L-25-072, Day Steam Generator Tube Inspection Report

From kanterella
Jump to navigation Jump to search
Day Steam Generator Tube Inspection Report
ML25121A190
Person / Time
Site: Beaver Valley
Issue date: 05/01/2025
From: Blair B
Vistra Operations Company
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
L-25-072
Download: ML25121A190 (1)


Text

L-25-072 May 1, 2025 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 180-Day Steam Generator Tube Inspection Report Beaver Valley Power Station Barry N. Blair Site Vice President P.O. Box 4 200 State Route 3016 Shippingport, PA 15077 724-682-5234 In accordance with Beaver Valley Power Station, Unit No. 2, Technical Specification 5.6.6.2, "Unit 2 SG [Steam Generator] Tube Inspection Report," Vistra Operations Company LLC hereby submits the steam generator tube inspection results obtained during inspections conducted during the fall 2024 refueling outage (2R24).

There are no regulatory commitments contained in this submittal. If there are any questions, or if additional information is required, please contact Jack Hicks, Senior Manager, Licensing, at (254) 897-6725 or jack.hicks@vistracorp.com.

Enclosure:

Unit #2 - 2R24 Stearn Generator 180 Day Report cc:

NRC Region I Administrator NRC Resident Inspector NRC Project Manager Director BRP /DEP Site BRP/DEP Representative f

<; 750 0

I TR CORP

Enclosure L-25-072 Unit #2 - 2R24 Steam Generator 180 Day Report (120 pages follow)

VISTRA Programs Engineering Unit Beaver Valley Power Station Unit #2 - 2R24 Steam Generator 180 Day Report

Unit #2 - 2R24 Steam Generator 180 Day Report Page 2 of 29 Information Required by Technical Specification (TS) 5.6.6.2.1 Technical Specification 5.6.6.2.1 requires that a report be submitted to the Nuclear Regulatory Commission (NRC) within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Technical Specification 5.5.5.2, Unit 2 SG Program. For the fall 2024 refueling outage (2R24), the initial entry into MODE 4 occurred on November 10, 2024.

It is noted that Beaver Valley Unit 2 received Amendment 204 to adopt TSTF-577 on May 2, 2022.

This amendment changed the reporting requirements of TS 5.6.6.2.1. This will be the second report for Beaver Valley Unit 2 that uses the new reporting requirements. The Electric Power Research Institute (EPRI) Steam Generator Management Program: Steam Generator Integrity Assessment Guidelines, Appendix G, TEMPLATE FOR TSTF-577 180-DAY STEAM GENERATOR INSPECTION REPORT will be used as a guideline for development of this report.

NOTE: Refer to the Definitions of Abbreviations, Codes and Reporting Terminology section (Page 28) for abbreviations, 3 letter codes and other nomenclature used throughout this report.

Design and Operating Parameters Steam Generator Design and Operating Parameters SG Model / Tube Material / # SGs per unit Westinghouse 51M / Alloy 600MA / 3

  1. of tubes per SG / Nominal Tube Diameter /

Nominal tube thickness 3,376 / 0.875 inches / 0.050 inches Support Plate Style / Material Drilled Hole / Carbon Steel Last inspection date April 2023 (2R23)

EFPM since the last inspection 16.476 Total cumulative SG EFPY at 2R24 31.989 Mode 4 initial entry November 10, 2024 Observed primary to secondary leak rate since the last inspection and how it trended with time None Nominal indicated value of Thot 609°F Loose parts strainer The BVPS-2 Model 51M SGs do not contain design features that limit smaller sized objects from entering the tube bundle. Sludge lancing and Foreign Object Search and Retrieval (FOSAR) activities are performed every refueling outage which adequately mitigates potential degradation and consequences caused by foreign objects that are not captured by the feedwater control valves.

Degradation mechanism sub population No degradation mechanism sub populations were used for the purposes of Operational Assessment calculations.

Deviations from SGMP guidelines since the last inspection None Steam Generator Schematic without dimensions See Page 27

Unit #2 - 2R24 Steam Generator 180 Day Report Page 3 of 29 Per Technical Specification 5.6.6.2.1.a through 5.6.6.2.1.f, the following information is to be submitted to the NRC:

TS 5.6.6.2.1.a The scope of inspections performed on each SG:

Primary Side:

Bobbin Coil Probe (0.720 inch diameter probe utilized unless stated otherwise) 100 percent of the inservice tubes, full length, tube end to tube end, (except Row 1 through 4 U-bend regions as noted below) in non-sleeved tubes per Generic Letter (GL) 95-05, "Voltage-Based Repair Criteria for Westinghouse Steam Generator Tubes Affected by Outside Diameter Stress Corrosion Cracking," dated August 3, 1995 100 percent of the inservice tubes, from the hot leg tube end to the 8th hot leg TSP (straight length) in non-sleeved tubes in Rows 1 through 4 100 percent of the inservice tubes, from the cold leg tube end to the 8th cold leg TSP (straight length) in sleeved and non-sleeved tubes in Rows 1 through 4 100 percent of the inservice tubes, from the cold leg tube end to the top of the tubesheet sleeve on the hot leg side in sleeved tubes Rows 5 and higher 100 percent of the inservice tubes, from the top hot leg TSP (8th) to the top cold TSP (7th) in Row 3 and 4 U-bend regions using a 0.700 inch probe 100 percent of the hot leg sleeved tubes in Rows 3 and 4 from the top of the sleeve to the 8th hot leg TSP using a 0.630 inch wide groove probe

+POINT Probe (unless stated otherwise) 100 percent of Row 1 and 2 U-bend regions 100 percent of the hot leg TTS (from 6 inches above the TTS to 3 inches below the TTS) in non-sleeved tubes NOTE 1 100 percent of the cold leg TTS (from 6 inches above the TTS to 3 inches below the TTS) in non-sleeved cold leg tubes NOTE 1 100 percent of TSP DSI/DNI indications with a bobbin coil voltage > 2.0 volts 100 percent of TSP DSI indications with a bobbin coil voltage > 1.0 volt 100 percent of TSP DSI indications regardless of voltage size at TSP 01H/01C and TSP 02C/03C 100 percent of TSP mix residual signals < 55 degrees and > 1.25 volts 100 percent of TSP mix residual signals > 2.0 volts 100 percent of dented hot and cold leg TSPs > 5.0 volts 100 percent of dents > 2.0 but < 5.0 volts at the 1st through 8th hot leg TSPs 100 percent of dents located at AVB intersections (+/- 1 inch of AVB centerline) 100 percent of new AVB wear signals plus any previous wear with cycle growth > 6 percent 100 percent of freespan dings (All reported voltages) 100 percent of Row 3 through 10 U-bend regions in all SGs 100 percent of BLG and EXP signals in the hot leg tubesheet below the F* distance but above the tubesheet neutral axis 100 percent of BLG and EXP signals above the cold leg TTS 100 percent of bobbin "I-codes", such as freespan differential signals meeting the change criteria (Change criteria: phase rotation > 10 degrees and/or voltage amplitude > 0.5 volts)

Unit #2 - 2R24 Steam Generator 180 Day Report Page 4 of 29 100 percent of freespan signals not resolved as MBMs or without a historical review 100 percent of Westinghouse Alloy 800 tubesheet sleeves from 3 inches above the sleeve (STH+3") to 4 inches below the sleeve (SBH-4").

100 percent of nickel banded region in lower tubesheet joints of Westinghouse Alloy 800 tubesheet sleeves using a Ghent Version 2 probe Proactive examination of a representative sample of DSI indications < 2.0 volts previously confirmed to contain axial ODSCC 25 percent of TSP mix residual signals > 1.5 volts but < 2.0 volts Bounding of historical plugged tubes due to foreign object wear at the TTS and newly reported PLP signals In accordance with the guidance provided by GL 95-05, the 2R24 inspection consisted of a 100 percent full length bobbin probe examination of the inservice non-sleeved tubes in all three SGs.

All hot and cold leg TSP intersections were inspected using a 0.720 inch diameter bobbin probe.

The only exception to the use of the 0.720 inch diameter bobbin probe for GL 95-05 applications is the straight length section above the Alloy 800 hot leg tubesheet sleeves in Rows 3 and 4. Due to the thickness of the hot leg tubesheet sleeve wall which reduces the inside diameter of the tube and the inability of a 0.720 inch diameter bobbin probe to traverse the U-bend region of Rows 3 and 4, a 0.630 inch diameter wide groove bobbin probe was used to inspect the straight length section of the Row 3 and 4 tubes above the hot leg tubesheet sleeve including the TSP intersections.

GL 95-05 states that smaller or larger diameter probes can be used to inspect tubes when it is impractical to utilize a nominal-size probe provided that the probes and procedures have been demonstrated to give an equivalent voltage response and detection capability when compared to the nominal (in this case 0.720 inch) probe. Probe equivalency testing between the nominal 0.720 inch bobbin probe and 0.630 inch wide-groove bobbin probe was performed during 2R21.

It was successfully demonstrated that the 0.630 inch wide-groove probe met the equivalency requirements of Appendix H of the EPRI Steam Generator Management Program: Pressurized Water Reactor Steam Generator Examination Guidelines: Revision 8.

An eddy current scope expansion was not required in 2R24.

+POINT is a trademark or registered trademark of Zetec, Inc.

NOTE 1 - For those tube locations where the lower roll transition is located deeper into the tubesheet, the inspection distance into the tubesheet was adjusted to 5 inches below the top of the tubesheet to ensure adequate inspection coverage of the F* distance.

Unit #2 - 2R24 Steam Generator 180 Day Report Page 5 of 29 Primary Side Visual Examinations Tube Plugs - 100 percent of the tube plugs are visually examined (as-found and as-left condition) each time the primary side is opened for a scheduled inspection. This visual examination is to document the condition of the hot and cold leg tube plugs. This process also includes tube plug accountability. During 2R24, as well as in prior outages, the examinations verified that the correct number of tube plugs were present and in the proper tube locations. Installed tube plugs were examined and determined to be acceptable. No signs of degradation were observed.

Westinghouse Plug-in-Plug (PIP) - There are 9 hot leg and 9 cold leg tube locations (SG A - 4; SG B - 2; SG C - 3) which contain Alloy 600 plugs repaired with the Westinghouse PIP technique.

These locations are visually examined each outage to assess the condition of the tack weld which holds the PIP in place. No sign of cracking was reported in any of the eighteen PIP tack welds.

All tube plugs were accounted for and all were verified to be in their proper location.

Westinghouse Nuclear Safety Advisory Letter (NSAL) 12-1 (Revision 1) - A remote visual inspection of the area around the channel head drain line was performed in each hot and cold leg channel head to meet the requirements of Westinghouse NSAL 12-1 (R1), "Steam Generator Channel Head Degradation". Included in this examination was the:

Divider plate-to-channel head weld Divider plate-to-stub runner weld Tubesheet-to-channel head Z-seam area Tubesheet cladding The entire clad surface of the channel head bowl This inspection looked for evidence of gross defects such as indications in welds, missing weld filler material, a breach in the weld metal, and unusual discoloration of the weld metal and/or cladding imperfections. All inspections were determined to be acceptable. No sign of cladding breach, cracking, missing filler metal was observed. During 2R20, in the cold leg of SG C, a small area of discoloration (non-rust color) was observed approximately 1 foot from the divider plate. Subsequent review of previous channel head videos showed no change in this area of discoloration. The visual examination of this area in 2R24 showed no changes in appearance from that reported in 2R20, 2R21, 2R22, and 2R23. This area will continue to be visually examined each outage the primary manway covers are removed for an inspection.

Secondary Side Visual Examinations:

Secondary side tubesheet cleaning and visual inspections were completed during 2R24. The inspections are summarized below:

Sludge lancing in all three SGs Post sludge lancing cleanliness inspection in all three SGs Post sludge lancing FOSAR in all three SGs in the following areas:

o Hot leg and cold leg annulus region o Hot leg and cold leg peripheral tubes o Tube lane and tube lane peripheral tubes o Blowdown pipe and supports o Tube lane blocking devices o In-bundle PLP locations from eddy current testing In-bundle visual inspections of selected hot leg and cold columns from the tube lane in all three SGs Feedring and upper steam drum inspections in SG A

Unit #2 - 2R24 Steam Generator 180 Day Report Page 6 of 29 TS 5.6.6.2.1.b The nondestructive examination techniques utilized for tubes with increased degradation susceptibility:

No degradation mechanism sub populations were used for the purposes of Operational Assessment calculations. The BVPS Unit 2 SGs have various existing and potential degradation mechanisms, which are inspected for using qualified techniques. The techniques utilized are described in the TS 5.6.6.2.1.c.1 section.

Unit #2 - 2R24 Steam Generator 180 Day Report Page 7 of 29 TS 5.6.6.2.1.c For each degradation mechanism found:

1. The nondestructive examination techniques utilized:

For the degradation mechanisms observed during 2R24, the bobbin coil probe was used as the primary method of detection except at or below TTS, in Row 1 and 2 U-bends, detecting circumferential ODSCC in freespan dings, and detection of circumferential PWSCC in Rows 3-10 where the bobbin probe is not qualified. In these areas, the +POINT probe was employed. The

+POINT probe is also used to re-examine any ambiguous bobbin coil signals (I-codes) that were reported.

The 2R24 examination techniques were qualified, for detection and sizing (as applicable) of the existing and potential degradation mechanisms listed in the 2R24 Degradation Assessment. This qualification was in accordance with Appendices H and I of the EPRI, "Steam Generator Management Program: Pressurized Water Reactor Steam Generator Examination Guidelines:

Revision 8".

Site-specific ETSS's are developed prior to each steam generator inspection for each existing and potential degradation mechanism identified in the 2R24 Degradation Assessment. The site-specific ETSS's are developed in accordance with Appendices H and I of the EPRI, "Steam Generator Management Program: Pressurized Water Reactor Steam Generator Examination Guidelines: Revision 8."

The examination techniques utilized during 2R24 are considered "Site Validated" as defined in the EPRI, "Steam Generator Management Program: Pressurized Water Reactor Steam Generator Examination Guidelines: Revision 8," for each existing and potential degradation mechanism listed in the 2R24 Degradation Assessment.

Unit #2 - 2R24 Steam Generator 180 Day Report Page 8 of 29 Detection/Confirmation Probe and Technique Sheet Application: Beaver Valley 2R24 Inspection Degradation Mechanism Location Detection Probe Type Detection ETSS Sizing Probe Sizing ETSS Existing Degradation Mechanisms Axial ODSCC Sludge pile, expansion transition Bobbin I28413

+POINT I28431

+POINT I28424 Circ. ODSCC TTS expansion transition, (hot leg and cold leg)

+POINT 21410.1

+POINT 21410.1 TR-107197 Axial ODSCC Non-dented TSP intersections Bobbin I28411

+POINT I28431 Dented TSP intersection <5 volts Bobbin I28411

+POINT I28431 Dented TSP intersections 5 volts

+POINT 22401.1

+POINT I28431 Axial ODSCC Freespan dings >5 volts

+POINT 22401.1

+POINT I28432 Axial ODSCC Freespan dings 5 volts Bobbin 24013.1

+POINT I28432 Axial ODSCC Scratches/gouges due to U-bend forming in Rows 3 to 10 Bobbin I28413

+POINT I28432

+POINT I28424

+POINT I28432 Axial ODSCC Hot leg freespan (>6 inches above TTS),

Cold leg above sludge pile, at non-ding locations Bobbin I28412

+POINT I28432 Axial PWSCC TTS expansion transition and tubesheet region

+POINT 20511.1

+POINT 20511.1 Circ. PWSCC TTS expansion transition and tubesheet region

+POINT I11524

+POINT 20510.1 Axial PWSCC Dented TSP intersections <2V Bobbin 96012.1 with Note 1

+POINT 96703.1 Dented TSP intersections 2V

+POINT 96703.1

+POINT 96703.1 Circ. ODSCC Freespan dings

+POINT 21410.1

+POINT 21410.1 TR-107197 Oblique Circ. PWSCC Row 3 through 10 U-bends

+POINT 96511.2

+POINT 21410.1 TR-107197

Unit #2 - 2R24 Steam Generator 180 Day Report Page 9 of 29 Tube Wear AVB intersections Bobbin I96041.1 Bobbin 96004.3 TSP intersections Bobbin I96042.1 Bobbin 96004.3 Volumetric (not corrosion related)

Entire tube length Bobbin I28412

+POINT 21998.1 TTS expansion transition

+POINT 21998.1 Thinning Cold leg TSP intersections Bobbin 96001.1 Bobbin

+POINT 96001.1 21998.1 Resolution for Classification of Indications Freespan Differential Signal Freespan Bobbin I28412

+POINT I28432 Potential MBMs All Bobbin 96010.1

+POINT I28432 Potential Degradation Mechanisms Axial and Circ. PWSCC Row 1 and 2 U-bends

+POINT 96511.2

+POINT 20511.1 (ax) 20510.1 (circ)

High Freq.

+POINT 99997.1 Axial PWSCC Row 3 through 10 U-bends

+POINT 96511.2

+POINT 20511.1 ODSCC/PWSCC Axial and Circ Cold Leg TTS

+POINT 21410.1 I28424 20511.1

+POINT I28431 (ax OD) 21410.1 (circ OD)

TR-107197 (circ OD) 20511.1 (ax ID) 20510.1 (circ ID)

Axial ODSCC Dented AVB intersections Bobbin

+POINT 96012.1 with Note 1 22401.1

+POINT I28431 Tube Wear (Foreign Objects)

TTS periphery and tube lane Bobbin 27091.1

+POINT 21998.1

+POINT 21998.1(2) 2790x.3/.6(2)

Pitting Sludge pile Bobbin 96005.2

+POINT 21998.1

+POINT 21998.1(2)

Unit #2 - 2R24 Steam Generator 180 Day Report Page 10 of 29 Parent Tube Pre-Sleeve Installation Axial ODSCC Freespan Bobbin

+POINT I28412 I28424

+POINT I28424

+POINT I28424 N/A N/A Axial PWSCC Hot leg expanded tubesheet region

+POINT 20511.1 N/A N/A Circ PWSCC Hot leg expanded tubesheet region

+POINT 20510.1 N/A N/A Post-Sleeve Installation, including In Service Inspection Axial/Circ ODSCC/PWSCC Parent tube behind sleeve 610 Gimbaled

+POINT(3) 97-TR-FSW-019 N/A N/A Axial/Circ PWSCC Parent tube below sleeve 610 Gimbaled

+POINT(3) 20511.1, 20510.1 N/A N/A Axial/Circ PWSCC Nickel band area in lower sleeve joint Ghent Version 2(4)

Site ETSS DMW-20 N/A N/A Notes:

(1) Westinghouse supplemental screening criterion for the detection of axial PWSCC at dented TSPs with dents less than 2 volts. The supplemental screening criterion establishes the phase angle and voltage amplitude signal responses for when diagnostic +POINT probe inspections are required. More information provided in the RAI 1 response dated October 21, 2022 (ML22304A213).

(2) Application of ETSS 21998.1 may include use of a standard calibration using 0.063-inch diameter flat bottom holes or flat bottom holes of the ASME Code standard, based on observed flaw dimensions. ETSSs 27901.3, 27901.6, 27902.3, 27902.6, 27903.3, 27903.6, 27904.3, 27904.6, 27905.3, 27905.6, 27906.3 or 27906.6 may be applied as necessary based on the specific wear scar shape observed.

(3) The +POINT probe is used to inspect all areas of the sleeve and parent tube behind the sleeve, except for the lower tubesheet joint behind the nickel band region.

(4) Use of a combination (Combo) probe that contains a +POINT probe and Ghent Version 2 probe may be used. The Ghent Version 2 probe is used to inspect the lower tubesheet joint adjacent to the nickel band sleeve. Use of a combination (Combo) probe that contains +POINT coils and Ghent Version 2 coils may be used.

Unit #2 - 2R24 Steam Generator 180 Day Report Page 11 of 29

2. The location, orientation (if linear), measured size (if available), and voltage response for each indication. For tube wear at support structures less than 20 percent through-wall, only the total number of indications needs to be reported:

The 2R24 Examination Results section (Page 29 and Attachments A, B, and C) lists information that includes the location, orientation and measured sizes of service-induced indications. Further explanation of the information provided in the results section is given below:

Bobbin probe indications reported as "I-codes" (DNI, DTI or NQI) were re-inspected with the

+POINT probe.

Bobbin probe indications reported as PSI were re-inspected with the +POINT probe. If the

+POINT probe indicated a possible TSP ligament breach existed (CSI), it was further evaluated by the original equipment manufacturer (OEM) engineering group. All ligament breach extents were found to be acceptable for continued plant operation.

New AVB indications reported from the bobbin probe listed as PCT were inspected with the

+POINT probe. If the +POINT probe indicated no crack-like flaws were present within the wear scar, a wear call (WAR) was assigned to the +POINT report.

+POINT indications reported as "I-codes" (SAI, SCI, MAI or MCI) were either (a) removed from service via plugging, (b) left in service by installing hot leg tubesheet sleeves or (c) left in service if the indications qualified under the requirements of GL 95-05.

For hot leg top of tubesheet circumferential indications that could not be sleeved, a stabilizer was installed prior to plug installation.

The use of codes HAI and HCI are for tubes that were de-plugged with the intention to sleeve or return to service with Generic Letter 95-05. These were the historical SAI and SCI calls that caused the tube to be plugged in the first place. The de-plugged tube required inspection after de-plugging for a baseline prior to sleeving and returning the tube back to service. The HAI and HCI (H for historical) calls were to flag the original call.

Unit #2 - 2R24 Steam Generator 180 Day Report Page 12 of 29

3. A description of the condition monitoring assessment and results, including the margin to the tube integrity performance criteria and comparison with the margin predicted to exist at the inspection by the previous forward-looking tube integrity assessment:

Condition Monitoring (CM) is the assessment performed on observed indications of tube degradation to confirm that the SG integrity performance criteria embodied in the CM limits have not been violated. CM is a backward-looking evaluation to assess the as-found SG condition to validate that all SG performance criteria have been satisfied throughout the prior operating cycle. The CM limits are derived from the SG performance criteria in accordance with the EPRI SG Integrity Assessment Guidelines. The burst pressure simulation results contained within the CM assessment were calculated with the Westinghouse Single Flaw Model Version 2.5. The tube burst and ligament tearing calculations are consistent with the EPRI SG Degradation Specific Flaw Handbook methodologies.

Based on the BVPS 2R24 inspection results, no tubes contained indications which represented a challenge to structural or leakage integrity and all CM requirements are satisfied.

No indications were required to be in situ pressure tested. However, an in situ pressure test was performed to demonstrate compliance with the condition monitoring structural and leakage integrity performance criteria. Tube R18C26 in SG B contained a mixed mode ODSCC indication at the hot leg tubesheet expansion transition. While the mixed mode flaw screened out of in situ testing, there are no available industry calculational methods for determining the burst and leakage capabilities for a mixed mode flaw. Therefore, in situ testing was performed to satisfy the condition monitoring criteria. The in situ pressure proof and leak testing resulted in no burst and no leakage for any of the test pressures. The highest test pressure achieved was 5400 psi which was associated with the adjusted 3PNOP pressure. The table below contains the flaw sizing parameters for R18C26 in SG B. Eddy current testing was performed following in situ testing; however, there were no appreciable changes to the characteristics of the flaws.

Mixed Mode ODSCC Flaw Sizing Parameters SG Row Col Ind.

Locn Inch

Voltage, Vpp Maximum Depth

% TW(1)

Axial

Length, inch(1)

Circ.

Length, Deg(1)

PDA,

% (1)

Separation Distance B

18 26 SAI TSH 0.14 0.17 48.6 0.13 0.21 inch 27.7 deg SCI TSH

-0.05 0.10 40 59

6.8 Notes

(1) Sizing determined by line-by-line depth profiling.

All other degradation mechanisms satisfied the CM structural and leakage performance criteria through analytical methods. No tubes were pulled (removed) from the SGs during 2R24.

The tables on the following pages show the limiting indications observed in 2R24 in comparison to the CM limits as well as a comparison of the 2R24 results to the prior Operational Assessment (OA) prediction.

Unit #2 - 2R24 Steam Generator 180 Day Report Page 13 of 29 BVPS 2R24 Condition Monitoring Evaluation of Limiting Indications Degradation Mechanism Sizing Technique Limiting Maximum

Depth,

%TW Limiting

Length, inches Limiting PDA Limiting Burst
Pressure, psi Ligament Tearing
Pressure, psi CM Limit,

%TW CM Burst Pressure Reqmt, psi Ligament Tearing Reqmt, psi AVB Wear Bobbin 42 0.45 6136 6136 62

>4525

>2560 TSP Wear

+POINT 21 0.20(4) 7668 7668 47

>4525

>2560 Historical Volumetric(1)

+POINT 31(1) 0.35(1) 6437(1) 6727(1) 54

>4525

>2560 Cold Leg Thinning Bobbin 25 0.32 7289 7289 52

>4525

>2560 Axial ODSCC, TSP (GL 95-05)

+POINT 1.44 volts 2.07 x10-5 Cond.

POB 0.084 gpm 2.0 Volts

<1x10-2 Cond. POB 8.1 gpm Circ. ODSCC, TSH

+POINT 98(2) 169 deg 24.4 6253 0.08 volt(3)

See Burst

>4525

<1.0 volt(3)

+POINT 80 262 deg(2) 30.0 5920 0.13 volt(3)

See Burst

>4525

>2560

+POINT 90 160 deg 37.0(2) 5497 0.15 volt(3)

See Burst

>4525

>2560 Axial ODSCC, TSH

+POINT 49.5 0.42(2) 5961 6024 See Burst

>4525

>2560

+POINT 52.1(2) 0.12 6647 7372 See Burst

>4525

>2560 Circ. ODSCC, Freespan Dings

+POINT 88 34 deg 9.4 7140 0.24 volt(3)

See Burst

>4525

>2560 Parent Tube Degradation Behind Nickel Band Ghent V2 100%

Assumed 0.19 No Burst Potential (5) 2x10-5 gpm See Burst 0.40 inches

>4525 1.0 gpm Notes:

(1) CM performed for the largest maximum depth and largest flaw length of the population treated as one flaw and were in different tubes.

(2) Limiting flaw dimensions were contained in different tubes.

(3) Leakage integrity demonstrated by satisfaction of the in situ pressure test leakage screening voltage limit, 0.50 volt.

(4) The largest TSP axial flaw lengths were 0.15 inch and 0.16 inch. A bounding length of 0.20 inch was used for CM calculations (5) Flaw is located 8.63 inches below the top of tubesheet in the hard rolled region and therefore the flaw cannot burst due to the tubesheet constraint. If treated as a 100% TW freespan crack, the burst potential would be 5570 psi.

Unit #2 - 2R24 Steam Generator 180 Day Report Page 14 of 29 Comparison of 2R24 CM Results to Prior OA Prediction Degradation Mechanism Method Parameter Prior OA Prediction 2R24 Limiting Result Method Acceptable?

AVB Wear Deterministic Max. Depth, %TW 48 42 Y

TSP Wear Deterministic Max. Depth, %TW 33.3 21 Y

Cold Leg Thinning Deterministic Max. Depth, %TW 41.2 25 Y

Axial ODSCC TSP (GL 95-05)

GL 95-05 Volts 2.1 1.44 Y

SLB Leakage, gpm 0.224 0.088 Y

Burst Probability 3.14x10-5 1.18x10-5 Y

Circ ODSCC, TSH Deterministic Max. Depth, %TW 90.2 98(1)

Y(1)

Length, degrees 261 262 Y(3)

PDA 58.3 37 Y

Fully Probabilistic Max. Depth, %TW 95.3 (95th) 100(1)(2)

Y(1)

Length, degrees 348 (95th) 291(2)

Y PDA 70.5 (95th) 48.5(2)

Y Voltage-PDA Correlation 95/50 Vpp 0.42 0.25 Y

PDA from Correlation 64.9 55.7 Y

Axial ODSCC TSH Arith.

Special Case, Arith Monte Carlo for Leakage SED 58.4 42.9 Y

Max. Depth, %TW Arithmetic Monte Carlo 87.5 52.1 Y

SEL 0.36(4) 0.367 Y(3)

Burst Pressure /

PLigament 5051/3273(4) 5961/6024 Y

Fully Probabilistic Max. Depth, %TW 90.3 (95th) 52.6(2)

Y Length, inches 0.42 (95th) 0.44(2)

Y(3)

Circ. ODSCC, Dings Deterministic Max. Depth, %TW 92.9 88 Y

Length, degrees 120 34 Y

PDA 52.2 9.4 Y

Notes:

(1)

The maximum depth inspection result by phase angle sizing slightly exceeds the deterministic projection and is judged to be a result of the flaw phase angle being shifted to higher depths from the effects of the expansion transition and tubesheet material. 100% circumferential flaws are on the order of 3 volts, whereas the 2R24 flaw voltages are 0.25 volts and less.

(2)

Flaw parameter adjusted by the NDE mean sizing regression to compare to the fully probabilistic true size projection to provide a like comparison.

(3)

The as-found NDE parameter exceeded the OA prediction by a small margin which is well within NDE uncertainty and variability. A fully probabilistic OA method had been applied that showed that the upper tail of the parameter distribution is well represented and bounds the reported values, thus meeting the intent of the EPRI guidance.

