOR 15 NRR/DSI ADRS 27 NRR/DS I/AD GP 31 NRR/DS I/ADRP 26 NRR/DS I/ETSB DIR 30 REG FI 04 FEMA REP DIV LPDR 03 NSIC 05 COPIES LTiTR ENCL
'TOTAL NUMBER OF COPIES REQUIRED:
LTTR SA ENCL
4
~W 0
M g
II
+
0
(
u I,I K
l W
l I(
n
.O. BOX 529100 MIAMI,F L 33152
~yglf/y~
FLORIOA POWER & LIGHTCOMPANY April 1, 1982 L-82-126 Office of Nuclear Reactor Regulation Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Mr. Eisenhut:
Re:
St. Lucie Unit 1
Docket No. 50-335 Post-TMI Requirements NUREG-0737, Item II.D.1 PWR Relief and Safet Valve Testin 4 g"Ql hI~D gpss g
1982'~
g I~tu I,QQN7 CB~
'I,~i)g~ y>~vl5I51 A G>
C The NRC Generic Letter No. 81-36 dated September 29, 1981 contains a
revised schedule for the submittal of the results of the relief and safety valve test program and the submittal of plant specific reports.
The initial NRC schedule and recommendations were contained in NUREG-0578, Section
- 2. 1.2 as later clarified in NUREG-0737, Item II.D.1.
The generic letter requested that each pressurized water reactor (PWR) utility submit on or before April 1, 1982, a preliminary evaluation supported by test results which demonstrates the capability of relief and safety valves to operate under expected operating and accident conditions.
This letter contains Florida Power and Light Company's response that is applicable to St. Lucie Unit 1 as required to be submitted prior to April 1, 1982.
Florida Power and Light is a participant in the Generic PWR Safety and Relief Valve Test Program implemented by the Electric Power Research Institute at the request of participating PWR Utilities in response to the USNRC recommendations for safety and relief valve testing.
The primary objective of the Test Program was to provide full scale test data confirming the functionability of primary system power operated relief valves and safety valves for expected operating and accident conditions.
The second object of the program was to obtain sufficient piping thermal hydraulic load data to permit confirmation of models which may be utilized for plant unique analysis of safety and relief valve discharge piping systems.
Relief valve tests were completed in August, 1981 and safety valve tests were completed in
- December, 1981.
The reports prepared by EPRI documenting the Test Program results are as follows:
oK S
~Q 82040600 PDR ADQCK 05000335 hS'2040'PDR,.~'.I-.';>".
PEOPLE... 5ERVING PEOPL
I C
1 I)I Jl 1
Mr. Darrell G. Eisenh~, Director Page 2
"Valve Selection/Justification Re ort" This report documents that the selected test valves represent all participating PHR plant safety and relief valves.
"T C
11 1
Iff ~iR d
1 "C
1 En ineerin Plant Condition Justification Re ort" These reports document the basis and justification of the valve test condi.tions for all participating PHR plants.
~l' R
11 f 1 I ~TI!
This report provides'vidence demonstrating the functionability of the selected test valves under the selected test conditions for all participating PMR plants.
"A lication of RELAP 5/MOD I for Calculation of Safet and Relief Valve Dischar e Pi in H drod namic
'Loads" This report represents an analytical model benchmarked against test data that may be used for plant unique analysis of safety and relief valve discharge piping systems.
All of the documents have been received by Florida Power and Light and are applicable to St. Lucie Unit 1.
They have been transmitted to Mr.
Harold Denton by David Hoffman of Consumers Power Company on behalf of the participating PHR utilities in a letter dated April I, 1982.
I In addi tion to providing the referenced reports, Florida Power and Light Company has performed a preliminary review of the Test Program results.
Based on the review, we have concluded that the valves tested represent the safety and relief valve designs, and that the conditions tested envelop the range of expected operating and accident conditions for St. Lucie Unit 0'l.
Also the above mentioned Reports do provide the evidence required by NUREG-0737, Item II.D.1.A which will be used to perform the final plant specific evaluations.
The September 29, 1981 NRC letter requested 'that plant specific final evaluations be submitted by July 1, 1982.
The Combustion Engineering Owners Group will assi.st in interpreting the test data, and provide
0 J
t
Mr. Darrell G. Eisenh Director Page 3
safety analyses and hardware recommendations if required.
Combustion Engineering has tentatively proposed that the final results of their evaluation will be completed by October 1, 1982. It is our intent to review their evaluation and recommendations and submit a plant specific evaluation of St. Lucie Unit 1 to you by November 15, 1982.
Very truly yours, Ro rt E. Uhrig 1ce President Advanced System and Technology REU/PKG/JDR/ras Attachment cc: