L-79-223, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/79-19 & 50-251/79-19.Corrective Actions: Existing Tech Spec Procedures Re Plastic Sleeve Implemented on 790731 & Operating Procedure 5163.1 Being Revised
| ML17338B076 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/10/1979 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML17338B075 | List:
|
| References | |
| L-79-223, NUDOCS 7909200362 | |
| Download: ML17338B076 (6) | |
Text
I'. 80>i 520>00, MIAMl,F L 334> '2 Au@us>t 10, 1979 1.-79-223 Mr. James P. O'Beilly, Director, Region iX Office of Inspection and Enforcement U.
S. Nuclear Regulatory Comm'ssion 101 Marietta Street, Suite 3100
- Atlanta, Georgia 30303
Dear Mr. O'Re'lly:
Re:
RII:RVL 50-250/79-19 50-251 79-19 Florida Power h Light Company has reviewed the subj~'.ct inspection report and a response is attached.
There is no proprietary information in the repor-,.
Very truly yours, bert U rig Vice President Advanced Systems
$, Technology RE U/MAS/cph Attachment cc:
Robert Low<..'tein, Esquire P(
V909$ 00 3 6$
~
'l> ( >(V t'
ATTAC!!
i~AN'1'(':
RII:RVL 50-250/79-:9 50-251/79-;'>
- Findin, A
As required by.'=.~c".ion 6. 8.1 o?
tl:<. "Tc <:hnica?..'.::><<-.:
<'i~.~'tm.:.'ritten procedure.:
and admini.';rativ<~,'~'cies t?~~',,-.Is"'o) the requirement,-.
and recomm&naati('ns t>f S-,c ion ". I,,;"(~,j. l.)f ANSI N18. 7-1972 a>>d Appendi x "t>" of li,.NR(: ?)egula~ <t,': l.'..<]<.
'?
shall be impl<sm>>,.cd.
Contrary to the al'<>ve, t,he fo~ lowing 'r'.<.
exam;.-'.<".-
r".?:r sent.
failure to impl=m< nt existing prcceduxo::
1)
No safety evaluation was performed as require<!
?t, AP 190.15,
'Pla'nt Changes and Modificati ons" for the p] <<s',-. i<<
." Icove placed over the 8 Monitor Tank over..".?ow line it.. '::3 ting i>>
siphon effeet that, led to 'e unpla>>ned releas<'
f con tamina tet water of June 11, 1979.
2)
Recirculation of Monitor Tanks without use of p,ideograph 8.4 of OP 5163.1, "KDS-ctaste Cond<.nsate Tank, Polishing Demineralize:
and Monitor Tank Operation",
whi ch addresses t?.i s evolution.
3)
Failure to log the unplann<:-<! liauid release on flu>>c: 31, i 979, and the flu>d transfer evolution 'aking plac>>
?t:.io-release in th<. Nuclear Op<'gator's
! og bool:,
s." r~'!>>irked b; paragraph
- 8. 4. 2. 3 of A 103. 2,
"?)ut.ic:s and R~.s:.onsibiliti<:s of Operators on Shift an<'! Mainteranc-of Op<erat in.; !.:.gs an<!
Records".
Res~see The plastic sleev was remove<!
from the
< v<.rflo<<
.'.~
<= before t.l~e end of the inspection.
To prevent recu -rence, the Plant
!!a>>age has str<>nc!,y
<:mphasi
.c<'he importance of verbatim procedure cori.-pliance i >>
s; letter t<i plant supervisor; personnel.
The lett<.r reitera:..'ha" it is every supervisor 's responsibi'.'y to a sure tha",i:; uersonn<.!
apply verbatim -ompliance to their p< rfurma>>cc o
?t c>< edures.
Compliance was ac.'sieved on July 31, l979.
ll~
Alg
Fin~di i B
As required by l~ection 6. 8. 1 of t.he "Tecffnical Sp~:c i written procedure" and admi nis Lrative r)ol icies tha t.
the requirements and recomn.endations of Section ANSI N18.7-1972
<<nd Appendix "A" of USNf(C Regula'<))i shall be established.
f 3. ca f 2.0Ils pI ~ ~Q Q or
( ~ 4 (.Q(l J an(: 5. ] <)f 4ulde
- 1. 33 Contrary to the aboveI no writ"Qn proc&< ure has j)co~ <<n, ablj shed for use in tran.;for "ing fluid from o>>~
m ni to> t u,f. to <<not'h('l.
ROSPOll<B Operating Procedure 5163.1 (baste Disposal System ii<~ste Condensate Tanks, Polishing Demineralizer and Monitor Tank 0:>e>'ation) w' l be revised to inc]ude instruction". related to tran~ <': rFing fluid f r".>m one monitor tank to another.
The revision will. )-<::cviewer'y the Plant Nuclear Safety Comms ttee by S< ptembe.",
2,',
]979, at whicn time compliance wil.l have been achie.c.~".:.
~~ ~