(4)

Prior OA performed Arithmetic/Monte Carlo method for leakage integrity (ligament tearing pressure, PLig) using total length as SEL and maximum depth.

Unit #2 - 2R24 Steam Generator 180 Day Report Page 15 of 29

4. The number of tubes plugged or repaired during the inspection outage:

The following tables list the number of tubes plugged or repaired for each existing degradation mechanism reported during 2R24. This is the ninth consecutive outage where the alternate repair criteria of GL 95-05 have been implemented.

Degradation Mechanism 2RCS-SG21A Plug Sleeve Total Circumferential ODSCC at TSH and Sludge Pile 24 87 111 Axial ODSCC at TSH and Sludge Pile 0

3 3

Parent Tube Degradation Behind Sleeve Nickel Band 1

0 1

Total Repairs in Inservice Tubes 25 90 115 De-Plugged Tube with TTS Indication - Returned to Service with Sleeve 15 Notes for 2RCS-SG21A:

1) 105 tubes were successfully repaired with Alloy 800 hot leg tubesheet sleeves and 25 tubes were plugged. Of the 105 tubes that were successfully sleeved, 15 of those were de-plugged tubes containing top of tubesheet indications that were returned to service using the sleeving process.
2)

One tube that was de-plugged contained a volumetric indication that was unchanged from when it was plugged, was able to be returned to service without sleeving. The total number of tubes returned to service in 2RCS-SG21A was 16.

3)

Four tubes were de-plugged then re-plugged in the same outage because they could not be returned to service. The four tubes are not listed in the table above because the tubes were not in service.

4)

Four tubes were sleeved then subsequently plugged because the acceptance criteria for the sleeving process was not met. The tubes are included in the above table in the plug column only since the tubes were not returned to service.

Unit #2 - 2R24 Steam Generator 180 Day Report Page 16 of 29 Mechanism 2RCS-SG21B Plug Sleeve Total Circumferential ODSCC at TSH and Sludge Pile 8(4) 41 49(4)

Axial ODSCC at TSH and Sludge Pile 0

4 4

Mixed Mode ODSCC at TSH 1

0 1

AVB Wear 2(4) 0 2(4)

Total Repairs in Inservice Tubes 10 45 55 De-Plugged Tube with TTS Indication - Returned to Service with Sleeve 24 Notes for 2RCS-SG21B:

1) 69 tubes were successfully repaired with Alloy 800 hot leg tubesheet sleeves and 10 tubes were plugged. Of the 69 tubes that were successfully sleeved, 24 of those were de-plugged tubes containing top of tubesheet indications that were returned to service using the sleeving process.
2)

Two tubes that were de-plugged were able to be returned to service without sleeving based on no degradation detected during eddy current inspection of the tubes.

3)

Two tubes that were de-plugged were able to be returned to service with application of GL 95-05. The total number of tubes returned to service in 2RCS-SG21B was 28.

4)

One tube was plugged for both a circumferential ODSCC at TSH and for AVB Wear 40%. The tube was included in the rows for both degradation mechanisms but counted as only one tube for the total tubes plugged.

Mechanism 2RCS-SG21C Plug Sleeve Total Circumferential ODSCC at TSH and Sludge Pile 8

30 38 Axial ODSCC at TSH and Sludge Pile 0

4 4

Circumferential ODSCC at Freespan Dings 1

0 1

Total Repairs in Inservice Tubes 9

34 43 Notes for 2RCS-SG21C:

1) 34 tubes were successfully repaired with Alloy 800 hot leg tubesheet sleeves and 9 tubes were plugged.
2)

It is noted that a plug removal campaign was not performed in 2RCS-SG21C.

Unit #2 - 2R24 Steam Generator 180 Day Report Page 17 of 29

5. The repair methods utilized and the number of tubes repaired by each repair method:

Westinghouse Alloy 800 leak limiting sleeves A total of 208 hot leg tubesheet sleeves were installed in 208 tubes remaining inservice for degradation reported at the hot leg top of tubesheet during 2R24. It is noted that 39 of the tubes that were sleeved, were de-plugged and inspected prior to returning the tube to service with the sleeving process. During 2R24, one tube that was sleeved in a previous refueling outage was taken out of service by plugging. The table below contains the total number of sleeves inservice following 2R24:

SG Sleeves Installed and Inservice in 2R24 Inservice Sleeves Plugged in 2R24 Total # of Sleeves Inservice Prior to 2R24 Total # of Sleeves Inservice Following 2R24 2RCS-SG21A 105 1

428 532 2RCS-SG21B 69 0

283 352 2RCS-SG21C 34 0

94 128 TOTAL 208 1

805 1012

Unit #2 - 2R24 Steam Generator 180 Day Report Page 18 of 29 TS 5.6.6.2.1.d An analysis summary of the tube integrity conditions predicted to exist at the next scheduled inspection (the forward-looking tube integrity assessment) relative to the applicable performance criteria, including the analysis methodology, inputs, and results:

The EPRI SG Integrity Assessment Guidelines provide guidance for methodologies and approaches to performing an Operational Assessment (OA). Typically, the OA is performed with simplified techniques, by fully probabilistic techniques (Monte Carlo), or by a combination of both. The simplified techniques use a worst-case degraded tube approach by determining the single largest flaw that could be present at the beginning of the inspection interval and applying a conservative growth rate (maximum or 95th percentile growth) to project that flaw to the end of the next inspection interval. The fully probabilistic technique projects the entire flaw population to the end of the inspection interval through simulations that apply growth and uncertainty distributions to distributions of flaw size, material property, and burst relation. Both techniques consider flaws that may be undetected and flaws that may initiate during the inspection interval. The methodologies are further defined by the repair strategy for the given degradation mechanism, repair-on-detection or repair based on NDE sizing. The repair on NDE sizing methodologies consider flaws that are left in service based on acceptable flaw sizes that are defined by the technical specifications. The OA for repair on NDE sizing techniques must include NDE uncertainties. Wear at support structures, volumetric wear from foreign material, and cold leg thinning are examples of repair on NDE sizing mechanisms. Stress corrosion cracking degradation are examples of repair on detection mechanisms. NDE sizing uncertainties are not required to be included in repair on detection techniques since all known flaws have been repaired and no known flaws are returned to service that were measured by NDE techniques. Postulated undetected flaws assumed in repair on detection techniques are determined based on true physical flaw dimensions. All OA techniques are performed at 0.95 probability and 50% confidence level (95/50). All OA techniques also account for the 95/50 tube material and burst relation adjustments.

Methodologies in the Cycle 25 OA include:

Worst Case Degraded Tube Simplified Techniques:

o Arithmetic o Mixed Arithmetic/Monte Carlo o Arithmetic Special Case Fully Probabilistic Simplified Techniques The worst-case degraded tube arithmetic OA approach applies a conservative growth allowance, either 95th percentile or maximum flaw growth rate, to the largest flaw left in service or largest potentially undetected flaw at the beginning of cycle (BOC) and compared to the performance criteria with material property and burst relation uncertainties considered. The largest flaw left in service is adjusted for the mean NDE sizing regression and applying the upper 95/50 percentile NDE sizing uncertainty. The end-of-cycle (EOC) flaw length is equal to a physically bounding value (e.g., tube support width) or 95th percentile length of detected flaws for at least the last 2 inspections. This procedure provides a conservative estimate of the lower 95th percentile burst pressure at the end of the inspection interval.

Unit #2 - 2R24 Steam Generator 180 Day Report Page 19 of 29 The mixed arithmetic/Monte Carlo technique is similar to the arithmetic technique, except that the material property and burst relation uncertainties are individually sampled and combined using Monte Carlo simulations. The NDE sizing uncertainty is deterministically derived at the 95/50 value. The Westinghouse SFM computer code is used to perform the Monte Carlo simulations.

The worst-case degraded tube arithmetic special case approach can be used for plug-on-detection mechanisms (i.e., cracking). This method was developed for cases where the 95th percentile flaw size is very large and is only applicable when the number of flaws is small. Section 8.5.2 of the EPRI SG Integrity Assessment guidelines provides further information and justification for this method.

Fully Probabilistic Technique The operational assessment of SCC degradation mechanisms is performed using fully probabilistic methods through application of the Westinghouse Full Bundle Model (FBM) software package. The basic methodology for the fully probabilistic analysis is the same for each degradation mechanism, however, the specific inputs for each mechanism may be different. The fully probabilistic model combines the BOC flaw size distributions with the growth distributions to determine the probability of burst (POB), probability of accident induced leakage (POL), lower 5th percentile burst pressure and 95th percentile accident leak rate at the end of the inspection interval. The results are compared to the SG performance criteria.

Unit #2 - 2R24 Steam Generator 180 Day Report Page 20 of 29 Summary of Results The table below provides a summary of the Cycle 25 OA results for predicted structural and leakage integrity parameters for each degradation mechanism and for each OA methodology used. The table provides the predicted burst pressure, ligament tearing pressure, SLB leak rate, and for fully probabilistic OA methods, the POB and probability of SLB leak (POL) as applicable for the applied OA method. When the predicted burst pressure is 4525 psi or greater, the structural integrity performance criteria for OA is satisfied. Likewise, when the ligament tearing pressure is 2560 psi or greater no leakage at SLB conditions is predicted and therefore the accident induced leakage performance criteria for OA is satisfied. The structural and leakage performance criteria are satisfied for fully probabilistic OA methods when the POB and POL values are each 5% or less. It is noted that additional OA methodologies may have been used as defense-in-depth measures, which are also included in the table. All degradation mechanisms satisfied the structural and leakage performance criteria for all OA methods used.

The OA established that BVPS-2 can operate for at least 1.437 EFPY for the Cycle 25 period without exceeding the SG structural or leakage integrity performance criteria for the observed and presumed flaws from the 2R24 inspection. Degradation mechanisms that are not under the purview of an alternate repair criterion were evaluated for structural (burst) and leakage potential for the projected flaw condition at the end of Cycle 25 using either simplified (deterministic) or fully probabilistic methods, or both. When deterministic OA leakage integrity assessments were performed, the flaw ligament tearing pressures are calculated and the POL is zero when the minimum ligament tearing pressure is satisfied. All degradation mechanisms evaluated through deterministic methods have a zero POL at the limiting accident (SLB) conditions for the projected flaw condition at the end of Cycle

25. For fully probabilistic OA evaluations, the probabilities of burst and leakage for each mechanism were calculated and compared to the 5% performance criterion. For each degradation mechanism evaluated satisfied the POB and leakage 5% performance criterion. The combined accident induced leakage from tube degradation, repair hardware, postulated pre-existing operational leakage, and application of GL 95-05, satisfied the allowable leakage limit for all leakage sources.

Unit #2 - 2R24 Steam Generator 180 Day Report Page 21 of 29 BVPS Unit 2 Cycle 25 Operational Assessment Burst and Leakage Summary MD-Maximum Depth, SED-Structural Effective Depth, SEL-Structural Effective Length Deterministic Fully Probabilistic Mechanism Case Model(1)

Burst Pressure (psi)

Ligament Tearing Pressure (psi)

POB (%)

POL

(%)

Lower 5%

Burst Pressure (psi)

SLB Leak Rate (gpm)

Circ ODSCC at TSH A

Arithmetic/Monte Carlo & Probabilistic 5521 Note 7 1.900 4.233 5175 0.615 B

Vpp to Burst Regression (Arithmetic) 5766 Axial ODSCC at TSH A

Arithmetic Special Case & Probabilistic 5033 6162 0.096 0.001 6215 0

B Arithmetic/Monte Carlo, MD as SED for Leakage 3366 C

Arithmetic/Monte Carlo using SED and SEL 4645 5593 D

Probabilistic, EPRI Default MD Growth 0.182 0.001 6033 0

Axial ODSCC at TSP, GL95-05 A

NRC GL 95-05 4.30x10-05 0.341 Axial ODSCC at FDB A

Arithmetic Special Case(6) & Probabilistic 4615 5021 0.75 0.081 5628 0

B Arithmetic/Monte Carlo, MD as SED for Leakage 3510 Circ ODSCC at FS Dings A

Arithmetic/Monte Carlo & Probabilistic 7015 Note 7 0

0.009 7141 0

Axial PWSCC at Dented TSPs A

Probabilistic 0.351 0.013 6081 0

Axial ODSCC at FS Dings A

Probabilistic, +POINT probe 0.521 0.046 5886 0

B Probabilistic, Bobbin Coil 0.458 0.045 5953 0

Axial PWSCC at TSH A

Arithmetic/Monte Carlo 4604 6032 B

Arithmetic/Monte Carlo, MD as SED for Leakage 4281 Oblique PWSCC R3-8 A

Arithmetic/Monte Carlo 6682 5887

Unit #2 - 2R24 Steam Generator 180 Day Report Page 22 of 29 BVPS Unit 2 Cycle 24 Operational Assessment Burst and Leakage Summary MD-Maximum Depth, SED-Structural Effective Depth, SEL-Structural Effective Length Deterministic Fully Probabilistic Mechanism Case Model(1)

Burst Pressure (psi)

Ligament Tearing Pressure (psi)

POB (%)

POL

(%)

Lower %

5 Burst Pressure (psi)

SLB Leak Rate (gpm)

Axial ODSCC at U-Bend Scratches A

Fully Probabilistic, MRPC 0.228 0.021 6394 0

B Fully Probabilistic, Bobbin 0.177 0.014 6547 0

Axial ODSCC at FS A

Arithmetic/Monte Carlo & Probabilistic 4668 5645 0.724 0.016 5562 0

B Arithmetic/Monte Carlo, MD as SED for Leakage 3732 Circ PWSCC at TSH A

Arithmetic/Monte Carlo 5520 5453 0

B Arithmetic/Monte Carlo, MD over 360° for Leakage 4021 0

Cold Leg Thinning A

Arithmetic/Monte Carlo 5036 5036 0

AVB Wear A

Arithmetic/Monte Carlo 5431 5431 0

FDB/TSP Wear A

Arithmetic/Monte Carlo 5853 5853 0

Volumetric A

Arithmetic/Monte Carlo 5418 5418 0

Parent Tube Degradation Behind Sleeve Nickel Band A

Sleeve Qualification, WCAP-15919-P Note 3 Note 2 2x10-4 Circ ODSCC at Cold Leg TTS in De-Plugged Tubes A

Arithmetic & Fully Probabilistic 5521 Note 7 0.071 0.174 6238 0

Alloy 800 Sleeves(4)

SLB Leakage, All SGs, 1012 Sleeves 0.0146(4)

SLB leakage, Limiting SG A, 532 Sleeves 0.0077(4)

B&W Roll Plugs(5)

SLB Leakage, All SGs, 461 Roll Plugs 0.00062(5)

SLB Leakage, Limiting SG C, 160 Roll Plugs 0.00022(5)

Unit #2 - 2R24 Steam Generator 180 Day Report Page 23 of 29 Notes:

(1) The Arithmetic/Monte Carlo OA method for this mechanism refers to the simplified worst-case degraded tube arithmetic method where the uncertainties are combined with Monte Carlo simulations and the NDE uncertainties are applied deterministically at 95/50.

(2) Per WCAP-15919-P a degraded lower tubesheet sleeve joint leaks at 2 x 10-5 gpm per sleeve at SLB conditions. 10 sleeves are assumed to be degraded.

(3) This mechanism is located at the neutral plane of the tubesheet. The constraining effects of the tubesheet eliminates tube burst capability.

(4) The Alloy 800 tubesheet sleeve leakage at SLB conditions is 1.438 x 10-5 gpm per sleeve.

(5) The B&W rolled plug leakage at SLB conditions is 1.354 x 10-6 gpm per plug.

(6) The Arithmetic Special Case method was applied with combining uncertainties through Monte Carlo simulations.

(7) Leakage integrity is demonstrated by comparison of the largest flaw voltage amplitude to the EPRI In Situ Pressure Test Guideline threshold voltage for leak testing value (VTHR-L) for the applicable mechanism. Flaw voltage was less than the VTHR-L value.

Unit #2 - 2R24 Steam Generator 180 Day Report Page 24 of 29 TS 5.6.6.2.1.e The number and percentage of tubes plugged or repaired to date, and the effective plugging percentage in each SG:

The following table lists the required information for each steam generator as of the end of 2R24:

SG Tubes Plugged 2R24 Tubes De-Plugged 2R24 Total Plugged Tubes after 2R24 Percent Plugged Sleeves Inservice Equivalent Plugs from Sleeving Effective Plugging %

2RCS-SG21A 25 16 325 9.627 532 21.89 10.275 2RCS-SG21B 10 28 258 7.642 352 14.49 8.071 2RCS-SG21C 9

0 298 8.827 128 5.27 8.983 TOTAL 44 44 881 8.699 1012 41.65 9.110

Unit #2 - 2R24 Steam Generator 180 Day Report Page 25 of 29 TS 5.6.6.2.1.f The results of any SG secondary side inspections:

Secondary side tubesheet sludge lancing and FOSAR were completed in all SGs in 2R24. Visual inspections and ultrasonic examinations were also completed in SG A in 2R24.

The 2R24 tubesheet sludge lancing removed a total of 90.0 lbs of sludge from the 3 SGs: 29.5 lbs from SG A, 40.5 lbs from SG B, and 20.0 lbs from SG C. Deposit removal amounts have fluctuated from outage to outage but generally have been stable to slightly increasing.

FOSAR of the peripheral annulus region, tube lane, and investigation of new PLP signals in all SGs revealed 7 newly identified metallic objects and 4 legacy objects. The most significant object was found on the cold leg tubesheet of SG A and was a metal rod that measured 18 inch long with a 0.125-inch diameter. This object was first identified during 2R22 (2021) and was visually confirmed to have remained unchanged and did not produce any tube wear or PLP signals. The object was located between Tube Rows 11-12 and Tube Columns 45-59. No tube wear was associated with this object through eddy current testing. The object was unable to be retrieved and remains in SG A. An evaluation was completed to justify leaving the object in the SG. The remaining metallic objects were small bristle wires (7), metal shard (1), weld slag (1), and a 3.5-inch rod (1). Two bristle wires and the 3.5-inch rod were retrieved from the SG. No tube wear was associated with any of these objects. The weld slag was firmly wedged between 2 tubes. All objects not retrieved have been successfully evaluated to remain in the SGs for at least an additional cycle of operation. The table below summarizes the objects:

SG Description Elevation Row Col Leg Length (in)

Height (in)

Width (in)

Diameter (in)

Metallic Retrieved 2A Wire Bristle TTS 26 85 HL 0.35 0.01 Yes Yes 2A Sludge Rock TTS 14 77 HL 0.125 0.0625 0.125 No No 2A Sludge Rock TTS 10 75 HL 0.406 0.25 0.25 No No 2A Graphite TTS 16 70 HL 0.25 0.01 0.02 Yes No 2A Rod TTS 11 59 CL 18.00 0.125 Yes No 2A Wire Bristle TTS 9

44 HL 0.375 0.0625 Yes No 2A Wire Bristle TTS 9

44 HL 0.406 0.02 Yes No 2A Scale TTS 13 11 CL 0.406 0.25 0.406 No No 2A Wire Bristle TTS 11 46 HL 0.03 0.02 Yes Yes 2A Wire Bristle TTS 11 46 HL 0.25 0.01 Yes No 2B Wire Bristle TTS 3

44 HL 0.3 0.01 Yes No 2B Weld Slag TTS 4

14 HL 0.4 0.2 0.4 Yes No 2B Scale TTS 9

31 HL 0.2 0.2 0.1 No No 2B Sludge Rock TTS 14 3

HL 0.405 0.25 0.405 No No 2B Sludge Rock TTS 39 27 CL 0.405 0.75 0.0405 No No 2B Sludge Rock TTS 40 30 CL 0.25 0.25 0.3 No No 2B Sludge Rock TTS 43 48 CL 0.406 0.25 0.406 No No 2B Sludge Rock TTS 42 50 CL 0.406 0.25 0.406 No No 2B Sludge Rock TTS 41 65 CL 0.3 0.5 0.405 No No

Unit #2 - 2R24 Steam Generator 180 Day Report Page 26 of 29 2B Scale TTS 1

48 HL 0.4 0.75 0.4 No No 2B Wire Bristle TTS 4

44 HL 0.2 0.01 Yes No 2C Rod TTS 46 47 CL 3.5 0.2 Yes Yes 2C Sludge Rock TTS 17 85 CL 0.25 0.7 0.4 No No 2C Sludge Rock TTS 5

75 HL 0.3 0.2 0.4 No No 2C Sludge Rock TTS 6

78 HL 0.5 0.3 0.3 No No 2C Sludge Rock TTS 34 74 CL 0.4 1

0.4 No No In addition to FOSAR activities, visual inspections in all SGs were performed of the blowdown pipe elbow weld near the annulus and the blowdown pipe support bracket to tubesheet weld near the center of the SGs. No degradation was found on the blowdown pipes, blowdown pipe elbow tubesheet welds, and the pipe support bracket tubesheet weld.

Visual inspections were also performed on the tube lane blocking devices in all SGs. A tube lane blocking device consists of 4 plates that are fillet welded together to form a box. The front and back plates contain an access hole to allow for sludge lance tooling and visual inspections. The side plates, excluding the first blocking device entering the tube lane, contain windows cutouts to allow for sludge lancing and viewing the hot leg and cold leg tubes. This assembly sits atop and is tack welded to the support blocks which the blowdown pipe passes through. For each blowdown pipe on both sides of the tube lane, there are 5 groupings of tube lane blocking devices. Erosion of these components had been identified in prior inspections with recommendations for monitoring each outage. The 2R24 visual inspections of each set of tube lane blocking devices confirmed active progression of erosion of these components. The visual inspections showed that sufficient weld material is present and other welds were unaffected by the erosion to provide integrity of the blocking devices. The observed degraded conditions of the tube lane blocking devices are not expected to significantly impact or compromise the functionality of the tube lane blocking devices. This condition will continue to be monitored in future outages.

Visual inspection of the SG A steam drum components included a general inspection of the primary and secondary moisture separator components, swirl vanes, riser and downcomer barrels, orifice rings, tangential nozzles, drain pipes, and general area surfaces and other components at the mid-deck plate and lower deck plate regions including the feedwater header and J-nozzles. In addition, the level instrumentation tap holes were inspected for deposits or blockages. The condition of the steam drum internal components is generally good with local areas of minor erosion. Areas of erosion included impingement erosion of feedwater header pipe underneath several J-nozzles on the feedwater header and a primary moisture separator downcomer barrel. Internal erosion at several J nozzle internal pipe penetrations was also observed. The most significant was on J-nozzle #21 where the internal nozzle penetration pipe material was eroded to the extent that the back side of the exterior attachment fillet weld was visible over a short extent when view from inside the feedwater pipe. An evaluation concluded that the condition had not significantly changed over the last 5 cycles from the last inspection and it is expected that the erosion will not significantly progress over the next 6-cycle inspection interval.

Routine ultrasonic (UT) header pipe thickness measures were taken at 9 locations around the ring header and at 4 azimuthal positions at each of the 9 locations (i.e., top, bottom, and sides (2) of the pipe). These measurements showed acceptable pipe thicknesses but with gradual thinning in some areas over time. The SG level instrumentation tap holes exhibited evidence of deposit buildup and scaling inside the pipe from the inner SG pipe penetrations to the instrument isolation valves. The general condition of the level instrument lines was similar to the condition found in SG-B and SG-C that were inspected in 2R23 and 2R22, respectively.

Unit #2 - 2R24 Steam Generator 180 Day Report Page 27 of 29

Unit #2 - 2R24 Steam Generator 180 Day Report Page 28 of 29 Definitions of Abbreviations, Codes, and Reporting Terminology 3 Letter Code Definitions Term Bobbin Coil Probe BLG Bulge DNI Dent/Ding with a Possible Indication DSI Distorted Tube Support Plate Signal with Possible Indication DTI Distorted Tubesheet Signal with Possible Indication EXP Tubesheet Expansion MBM Manufacturer's Burnish Mark NQI Non-Quantifiable Indication PCT Percent Through Wall PSI Possible Tube Support Plate Indication (Ligament Breach)

TSP Tube Support Plate Term

+POINT Probe CSI Confirmed Tube Support Plate Indication (Ligament Breach)

DIS Distance Between Hydraulic Expansions Not Met HAI Historical Axial Indication HCI Historical Circumferential Indication MAI Multiple Axial Indications MCI Multiple Circumferential Indications NDF No Degradation Found SAI Single Axial Indication SCI Single Circumferential Indication VOL Volumetric Indication WAR Wear Additional Definitions Term Definition AVB Anti-Vibration Bar CL Cold Leg (Outlet)

DENT Observed within a Tube Support Plate DING Observed in Free-Span Region of the Tubing EPRI Electric Power Research Institute SG Steam Generator HL Hot Leg (Inlet)

NSAL Nuclear Safety Advisory Letter ODSCC Outside Diameter Stress Corrosion Cracking PLP Possible Loose Part PWSCC Primary Water Stress Corrosion Cracking TSP Tube Support Plate TTS Top of Tubesheet

Unit #2 - 2R24 Steam Generator 180 Day Report Page 29 of 29 2R24 SG Examination Results Attachments A, B, and C provide the examination results for tubes with service-induced indications in the Beaver Valley Power Station, Unit No. 2 SGs.

NOTE: The majority of the data contained in the Attachments comes from the production analysis process however, some data has been re-sized or re-profiled to address structural integrity concerns.

Therefore, variations in the dimensions of a given indication (length, angular extent, voltage) may exist between this document and any documents previously submitted to the NRC in support of the Fall 2024 outage (2R24). Regardless of the source of the data being provided, tubes that exceeded the plugging or repair limit were properly dispositioned prior to returning the SGs to service (MODE 4).

Refer to the following tables for a description of terms used in these attachments.

Description of Column Headings and Data Abbreviations Used in Steam Generator Examination Results Report Header Definitions Term Definition ROW/COL Row & column designation of tube location IND Type of indication LOC Location of nearest support structure INCH Indication distance from nearest support structure

%TW Measured percent through wall of an indication LENGTH Field measured length of an indication ANGLE Measured angular extent of an indication around the tube WIDTH Measured width of an indication VOLTS Measured voltage amplitude of an indication PHASE Measured angular rotation of an indication CHAN Recording channel of an indication FROM Starting point of examination TO End point of examination Examination Extent Definitions (FROM - TO)

Term Definition 01C 1st Tube Support Plate on Cold Leg Side 01H 1st Tube Support Plate on Hot Leg Side AVB1 1st Anti-Vibration Bar (Numbered Hot Leg to Cold Leg)

SBH Bottom of Sleeve - Hot Leg STH Top of Sleeve - Hot leg TEC Tube End - Cold Leg TEH Tube End - Hot Leg TSC Cold Leg Tubesheet (Secondary Face)

TSH Hot Leg Tubesheet (Secondary Face)

Unit #2 - 2R24 Steam Generator 180 Day Report Attachment A BEAVER VALLEY UNIT #2 2R24 SG EXAMINATION RESULTS 2RCS-SG21A TUBES WITH SERVICE INDUCED INDICATIONS

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 1

3 DNI 04H -0.02 1.58 25 P1 08H TEH 1

14 DNI 08C -0.07 1.28 33 P1 08C TEC 1

24 DNI 08C 0.00 2.10 47 P1 08C TEC 1

37 DNI 04H 0.15 1.47 15 P1 08H TEH 1

43 DNI 08C 0.00 1.50 51 P1 08C TEC 1

43 SCI TSH -0.14 0.27 135 1.03 0.30 108 P2 TSH TSH 1

53 DNI 08C 0.00 1.43 43 P1 08C TEC 1

53 SCI TSH -0.11 0.16 252 1.93 0.16 80 P2 TSH TSH 1

55 DNI 08C 0.00 1.27 47 P1 08C TEC 1

60 SCI TSH -0.04 0.23 54 0.41 0.14 99 P2 TSH TSH 1

61 SCI TSH 0.02 0.18 40 0.31 0.08 66 P2 TSH TSH 2

11 DNI 07H 0.00 1.15 54 P1 08H TEH 2

24 DSI 07H 0.10 0.30 161 P1 08H TEH 2

53 DNI 08C 0.00 1.38 26 P1 08C TEC 2

87 DNI 05H 0.02 1.72 52 P1 08H TEH 2

88 DSI 02H 0.05 0.36 90 P1 08H TEH 2

88 DNI 06H 0.05 1.74 42 P1 08H TEH 2

89 DNI 08C -0.02 1.25 37 P1 08C TEC 2

89 DNI 07H -0.02 1.24 55 P1 08H TEH 2

92 DSI 03H -0.05 0.31 115 P1 08H TEH 2

93 DSI 03H -0.05 0.44 131 P1 08H TEH 3

15 DSI 03H 0.05 0.79 114 P1 08H TEH 3

15 DNI 07H 0.00 2.00 30 P1 08H TEH 3

17 DNI 03C 0.00 1.15 29 P1 08C TEC 3

23 DNI 07C 0.00 1.19 47 P1 08C TEC 3

24 DNI 07C 0.00 1.39 47 P1 08C TEC 3

26 DNI 03H 0.02 2.53 41 P1 08H TEH 3

26 DNI 03H 0.00 2.39 42 P1 08H TEH 3

27 DNI 06H 0.00 1.27 47 P1 08H TEH 3

43 HAI TSH -0.39 0.32 98 0.75 0.34 61 6

TSH TSH 3

45 DNI 03H -0.05 1.80 21 P1 08H TEH 3

46 SCI TSH -0.02 0.22 98 0.75 0.24 115 P2 TSH TSH 3

59 DSI 02H -0.03 0.66 154 P1 08H TEH 3

63 DSI 05C 0.12 0.41 126 P1 08C TEC 3

64 DSI 05C -0.10 0.48 117 P1 08C TEC 3

64 DNI 06H -0.01 1.47 55 P1 08H TEH 3

65 DSI 07C -0.02 0.50 106 P1 08C TEC 3

65 DSI 07H -0.02 0.75 76 P1 08H TEH 3

71 DNI 08H 0.00 1.11 37 P1 08H 07C 3

71 DNI 08H 0.00 2.01 31 P1 08H TEH Page 1 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 3

77 SAI 08H 0.00 0.39 32 0.25 0.17 128 2

08H 08C 3

77 DSI 08H -0.01 0.37 43 P1 08H TEH 3

79 DSI 07H -0.15 0.32 121 P1 08H TEH 3

81 DNI 08C 0.00 1.54 43 P1 08C TEC 3

81 DNI 07H 0.01 1.65 51 P1 08H TEH 3

81 DSI 03H 0.02 0.58 122 P1 08H TEH 3

84 DSI 03H 0.00 0.48 77 P1 08H TEH 3

85 DSI 04H 0.05 0.59 57 P1 08H TEH 3

88 DNI 07H -0.02 1.33 44 P1 08H TEH 3

91 DNI 04H 0.04 1.26 47 P1 08H TEH 3

92 DSI 02H 0.10 0.44 142 P1 08H TEH 4

9 DNI 06C 0.00 1.48 39 P1 08C TEC 4

9 DNI 07C 0.05 1.79 44 P1 08C TEC 4

9 DNI 06H 0.01 1.42 55 P1 08H TEH 4

9 DNI 08H 0.00 1.51 43 P1 08H TEH 4

9 DSI 03H 0.02 0.40 88 P1 08H TEH 4

9 DSI 04H 0.05 0.31 65 P1 08H TEH 4

18 DSI 05H -0.12 0.25 136 P1 08H TEH 4

21 DSI 03H 0.00 0.44 88 P1 08H TEH 4

22 DNI 07H 0.01 1.48 41 P1 08H TEH 4

24 DSI 02H -0.02 0.26 89 P1 08H TEH 4

26 SCI TSH -0.09 0.23 68 0.52 0.08 112 P2 TSH TSH 4

26 DNI 08C -0.05 1.11 42 P1 08C TEC 4

26 DSI 02H 0.01 0.30 109 P1 08H TEH 4

26 DNI 03H 0.18 1.52 28 P1 08H TEH 4

28 DSI 03H 0.04 0.59 82 P1 08H TEH 4

30 HCI TSH 0.02 0.34 17 0.13 0.67 67 P2 TSH TSH 4

30 DSI 04H -0.05 0.22 106 P1 08H TEH 4

33 DNI 07H 0.00 1.26 55 P1 08H TEH 4

34 SCI TSH -0.10 0.17 89 0.68 0.07 102 P2 TSH TSH 4

34 DSI 03H 0.19 0.26 109 P1 08H TEH 4

34 DNI 07H 0.00 1.28 51 P1 08H TEH 4

34 DNI 08H 0.03 1.46 44 P1 08H TEH 4

39 DSI 02H 0.00 0.11 47 P1 08H TEH 4

48 HCI TSH -0.03 0.26 49 0.38 0.53 83 P2 TSH TSH 4

50 DSI 02H 0.12 0.13 62 P1 08H TEH 4

50 DSI 04H 0.04 0.39 41 P1 08H TEH 4

50 DSI 03H 0.03 0.33 48 P1 08H TEH 4

54 DNI 08C 0.15 1.46 52 P1 08C TEC 4

54 DSI 02H -0.20 0.63 97 P1 08H TEH Page 2 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 4

54 DSI 05H 0.03 0.40 105 P1 08H TEH 4

54 DSI 04H 0.10 0.32 88 P1 08H TEH 4

60 DSI 06H 0.20 0.51 38 P1 08H TEH 4

60 DSI 02H 0.05 0.31 128 P1 08H TEH 4

62 DNI 02H 0.00 1.44 43 P1 08H TEH 4

62 DNI 03H -0.05 1.82 39 P1 08H TEH 4

62 DNI 04H 0.00 1.51 12 P1 08H TEH 4

62 DNI 05H 0.00 1.46 30 P1 08H TEH 4

63 DSI 02H 0.02 0.29 55 P1 08H TEH 4

70 DNI 05H 0.00 1.19 55 P1 08H TEH 4

70 DSI 03H 0.02 0.20 51 P1 08H TEH 4

72 DNI 08C -0.07 1.62 40 P1 08C TEC 4

72 DNI 08H 0.03 1.44 54 P1 08H TEH 4

74 SCI TSH 0.00 0.15 165 1.26 0.06 84 P2 TSH TSH 4

78 DSI 05H 0.00 0.26 132 P1 08H TEH 4

80 DSI 08C 0.00 0.23 27 P1 08C TEC 4

83 PSI 03H 0.24 13.73 150 P5 08H TEH 4

85 DSI 08C 0.02 0.11 112 P1 08C TEC 4

86 DSI 03H 0.05 0.26 113 P1 08H TEH 5

4 DNI 07H 0.00 1.31 50 P1 TEH TEC 5

10 DSI 02H 0.00 0.84 85 P1 TEH TEC 5

10 DSI 04H 0.00 0.36 103 P1 TEH TEC 5

10 DSI 03H 0.00 0.51 116 P1 TEH TEC 5

11 DSI 04H 0.12 0.33 66 P1 TEH TEC 5

12 DNI 08H 0.00 1.76 41 P1 TEH TEC 5

12 DNI 08C 0.00 1.69 42 P1 TEH TEC 5

13 DNI 06H -0.02 1.85 19 P1 STH TEC 5

18 SAI 06H -0.16 0.37 51 0.39 0.16 101 6

06H 06H 5

18 DNI 08C 0.00 1.29 44 P1 TEH TEC 5

18 DSI 06H 0.00 0.55 35 P1 TEH TEC 5

18 DNI 08H -0.05 1.51 40 P1 TEH TEC 5

20 SCI TSH -0.08 0.29 109 0.83 0.07 75 P2 TSH TSH 5

20 DSI 08C 0.00 0.22 117 P1 08C TEC 5

23 HCI TSH 0.00 0.26 212 1.62 0.58 128 P2 TSH TSH 5

23 DSI 02H -0.02 0.27 92 P1 TEC TEH 5

24 DSI 07H -0.05 0.22 100 P1 TEH TEC 5

25 DNI 06C 0.00 1.74 29 P1 08C TEC 5

25 DNI 06H 0.00 1.88 42 P1 08H TEH 5

25 DSI 05H 0.10 0.54 112 P1 08H TEH 5

25 DNI 08H 0.00 1.41 48 P1 08H TEH Page 3 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 5

26 DSI 02H 0.05 0.61 122 P1 08H TEH 5

26 DSI 03H 0.02 0.65 109 P1 08H TEH 5

26 DNI 07H 0.05 1.36 53 P1 08H TEH 5

29 DNI 08H 0.17 1.25 39 P1 STH TEC 5

29 DNI 06C 0.00 1.66 24 P1 STH TEC 5

29 DNI 05C -0.24 1.26 17 P1 STH TEC 5

29 DNI 07C -0.27 1.44 32 P1 STH TEC 5

29 DSI 02H 0.02 1.37 104 P1 STH TEC 5

29 SAI 02H -0.12 0.32 83 0.63 0.20 106 2

02H 02H 5

29 SAI 02H -0.13 0.34 52 0.4 0.25 108 2

02H 02H 5

30 DSI 03H 0.02 0.14 35 P1 08H TEH 5

31 DNI 07C 0.05 1.29 52 P1 TEH TEC 5

37 HCI TSH 0.00 0.20 249 1.9 0.36 69 P2 TSH TSH 5

53 DNI 07H 0.00 1.54 43 P1 TEH TEC 5

53 DSI 02H 0.05 0.12 86 P1 TEH TEC 5

53 DNI 04H 0.00 1.49 50 P1 TEH TEC 5

57 DSI 04H 0.29 0.20 151 P1 TEH TEC 5

57 SCI TSH -0.01 0.20 118 0.9 0.26 71 P2 TSH TSH 5

59 DNI 06C -0.02 1.43 30 P1 STH TEC 5

60 DSI 04H -0.02 0.13 165 P1 TEH TEC 5

61 PSI 07H -0.61 7.74 255 8

TEH TEC 5

71 DNI 08H 0.00 1.70 46 P1 TEH TEC 5

71 DNI 07C 0.00 1.41 46 P1 TEH TEC 5

71 DNI 06C 0.00 1.31 48 P1 TEH TEC 5

79 DNI 07C 0.00 1.25 45 P1 TEH TEC 5

80 DSI 05H 0.07 0.28 92 P1 TEH TEC 5

82 DSI 03H 0.02 0.32 149 P1 TEH TEC 6

6 DNI 08H -0.08 1.30 41 P1 TEH TEC 6

11 DNI 06H 0.00 1.32 47 P1 TEH TEC 6

12 DNI 08C 0.00 1.25 39 P1 TEH TEC 6

12 DNI 07H 0.00 1.38 48 P1 TEH TEC 6

14 DNI 06H 0.00 1.30 50 P1 TEH TEC 6

14 DNI 05H 0.00 1.20 55 P1 TEH TEC 6

15 DNI 08H -0.05 1.30 45 P1 STH TEC 6

15 DSI 02H 0.02 0.58 137 P1 STH TEC 6

16 DNI 03H -0.07 1.13 24 P1 TEH TEC 6

17 DNI 08H 0.00 1.23 52 P1 TEH TEC 6

17 DNI 07H -0.05 1.26 47 P1 TEH TEC 6

20 DSI 04H 0.00 0.44 85 P1 TEH TEC 6

20 DNI 08H 0.00 1.47 49 P1 TEH TEC Page 4 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 6

22 SCI TSH -0.10 0.16 63 0.48 0.13 128 P2 TSH TSH 6

23 SCI TSH -0.11 0.18 177 1.35 0.13 49 P2 TSH TSH 6

27 DNI 07H 0.00 2.22 34 P1 TEH TEC 6

27 DSI 06H 0.00 0.18 79 P1 TEH TEC 6

27 DNI 05C 0.00 1.61 33 P1 TEH TEC 6

27 DNI 07C 0.00 1.34 44 P1 TEH TEC 6

30 DNI 06C 0.00 1.27 31 P1 TEH TEC 6

32 DSI 02H -0.02 0.21 156 P1 STH TEC 6

33 DNI 08H 0.00 1.27 29 P1 STH TEC 6

34 DSI 02H 0.05 0.51 165 P1 TEH TEC 6

34 DNI 08H 0.00 1.49 49 P1 TEH TEC 6

35 DSI 08H 0.00 0.14 101 P1 STH TEC 6

35 DSI 05H -0.07 0.36 95 P1 STH TEC 6

35 DSI 04H 0.05 0.46 82 P1 STH TEC 6

35 DNI 07C 0.00 1.36 41 P1 STH TEC 6

35 DSI 03H 0.00 0.79 95 P1 STH TEC 6

35 DSI 02H -0.17 1.36 103 P1 STH TEC 6

35 SAI 02H -0.15 0.08 22 0.16 0.12 117 2

02H 02H 6

36 DNI 07H 0.00 1.25 55 P1 TEH TEC 6

36 DNI 08H 0.00 1.45 50 P1 TEH TEC 6

37 DNI 04C 0.00 1.58 30 P1 TEH TEC 6

40 DNI 07C 0.00 1.70 40 P1 TEH TEC 6

40 DSI 04H 0.02 0.24 153 P1 TEH TEC 6

40 DNI 05C 0.00 1.38 36 P1 TEH TEC 6

40 DNI 02C 0.00 1.41 30 P1 TEH TEC 6

40 DSI 03H -0.05 0.24 148 P1 TEH TEC 6

41 DSI 08H 0.00 0.22 152 P1 STH TEC 6

41 SAI 08H -0.02 0.39 52 0.4 0.14 104 2

08H 08H 6

41 SAI 08H -0.05 0.29 31 0.23 0.13 120 2

08C 08H 6

43 DNI 06H 0.00 1.32 52 P1 TEH TEC 6

43 DSI 02H 0.00 0.33 97 P1 TEH TEC 6

43 DNI 05H 0.00 1.28 55 P1 TEH TEC 6

57 SCI TSH -0.01 0.13 62 0.47 0.09 107 P2 TSH TSH 6

63 DNI 02C 0.00 1.28 14 P1 TEH TEC 6

63 DNI 08H 0.00 1.44 48 P1 TEH TEC 6

68 DNI 07H 0.00 1.64 52 P1 TEH TEC 6

68 DSI 03H 0.02 0.93 139 P1 TEH TEC 6

68 DNI 08C -0.02 1.05 55 P1 TEH TEC 6

68 SAI 03H 0.00 0.24 38 0.29 0.12 57 6

03H 03H 7

4 DSI 04H 0.12 0.23 75 P1 TEH TEC Page 5 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 7

4 SAI 04H 0.00 0.32 45 0.34 0.08 86 P4 04H 04H 7

6 DNI 04C -0.10 1.07 35 P1 TEH TEC 7

6 DNI 05H 0.02 1.37 11 P1 TEH TEC 7

6 DNI 04H -0.02 1.77 53 P1 TEH TEC 7

14 DSI 03H 0.12 0.15 99 P1 TEH TEC 7

18 DSI 03H 0.02 0.63 109 P1 TEH TEC 7

18 DNI 06C 0.00 1.35 41 P1 TEH TEC 7

18 DSI 02H -0.02 0.90 101 P1 TEH TEC 7

18 DSI 05H -0.05 0.41 139 P1 TEH TEC 7

19 SCI TSH -0.17 0.11 31 0.23 0.10 91 P2 TSH TSH 7

19 DSI 02H 0.02 0.45 119 P1 TEH TEC 7

19 DSI 03H -0.05 1.12 83 P1 TEH TEC 7

27 DSI 05H 0.10 0.47 161 P1 TEH TEC 7

28 SCI TSH -0.06 0.21 75 0.58 0.12 118 P2 TSH TSH 7

31 DNI 03C 0.15 1.74 14 P1 TEH TEC 7

31 DNI 05C 0.00 1.57 14 P1 TEH TEC 7

31 DNI 07H 0.00 1.65 41 P1 TEH TEC 7

31 DNI 07C -0.19 1.39 28 P1 TEH TEC 7

31 DNI 05H 0.00 1.04 25 P1 TEH TEC 7

31 DNI 03H 0.00 1.49 11 P1 TEH TEC 7

41 DNI 04H 0.00 1.56 12 P1 TEH TEC 7

47 DNI 04H 0.00 1.37 10 P1 STH TEC 7

49 DNI 02C 0.00 1.52 15 P1 TEH TEC 7

49 DNI 08C 0.12 2.28 14 P1 TEH TEC 7

49 DNI 07H 0.00 1.37 44 P1 TEH TEC 7

49 DSI 02H -0.02 0.15 138 P1 TEH TEC 7

49 DNI 05H 0.02 1.30 26 P1 TEH TEC 7

51 DSI 05H -0.07 0.39 127 P1 STH TEC 7

51 DSI 02H -0.02 0.25 31 P1 STH TEC 7

52 SCI TSH -0.09 0.16 128 0.98 0.10 105 P2 TSH TSH 7

57 DNI 05H -0.02 1.79 31 P1 STH TEC 7

57 DNI 04H 0.00 1.52 26 P1 STH TEC 7

57 DNI 07H 0.20 1.62 24 P1 STH TEC 7

60 DNI 03H 0.00 1.32 22 P1 STH TEC 7

63 DNI 08H 0.02 1.18 49 P1 TEH TEC 7

72 DNI 06H 0.22 1.26 48 P1 TEH TEC 7

72 DNI 04H 0.00 1.35 53 P1 TEH TEC 7

75 DSI 08H -0.15 0.98 98 P1 STH TEC 7

75 SAI 08H -0.15 0.13 29 0.22 0.10 62 2

08C 08H 7

83 DNI 08H 0.02 1.37 51 P1 TEH TEC Page 6 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 7

83 DNI 07C 0.00 1.34 51 P1 TEH TEC 7

85 SCI TSH -0.12 0.15 63 0.48 0.09 142 P2 TSH TSH 7

86 DNI 08C -0.17 1.33 38 P1 TEH TEC 7

94 DSI 02H -0.10 0.23 149 P1 TEH TEC 8

14 DNI 07C -0.17 1.27 12 P1 STH TEC 8

16 DSI 05H -0.05 0.19 111 P1 STH TEC 8

18 SCI TSH -0.06 0.19 49 0.38 0.11 74 P2 TSH TSH 8

19 DSI 02H -0.02 0.45 127 P1 TEH TEC 8

25 MCI TSH -0.06 0.31 351 2.68 0.50 104 P2 TSH TSH 8

25 DSI 02H -0.17 1.37 115 P1 TEC TEH 8

25 MAI 02H -0.19 0.36 145 1.1 0.35 90 6

02H 02H 8

27 SCI TSH -0.11 0.13 40 0.31 0.11 101 P2 TSH TSH 8

28 DSI 02H 0.00 0.24 80 P1 STH TEC 8

28 DNI 07H -0.07 1.39 51 P1 STH TEC 8

28 DNI 08H -0.10 1.51 38 P1 STH TEC 8

29 DSI 02H 0.00 0.27 151 P1 STH TEC 8

32 DNI 07H 0.00 1.44 22 P1 TEH TEC 8

32 DNI 08H 0.00 1.81 31 P1 TEH TEC 8

32 DSI 05H 0.05 0.50 30 P1 TEH TEC 8

32 DSI 03H -0.07 0.42 87 P1 TEH TEC 8

34 DSI 03H -0.10 0.43 47 P1 TEH TEC 8

35 DSI 05H 0.03 0.14 99 P1 STH TEC 8

35 DSI 04H -0.05 0.17 133 P1 STH TEC 8

35 SAI 05H -0.05 0.17 62 0.47 0.11 61 2

04H 05H 8

35 SAI 04H 0.05 0.17 49 0.38 0.07 80 2

04H 05H 8

40 DNI 03C 0.00 1.33 15 P1 STH TEC 8

40 DNI 05C 0.00 1.40 33 P1 STH TEC 8

42 DNI 08H 0.05 1.48 39 P1 STH TEC 8

42 DSI 02H -0.02 0.17 135 P1 STH TEC 8

56 DNI 08H 0.00 1.40 43 P1 STH TEC 8

59 DNI 08H 0.00 1.30 54 P1 TEH TEC 8

65 DNI 07H 0.00 1.47 55 P1 TEH TEC 8

65 DSI 03H 0.00 0.37 150 P1 TEH TEC 8

65 DNI 07C 0.00 1.44 45 P1 TEH TEC 8

65 DNI 08H 0.00 1.38 49 P1 TEH TEC 8

66 DNI 08H -0.08 1.50 46 P1 TEH TEC 8

66 DNI 06H 0.07 1.33 48 P1 TEH TEC 8

67 DSI 02H 0.02 0.11 137 P1 TEH TEC 8

69 DSI 02H -0.02 0.25 148 P1 TEH TEC 8

74 DNI 08H 0.00 1.26 45 P1 TEH TEC Page 7 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 8

74 DNI 03H 0.00 1.31 55 P1 TEH TEC 8

74 DNI 07H 0.00 1.22 51 P1 TEH TEC 8

76 DSI 05H 0.00 0.16 114 P1 TEH TEC 8

77 DSI 08H 0.02 0.09 69 P1 TEH TEC 8

77 SAI 08H -0.05 0.38 42 0.32 0.10 113 2

08H 08C 8

79 DNI 08H -0.02 1.28 40 P1 TEH TEC 8

85 DSI 02H 0.07 0.07 159 P1 TEH TEC 8

89 DSI 05H 0.00 0.25 77 P1 TEH TEC 8

91 DSI 04H 0.00 0.32 111 P1 TEH TEC 8

93 DSI 03H 0.10 0.48 99 P1 TEH TEC 9

7 DSI 02H 0.02 0.25 127 P1 TEH TEC 9

7 DNI 08H 0.02 1.32 43 P1 TEH TEC 9

7 SAI 02H 0.00 0.26 37 0.28 0.08 96 P4 02H 02H 9

10 DSI 02H -0.07 1.12 110 P1 TEH TEC 9

13 DNI 08H 0.02 1.29 48 P1 TEH TEC 9

13 DSI 02H -0.05 0.27 132 P1 TEH TEC 9

14 DSI 03H 0.00 0.14 109 P1 TEH TEC 9

16 DSI 03H 0.02 0.56 53 P1 TEH TEC 9

16 DSI 02H 0.00 0.39 153 P1 TEH TEC 9

16 DSI 04H 0.00 0.55 145 P1 TEH TEC 9

18 DSI 05H -0.02 0.31 126 P1 TEH TEC 9

25 DNI 05C -0.02 1.28 41 P1 TEH TEC 9

27 DNI 03H 0.00 1.53 54 P1 TEH TEC 9

28 DNI 08C 0.00 1.50 42 P1 TEH TEC 9

28 DSI 02H -0.02 0.78 163 P1 TEH TEC 9

28 DNI 07H 0.00 1.37 55 P1 TEH TEC 9

28 DNI 07C 0.00 1.29 44 P1 TEH TEC 9

28 SAI 02H 0.01 0.13 18 0.14 0.11 115 6

02H 02H 9

29 DNI 06H 0.00 1.54 49 P1 TEH TEC 9

31 DNI 06H 0.22 1.32 23 P1 STH TEC 9

31 DSI 02H 0.02 0.43 33 P1 STH TEC 9

33 DNI 08H 0.00 1.31 22 P1 TEH TEC 9

34 DSI 02H 0.07 0.40 143 P1 STH TEC 9

34 DNI 06C 0.00 1.34 34 P1 STH TEC 9

34 SAI 02H -0.26 0.10 77 0.59 0.18 134 2

02H 02H 9

35 DNI 08H 0.00 1.26 55 P1 STH TEC 9

35 DNI 08C 0.00 1.28 44 P1 STH TEC 9

35 DNI 06C 0.15 1.31 21 P1 STH TEC 9

35 DSI 02H -0.02 0.47 148 P1 STH TEC 9

37 DNI 06H 0.00 1.67 37 P1 TEH TEC Page 8 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 9

37 DNI 05H 0.00 1.37 23 P1 TEH TEC 9

37 DNI 04H 0.00 1.74 31 P1 TEH TEC 9

37 DNI 08H 0.00 1.99 26 P1 TEH TEC 9

37 DNI 07H -0.20 1.71 15 P1 TEH TEC 9

37 DNI 02C 0.00 1.63 9

P1 TEH TEC 9

37 DNI 05C -0.15 1.26 20 P1 TEH TEC 9

38 DSI 05H 0.05 0.42 169 P1 TEH TEC 9

38 DNI 08C 0.00 1.21 19 P1 TEH TEC 9

40 DNI 08H 0.00 1.29 46 P1 STH TEC 9

40 DNI 07H 0.02 1.48 47 P1 STH TEC 9

40 DSI 05H 0.00 0.25 111 P1 STH TEC 9

40 DSI 03H -0.02 0.53 132 P1 STH TEC 9

42 DNI 04H -0.12 1.16 38 P1 TEH TEC 9

42 PCT TSC -0.03 31 0.23 51 0.39 0.34 58 6

TSC TSC 9

42 VOL TSC 0.00 0.35 58 6

TSC TSC 9

49 DNI 05C 0.00 1.09 39 P1 TEH TEC 9

49 DNI 08H 0.00 1.69 40 P1 TEH TEC 9

51 DSI 04H -0.17 0.52 105 P1 STH TEC 9

51 SAI 04H -0.08 0.22 63 0.48 0.13 96 2

04H 04H 9

56 DNI 07C 0.00 1.07 46 P1 TEH TEC 9

56 DNI 08C 0.00 1.21 55 P1 TEH TEC 9

56 DNI 08H 0.00 1.27 48 P1 TEH TEC 9

56 DSI 02H -0.07 0.18 110 P1 TEH TEC 9

56 DNI 06H 0.00 1.29 50 P1 TEH TEC 9

56 DSI 04H 0.05 0.23 86 P1 TEH TEC 9

57 DSI 03H -0.15 0.43 112 P1 TEH TEC 9

57 DSI 02H 0.02 0.39 160 P1 TEH TEC 9

57 DNI 04H 0.00 1.15 47 P1 TEH TEC 9

59 DNI 07H 0.00 1.45 53 P1 STH TEC 9

62 DNI 05H 0.20 1.37 50 P1 TEH TEC 9

62 DNI 08H 0.00 1.50 49 P1 TEH TEC 9

65 DNI 04C -0.02 1.28 26 P1 TEH TEC 9

65 DNI 07C 0.00 1.35 47 P1 TEH TEC 9

67 SCI TSH -0.09 0.18 135 1.03 0.14 61 P2 TSH TSH 9

74 DSI 03H -0.02 0.20 158 P1 TEH TEC 9

79 PCT AV1 0.00 14 0.25 0

P4 08C 08H 9

83 PSI 04H 0.07 8.17 76 8

TEH TEC 9

86 DNI 05C 0.20 1.29 23 P1 TEH TEC 9

93 DNI 02C 0.02 1.33 12 P1 TEH TEC 10 4

DNI 08H 0.00 1.32 48 P1 TEH TEC Page 9 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 10 4

DNI 06H 0.00 1.49 55 P1 TEH TEC 10 7

DSI 02H -0.07 0.37 67 P1 TEH TEC 10 7

DNI 06H 0.00 1.53 52 P1 TEH TEC 10 7

DSI 03H -0.02 0.29 126 P1 TEH TEC 10 8

DSI 03H -0.02 0.49 73 P1 TEH TEC 10 10 DNI 07H 0.03 1.53 50 P1 TEH TEC 10 12 DNI 07H 0.00 1.49 22 P1 TEH TEC 10 12 DNI 06H 0.00 1.33 24 P1 TEH TEC 10 12 DNI 08H 0.00 1.38 22 P1 TEH TEC 10 15 DNI 07H 0.02 1.44 54 P1 TEH TEC 10 16 DNI 07H 0.23 1.32 35 P1 STH TEC 10 18 DNI 06H 0.05 1.20 41 P1 TEH TEC 10 19 DSI 04H 0.00 0.32 108 P1 TEH TEC 10 29 SCI TSH -0.12 0.19 97 0.74 0.17 134 P2 TSH TSH 10 29 DNI 07H 0.00 1.70 18 P1 TEH TEC 10 32 DNI 08C 0.00 1.87 17 P1 STH TEC 10 32 DNI 05H 0.00 1.41 22 P1 STH TEC 10 34 DSI 04H 0.02 1.00 23 P1 STH TEC 10 34 SAI 04H 0.12 0.19 29 0.22 0.11 78 2

04H 04H 10 37 DSI 03H 0.00 0.09 121 P1 TEH TEC 10 37 DNI 05C 0.00 1.27 31 P1 TEH TEC 10 38 DSI 04H 0.00 0.15 41 P1 STH TEC 10 47 DNI 07C 0.00 1.32 26 P1 TEH TEC 10 47 DNI 07H -0.20 1.37 22 P1 TEH TEC 10 47 DNI 06H 0.00 1.59 27 P1 TEH TEC 10 47 DNI 05H 0.00 1.40 39 P1 TEH TEC 10 47 DNI 04H 0.00 1.35 49 P1 TEH TEC 10 49 DNI 08H 0.00 1.32 55 P1 STH TEC 10 49 DNI 08C -0.02 1.48 40 P1 STH TEC 10 49 DNI 07C -0.02 1.58 43 P1 STH TEC 10 57 DNI 05H 0.00 1.78 27 P1 TEH TEC 10 57 DNI 07H 0.00 1.83 36 P1 TEH TEC 10 57 DNI 08H 0.00 1.28 29 P1 TEH TEC 10 57 DNI 06H 0.00 1.23 29 P1 TEH TEC 10 57 DNI 04H 0.00 1.53 36 P1 TEH TEC 10 57 DNI 03H 0.00 1.33 34 P1 TEH TEC 10 57 DNI 02H 0.00 1.62 20 P1 TEH TEC 10 58 DSI 04H -0.05 0.08 66 P1 TEH TEC 10 58 DNI 08H -0.03 1.30 52 P1 TEH TEC 10 58 DNI 07C 0.00 1.94 19 P1 TEH TEC Page 10 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 10 64 DNI 02H 0.05 1.78 8

P1 TEH TEC 10 64 DNI 05C -0.02 1.30 20 P1 TEH TEC 10 64 DNI 04H -0.27 2.20 12 P1 TEH TEC 10 69 DNI 07C -0.17 1.62 9

P1 STH TEC 10 69 DNI 04H 0.07 2.54 8

P1 STH TEC 10 69 DNI 06C -0.15 1.42 9

P1 STH TEC 10 71 DNI 08C 0.00 1.31 18 P1 TEH TEC 10 72 DNI 07H 0.00 1.27 13 P1 TEH TEC 10 72 DNI 07C 0.00 1.36 21 P1 TEH TEC 10 75 DNI 08H 0.00 1.37 30 P1 TEH TEC 10 76 DNI 07C -0.24 1.25 24 P1 TEH TEC 10 76 DSI 05H 0.05 0.35 112 P1 TEH TEC 10 80 DSI 08C 0.12 0.25 125 P1 TEH TEC 10 80 SAI 08C 0.09 0.33 37 0.28 0.11 99 2

08H 08C 10 83 DNI 04C -0.15 1.63 17 P1 TEH TEC 10 86 DNI 08C 0.00 1.40 45 P1 TEH TEC 10 89 DNI 06H 0.00 2.02 28 P1 TEH TEC 10 89 DNI 05H 0.00 1.29 21 P1 TEH TEC 10 89 DNI 07H -0.02 1.35 45 P1 TEH TEC 10 89 DNI 08C 0.00 1.04 52 P1 TEH TEC 10 89 DNI 07C -0.02 1.09 49 P1 TEH TEC 11 2

DSI 03H 0.05 0.56 117 P1 TEH TEC 11 3

DNI 05H 0.00 1.66 52 P1 TEH TEC 11 3

DNI 04H 0.00 2.14 47 P1 TEH TEC 11 3

DNI 07H 0.00 1.50 52 P1 TEH TEC 11 5

DNI 07H 0.00 1.25 55 P1 TEH TEC 11 5

DNI 05H 0.00 1.70 49 P1 TEH TEC 11 5

DNI 04H 0.00 1.86 49 P1 TEH TEC 11 8

DNI 08C -0.15 1.31 31 P1 TEH TEC 11 9

DSI 02H 0.16 0.98 159 P1 TEH TEC 11 9

SAI 02H 0.16 0.19 31 0.23 0.06 101 P4 02H 03H 11 12 DNI 02C 0.02 1.49 18 P1 STH TEC 11 12 DNI 05C -0.10 1.47 20 P1 STH TEC 11 12 DNI 05H 0.20 1.90 42 P1 STH TEC 11 12 DNI 07H 0.23 1.49 50 P1 STH TEC 11 12 DNI 08H 0.22 1.85 39 P1 STH TEC 11 14 HCI TSH 0.00 0.23 148 1.13 0.40 82 P2 TSH TSH 11 20 DNI 06H 0.00 1.45 53 P1 TEH TEC 11 20 DNI 07H 0.00 1.32 53 P1 TEH TEC 11 20 DNI 08C 0.00 1.42 46 P1 TEH TEC Page 11 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 11 20 DNI 07C 0.00 1.19 50 P1 TEH TEC 11 23 SCI TSH 0.05 0.13 48 0.36 0.12 47 P2 TSH TSH 11 29 DNI 06H 0.00 1.15 15 P1 TEH TEC 11 29 DNI 08C 0.00 1.25 29 P1 TEH TEC 11 36 HCI TSH 0.00 0.23 154 1.17 0.28 103 P2 TSH TSH 11 48 DNI 02C 0.00 1.24 21 P1 STH TEC 11 48 DSI 08H 0.05 0.59 52 P1 STH TEC 11 48 DSI 02H 0.07 0.75 69 P1 STH TEC 11 48 DNI 05C 0.17 1.82 17 P1 STH TEC 11 48 DNI 04C 0.00 1.93 28 P1 STH TEC 11 48 DNI 03C 0.02 1.52 18 P1 STH TEC 11 48 DNI 07H 0.00 2.30 39 P1 STH TEC 11 48 DNI 06H 0.00 2.07 41 P1 STH TEC 11 53 SCI TSH -0.05 0.21 114 0.87 0.12 98 P2 TSH TSH 11 57 SCI TSH -0.04 0.16 65 0.49 0.14 120 P2 TSH TSH 11 74 DNI 07H 0.00 1.40 55 P1 TEH TEC 11 75 DNI 02C 0.00 1.00 17 P1 TEH TEC 11 76 PSI 03C -0.07 16.55 170 P5 TEH TEC 11 77 DSI 05H 0.00 0.31 104 P1 TEH TEC 11 78 DSI 06H -0.05 0.19 23 P1 TEH TEC 11 78 DSI 05H 0.07 0.20 98 P1 TEH TEC 11 79 DNI 08H 0.20 1.29 44 P1 TEH TEC 11 80 DNI 03C -0.02 1.26 20 P1 TEH TEC 11 80 DNI 06H 0.29 1.46 14 P1 TEH TEC 12 6

DNI AV4 7.09 0.28 116 5

TEH TEC 12 7

DNI 03H 0.10 1.18 5

P1 TEH TEC 12 7

DNI 04C 0.17 1.43 9

P1 TEH TEC 12 7

DNI 06H 0.17 1.16 12 P1 TEH TEC 12 14 SCI TSH -0.05 0.08 198 1.52 0.11 56 P2 TSH TSH 12 16 SAI 02H -0.24 0.24 72 0.55 0.22 80 6

02H 03H 12 16 MCI TSH -0.12 1.29 185 1.41 0.12 78 P2 TSH TSH 12 16 DSI 02H -0.17 0.79 125 P1 TEH TEC 12 16 DNI 07H 0.05 1.47 49 P1 TEH TEC 12 19 DNI 06C -0.17 1.61 10 P1 TEH TEC 12 19 DNI 05C 0.07 1.93 19 P1 TEH TEC 12 19 DNI 07H 0.18 1.22 16 P1 TEH TEC 12 20 DNI 05H 0.00 1.48 51 P1 TEH TEC 12 23 SCI TSH -0.10 0.16 152 1.16 0.41 66 P2 TSH TSH 12 23 DNI 02C 0.27 1.64 14 P1 TEH TEC 12 26 DNI 05H 0.00 1.28 8

P1 TEH TEC Page 12 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 12 27 DNI 05H 0.17 1.46 16 P1 TEH TEC 12 28 SCI TSH -0.07 0.21 52 0.4 0.09 107 P2 TSH TSH 12 29 SCI TSH -0.16 0.18 106 0.81 0.13 71 P2 TSH TSH 12 31 SCI TSH 0.01 0.13 40 0.31 0.13 80 P2 TSH TSH 12 32 DNI 08C 0.00 1.27 39 P1 TEH TEC 12 34 DSI 02H -0.15 0.40 92 P1 TEH TEC 12 34 DNI 06H 0.00 1.98 43 P1 TEH TEC 12 45 SCI TSH -0.04 0.11 54 0.41 0.10 87 P2 TSH 02H 12 48 DSI 05H 0.00 0.22 31 P1 TEH TEC 12 61 DSI 08H 0.17 0.14 80 P1 TEH TEC 12 62 DSI 07C -0.17 0.28 114 P1 TEH TEC 12 64 DNI 08C 0.00 1.40 52 P1 TEH TEC 12 64 DNI 03C 0.00 1.00 22 P1 TEH TEC 12 64 DNI 04H 0.00 1.78 54 P1 TEH TEC 12 67 DNI 08C -0.07 1.33 46 P1 TEH TEC 12 69 DNI 08C 0.00 1.41 43 P1 TEH TEC 12 69 DSI 03H -0.05 0.44 109 P1 TEH TEC 12 69 DSI 02H 0.02 0.41 99 P1 TEH TEC 12 70 DSI 03H 0.02 0.44 144 P1 TEH TEC 12 71 DNI 06C 0.02 1.83 37 P1 TEH TEC 12 71 DNI 07C 0.00 1.45 44 P1 TEH TEC 12 71 DNI 08H 0.00 1.87 38 P1 TEH TEC 12 72 DNI 08H 0.20 1.74 46 P1 TEH TEC 12 72 DNI 05H 0.02 1.80 52 P1 TEH TEC 12 72 DSI 02H 0.00 0.28 138 P1 TEH TEC 12 73 DSI 05H 0.05 0.19 148 P1 TEH TEC 12 73 DNI 07H 0.00 1.56 51 P1 TEH TEC 12 74 DNI 07H 0.05 1.33 55 P1 TEH TEC 12 74 DNI 07C 0.00 1.33 45 P1 TEH TEC 12 74 DSI 02H 0.02 0.41 156 P1 TEH TEC 12 74 DSI 03H 0.00 0.34 45 P1 TEH TEC 12 74 DSI 02H 0.24 0.57 156 P1 TEH TEC 12 74 DSI 02H 0.02 0.41 161 P1 TEH TEC 12 75 DNI 05C 0.00 1.32 43 P1 TEH TEC 12 75 DNI 02H 0.00 1.92 45 P1 TEH TEC 12 75 DNI 06H 0.00 1.36 54 P1 TEH TEC 12 75 DNI 04C 0.00 1.57 22 P1 TEH TEC 12 75 DNI 05H 0.10 1.44 33 P1 TEH TEC 12 75 DNI 04H 0.27 1.53 12 P1 TEH TEC 12 75 DNI 03H 0.00 1.59 46 P1 TEH TEC Page 13 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 12 75 DNI 06C 0.00 1.50 40 P1 TEH TEC 12 78 DNI 06C -0.10 1.33 35 P1 TEH TEC 12 80 DSI 05H 0.10 0.12 81 P1 TEH TEC 12 89 DNI 07C 0.00 1.30 45 P1 TEH TEC 13 4

DNI 07H 0.00 1.42 42 P1 TEH TEC 13 4

DNI 06H 0.07 1.35 52 P1 TEH TEC 13 4

DNI 03H 0.00 1.84 35 P1 TEH TEC 13 17 DNI 06H 0.22 1.37 11 P1 STH TEC 13 22 DNI 07H 0.00 1.94 38 P1 TEH TEC 13 22 DNI 08H -0.03 1.37 39 P1 TEH TEC 13 22 DNI 06H 0.00 1.57 48 P1 TEH TEC 13 22 DNI 08C 0.00 1.58 14 P1 TEH TEC 13 23 SCI TSH -0.11 0.16 111 0.85 0.11 116 P2 TSH TSH 13 26 DNI 08H 0.00 1.44 11 P1 TEH TEC 13 29 DNI 05H 0.00 1.42 38 P1 TEH TEC 13 29 DNI 06H 0.00 1.47 37 P1 TEH TEC 13 30 SCI TSH -0.02 0.26 35 0.27 0.10 89 P2 TSH TSH 13 32 DSI 02H 0.00 0.06 126 P1 TEH TEC 13 39 DNI 08H 0.00 1.50 35 P1 TEH TEC 13 41 DNI 07C 0.00 1.37 23 P1 TEH TEC 13 41 DNI 08H 0.00 1.39 17 P1 TEH TEC 13 41 DNI 07H 0.00 1.67 22 P1 TEH TEC 13 41 DNI 03H 0.00 1.28 22 P1 TEH TEC 13 45 DNI 07C 0.02 1.27 34 P1 TEH TEC 13 46 DNI 08C 0.00 1.39 17 P1 TEH TEC 13 46 DNI 06H 0.05 1.19 51 P1 TEH TEC 13 46 DNI 08H 0.00 1.55 25 P1 TEH TEC 13 47 DNI 04C 0.00 1.61 17 P1 TEH TEC 13 47 DNI 07C 0.00 1.38 41 P1 TEH TEC 13 49 DSI 04H 0.07 0.05 102 P1 TEH TEC 13 57 DNI 07H 0.05 1.56 43 P1 TEH TEC 13 60 DSI 02H 0.10 0.32 170 P1 TEH TEC 13 61 DSI 05C 0.00 0.22 52 P1 TEH TEC 13 65 DSI 06C 0.07 0.18 97 P1 TEH TEC 13 66 DNI 05C 0.00 1.21 20 P1 TEH TEC 13 67 DSI 06C 0.00 0.30 83 P1 TEH TEC 13 67 DNI 08H 0.00 1.48 50 P1 TEH TEC 13 67 DNI 05C -0.02 1.32 39 P1 TEH TEC 13 70 DNI 08H 0.00 1.48 35 P1 TEH TEC 13 71 DSI 04H 0.00 0.21 18 P1 TEH TEC Page 14 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 13 73 DNI 08H 0.00 1.28 41 P1 TEH TEC 13 74 DNI 08H 0.17 1.45 21 P1 STH TEC 13 80 DNI 07C 0.00 1.77 38 P1 TEH TEC 13 80 DNI 05C 0.00 1.26 43 P1 TEH TEC 13 80 DNI 08H 0.02 1.44 53 P1 TEH TEC 13 80 DNI 06C 0.12 2.10 29 P1 TEH TEC 13 80 DNI 02C -0.17 1.49 14 P1 TEH TEC 13 80 DSI 03H 0.02 0.38 93 P1 TEH TEC 13 83 DNI 07H 0.00 1.83 50 P1 TEH TEC 13 83 DNI 06H 0.00 1.70 54 P1 TEH TEC 13 84 DNI 02C 0.24 1.77 11 P1 TEH TEC 13 84 DSI 02H 0.00 0.37 73 P1 TEH TEC 13 85 DNI 08C 0.00 1.37 42 P1 TEH TEC 13 85 DSI 02H 0.02 0.14 95 P1 TEH TEC 13 85 DNI 05C -0.02 1.50 33 P1 TEH TEC 13 85 DNI 03C -0.05 1.23 24 P1 TEH TEC 13 85 DNI 07C -0.02 1.62 37 P1 TEH TEC 13 86 DNI 05C 0.00 1.94 30 P1 TEH TEC 13 86 DNI 08C 0.00 1.26 55 P1 TEH TEC 13 86 DNI 08H 0.00 1.82 48 P1 TEH TEC 13 86 DNI 07H 0.00 1.75 52 P1 TEH TEC 13 86 DSI 03H 0.00 0.21 126 P1 TEH TEC 13 87 DNI 05C 0.00 1.75 31 P1 TEH TEC 13 87 DNI 06C 0.00 1.90 31 P1 TEH TEC 13 87 DNI 07C 0.00 1.83 36 P1 TEH TEC 13 87 DNI 08C 0.00 1.78 38 P1 TEH TEC 13 87 DNI 03C 0.15 1.17 16 P1 TEH TEC 13 91 DSI 05H 0.05 0.48 121 P1 TEH TEC 13 91 DSI 05C -0.02 0.22 91 P1 TEH TEC 13 92 DSI 04H 0.00 0.48 113 P1 TEH TEC 14 6

DNI 03H 0.15 2.32 12 P1 TEH TEC 14 10 SCI TSH -0.01 0.15 58 0.45 0.09 129 P2 TSH TSH 14 15 DSI 04H 0.27 0.24 128 P1 TEH TEC 14 15 DNI 03H 0.02 1.69 15 P1 TEH TEC 14 20 DSI 03H 0.00 0.21 46 P1 TEH TEC 14 20 DNI 08C 0.00 1.40 30 P1 TEH TEC 14 20 DNI 05H 0.27 1.51 19 P1 TEH TEC 14 20 DNI 06H 0.00 1.44 42 P1 TEH TEC 14 20 DNI 08H 0.00 1.32 33 P1 TEH TEC 14 20 DNI 04C 0.00 2.00 12 P1 TEH TEC Page 15 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 14 21 DNI 07H 0.03 1.39 37 P1 TEH TEC 14 24 DNI 07H 0.00 1.47 41 P1 TEH TEC 14 24 DNI 06H 0.00 1.41 50 P1 TEH TEC 14 24 DNI 05H 0.00 1.29 55 P1 TEH TEC 14 25 DSI 05H 0.07 0.31 122 P1 TEH TEC 14 27 DSI 05H 0.05 0.42 170 P1 TEH TEC 14 31 DSI 02H 0.02 0.11 10 P1 TEH TEC 14 31 DSI 05H 0.00 0.16 155 P1 TEH TEC 14 37 DNI 08C 0.00 1.06 25 P1 TEH TEC 14 37 DNI 08H 0.00 1.53 14 P1 TEH TEC 14 37 DNI 07C 0.00 1.47 17 P1 TEH TEC 14 38 DNI 03H 0.20 1.28 11 P1 STH TEC 14 39 DNI 06H 0.00 1.39 48 P1 TEH TEC 14 40 SAI 05H 0.00 0.19 43 0.33 0.13 74 6

05H 05H 14 40 DSI 05H 0.00 0.14 49 P1 TEH TEC 14 41 DNI 05H 0.00 1.31 39 P1 TEH TEC 14 43 DNI 06H 0.00 1.34 29 P1 TEH TEC 14 44 DNI 04C 0.32 1.25 10 P1 TEH TEC 14 46 DNI 06C -0.02 1.28 10 P1 TEH TEC 14 46 DSI 02H -0.02 0.16 131 P1 TEH TEC 14 46 DNI 08C -0.05 1.26 10 P1 TEH TEC 14 47 DSI 02H 0.02 0.16 81 P1 TEH TEC 14 47 DSI 04H 0.00 0.17 75 P1 TEH TEC 14 48 DSI 05H -0.02 0.40 151 P1 TEH TEC 14 48 DNI 08H 0.00 1.36 52 P1 TEH TEC 14 49 DNI 07C 0.00 1.30 45 P1 TEH TEC 14 49 DNI 05C 0.00 1.52 38 P1 TEH TEC 14 49 DNI 06C 0.00 1.34 43 P1 TEH TEC 14 49 DNI 08C 0.00 1.37 42 P1 TEH TEC 14 49 DNI 08H 0.00 1.38 49 P1 TEH TEC 14 50 DNI 03C -0.37 1.80 10 P1 TEH TEC 14 50 DNI 07C 0.00 1.25 43 P1 TEH TEC 14 50 DSI 03H 0.02 0.16 132 P1 TEH TEC 14 50 DNI 08H -0.05 1.43 49 P1 TEH TEC 14 53 DSI 02H -0.05 0.08 96 P1 TEH TEC 14 54 DNI 08H 0.02 1.37 48 P1 TEH TEC 14 54 DSI 02H 0.07 0.23 54 P1 TEH TEC 14 54 DNI 06H 0.00 1.74 52 P1 TEH TEC 14 55 DNI 05H 0.02 1.26 43 P1 TEH TEC 14 55 DNI 06H 0.00 1.49 10 P1 TEH TEC Page 16 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 14 58 DNI 08H 0.00 1.48 45 P1 TEH TEC 14 58 DNI 02C 0.00 1.71 18 P1 TEH TEC 14 58 DSI 05H -0.05 0.19 124 P1 TEH TEC 14 58 DSI 02H 0.07 0.46 170 P1 TEH TEC 14 58 DNI 06C 0.00 1.62 35 P1 TEH TEC 14 59 DSI 03H 0.05 0.18 63 P1 TEH TEC 14 59 DSI 02H 0.05 0.29 131 P1 TEH TEC 14 59 DSI 06H 0.12 0.56 144 P1 TEH TEC 14 59 DNI 08H 0.00 1.96 38 P1 TEH TEC 14 59 DNI 08C 0.00 1.61 38 P1 TEH TEC 14 59 DNI 07C -0.02 1.27 52 P1 TEH TEC 14 59 DNI 04C -0.12 1.38 23 P1 TEH TEC 14 60 DNI 08H 0.02 1.50 54 P1 TEH TEC 14 61 DNI 06C 0.00 1.30 35 P1 TEH TEC 14 61 DNI 06H 0.00 1.62 55 P1 TEH TEC 14 61 DNI 08H 0.02 1.52 46 P1 TEH TEC 14 61 DNI 07C 0.05 1.52 34 P1 TEH TEC 14 61 DNI 08C 0.02 1.18 48 P1 TEH TEC 14 64 DNI 02C 0.25 2.02 16 P1 TEH TEC 14 64 DNI 06C 0.00 1.36 34 P1 TEH TEC 14 64 DNI 07C 0.00 1.92 34 P1 TEH TEC 14 65 DNI 04C 0.00 1.61 20 P1 TEH TEC 14 65 DNI 08H 0.00 1.45 54 P1 TEH TEC 14 65 DSI 03H -0.02 0.14 110 P1 TEH TEC 14 65 DNI 02H 0.00 2.82 46 P1 TEH TEC 14 66 DNI 08H 0.15 1.55 47 P1 TEH TEC 14 67 DNI 06C 0.00 1.14 51 P1 TEH TEC 14 68 DSI 02H 0.02 0.33 24 P1 TEH TEC 14 70 DSI 03H 0.00 0.87 152 P1 TEH TEC 14 70 DSI 02H 0.24 0.41 69 P1 TEH TEC 14 70 DNI 04C 0.29 1.79 13 P1 TEH TEC 14 71 DNI 08H 0.00 1.33 49 P1 TEH TEC 14 71 DSI 02H 0.02 0.10 88 P1 TEH TEC 14 71 DSI 04H -0.02 0.18 26 P1 TEH TEC 14 71 DSI 03H 0.00 0.18 109 P1 TEH TEC 14 72 DSI 06H 0.30 0.19 12 P1 TEH TEC 14 73 DNI 06H 0.15 1.79 30 P1 TEH TEC 14 73 DNI 02C 0.20 1.84 11 P1 TEH TEC 14 73 DNI 06C -0.02 2.10 29 P1 TEH TEC 14 73 DNI 07H 0.05 1.85 40 P1 TEH TEC Page 17 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 14 77 DNI 07C 0.00 1.38 42 P1 TEH TEC 14 77 DNI 08H 0.00 1.47 47 P1 TEH TEC 14 77 DSI 02H 0.00 0.18 169 P1 TEH TEC 14 80 DSI 03H -0.02 0.19 129 P1 TEH TEC 14 80 DNI 08H 0.02 1.29 49 P1 TEH TEC 14 86 DSI 04H 0.00 0.28 38 P1 TEH TEC 14 86 SCI TSH -0.06 0.16 35 0.27 0.10 93 P2 TSH TSH 15 20 SCI TSH -0.20 0.24 117 0.89 0.07 104 P2 TSH TSH 15 26 DNI 07C -0.22 1.51 19 P1 STH TEC 15 26 DNI 08H 0.10 1.42 15 P1 STH TEC 15 27 DSI 05H 0.00 0.15 117 P1 TEH TEC 15 29 SCI TSH -0.07 0.16 85 0.65 0.12 88 P2 TSH TSH 15 31 DSI 04H 0.02 0.35 36 P1 STH TEC 15 31 SAI 04H 0.02 0.30 54 0.41 0.20 78 2

04H 05H 15 35 DNI 06H 0.00 1.53 42 P1 TEH TEC 15 38 DNI 07H 0.00 1.24 43 P1 TEH TEC 15 40 DNI 07H 0.00 1.25 50 P1 TEH TEC 15 40 DNI 08H 0.00 1.81 31 P1 TEH TEC 15 40 DNI 06H 0.00 1.37 49 P1 TEH TEC 15 47 DNI 05H 0.20 1.45 14 P1 TEH TEC 15 50 DNI 08H 0.00 1.64 38 P1 TEH TEC 15 50 DNI 07H 0.00 1.21 54 P1 TEH TEC 15 54 DNI 04H 0.00 1.26 48 P1 TEH TEC 15 60 DNI 04H 0.02 1.24 54 P1 TEH TEC 15 63 DNI 06H 0.25 1.73 38 P1 TEH TEC 15 63 DSI 02H 0.20 0.12 76 P1 TEH TEC 15 65 DNI 03H -0.15 1.58 51 P1 TEH TEC 15 65 DNI 08H 0.00 1.28 49 P1 TEH TEC 15 66 DNI 03H 0.00 1.44 55 P1 TEH TEC 15 67 DNI 08H 0.00 1.32 45 P1 TEH TEC 15 67 DSI 03H 0.00 0.38 78 P1 TEH TEC 15 67 DSI 02H 0.00 0.30 46 P1 TEH TEC 15 70 DNI 03H -0.05 1.29 53 P1 TEH TEC 15 71 DSI 02H 0.05 0.05 141 P1 TEH TEC 15 72 DSI 02H 0.05 0.14 81 P1 TEH TEC 15 73 DNI 08H 0.00 1.42 11 P1 TEH TEC 15 73 DSI 05H 0.02 0.16 101 P1 TEH TEC 15 73 DSI 03H -0.02 0.56 112 P1 TEH TEC 15 73 DNI 06C 0.00 1.37 50 P1 TEH TEC 15 74 DNI 08H 0.00 1.81 45 P1 TEH TEC Page 18 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 15 74 DSI 03H 0.02 0.32 89 P1 TEH TEC 15 74 DNI 07H 0.00 1.63 55 P1 TEH TEC 15 75 DSI 07H 0.00 0.25 141 P1 TEH TEC 15 75 DSI 02H 0.02 0.57 149 P1 TEH TEC 15 75 DNI 07C -0.02 1.81 34 P1 TEH TEC 15 75 DSI 08H 0.07 0.33 170 P1 TEH TEC 15 75 DNI 02C 0.00 1.36 12 P1 TEH TEC 15 76 DNI 07C -0.22 1.25 39 P1 TEH TEC 15 76 DNI 08H 0.17 1.45 45 P1 TEH TEC 15 78 DNI 05C -0.02 1.51 32 P1 TEH TEC 15 79 DNI 08H 0.22 1.39 46 P1 TEH TEC 15 80 DNI 04H 0.00 2.21 50 P1 TEH TEC 15 80 DNI 07C 0.02 1.63 38 P1 TEH TEC 15 80 DNI 08H 0.00 1.96 43 P1 TEH TEC 15 80 DNI 05H 0.00 1.90 52 P1 TEH TEC 15 80 DNI 02H 0.00 2.00 52 P1 TEH TEC 15 80 DNI 07H 0.00 1.89 46 P1 TEH TEC 15 82 DNI 07H 0.00 1.52 54 P1 TEH TEC 15 91 DNI 05C 0.02 1.43 9

P1 TEH TEC 16 11 DSI 05H 0.00 0.10 83 P1 TEH TEC 16 11 SAI 05H -0.06 0.13 40 0.31 0.10 98 P4 05H 06H 16 11 SCI TSH 0.01 0.13 92 0.7 0.10 127 P2 TSH TSH 16 18 SCI TSH -0.11 0.29 160 1.22 0.07 100 P2 TSH TSH 16 18 DNI 04H 0.25 1.36 18 P1 TEH TEC 16 22 DSI 03H 0.02 0.31 125 P1 STH TEC 16 22 DSI 04H 0.00 0.30 105 P1 STH TEC 16 33 SCI TSH -0.23 0.13 40 0.31 0.09 115 P2 TSH TSH 16 38 DNI 07C -0.02 1.89 10 P1 STH TEC 16 39 DNI 04H -0.10 1.66 9

P1 TEH TEC 16 40 DNI 07C 0.00 1.16 38 P1 TEH TEC 16 40 DNI 03H 0.00 1.55 24 P1 TEH TEC 16 40 DNI 05H 0.05 1.39 43 P1 TEH TEC 16 40 DNI 06H 0.02 1.42 48 P1 TEH TEC 16 40 DNI 08C 0.00 1.34 35 P1 TEH TEC 16 44 DNI 03H 0.32 1.28 44 P1 STH TEC 16 44 DNI 08H 0.24 1.30 41 P1 STH TEC 16 44 DNI 05H 0.22 1.29 51 P1 STH TEC 16 50 DSI 05C 0.00 0.28 162 P1 TEH TEC 16 50 DNI 08H 0.00 1.31 54 P1 TEH TEC 16 52 DNI 07H 0.00 1.58 53 P1 TEH TEC Page 19 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 16 52 DSI 02H 0.05 0.55 156 P1 TEH TEC 16 52 DNI 04C 0.00 1.44 19 P1 TEH TEC 16 52 DNI 07C 0.10 1.00 26 P1 TEH TEC 16 52 DNI 02C 0.00 1.92 14 P1 TEH TEC 16 53 DSI 03H 0.02 0.23 29 P1 TEH TEC 16 54 DNI 07C 0.00 2.18 32 P1 TEH TEC 16 54 DNI 08H 0.00 1.46 52 P1 TEH TEC 16 56 DNI 08H 0.02 1.28 54 P1 TEH TEC 16 56 DNI 07H 0.00 1.60 49 P1 TEH TEC 16 57 DNI 07C 0.00 1.30 46 P1 TEH TEC 16 57 DNI 08C 0.00 1.49 45 P1 TEH TEC 16 57 DNI 08H 0.00 2.15 39 P1 TEH TEC 16 57 DNI 06H -0.02 1.59 52 P1 TEH TEC 16 57 DNI 05C -0.17 1.25 24 P1 TEH TEC 16 59 DNI 07H 0.00 1.82 45 P1 TEH TEC 16 59 DNI 06C 0.00 1.94 29 P1 TEH TEC 16 59 DNI 05C 0.29 1.44 12 P1 TEH TEC 16 59 DNI 07C -0.17 1.47 28 P1 TEH TEC 16 59 DNI 02H -0.15 1.41 40 P1 TEH TEC 16 59 DNI 03H -0.02 2.14 51 P1 TEH TEC 16 60 DSI 02H 0.05 0.23 123 P1 TEH TEC 16 62 DSI 08H 0.02 0.08 27 P1 TEH TEC 16 66 DSI 03H 0.20 0.21 41 P1 TEH TEC 16 66 DNI 07C 0.00 1.26 45 P1 TEH TEC 16 70 DSI 03H -0.10 0.27 101 P1 TEH TEC 16 72 DNI 05H 0.22 1.67 55 P1 TEH TEC 16 72 DSI 02H 0.02 0.16 133 P1 TEH TEC 16 76 DSI 02H 0.02 0.25 120 P1 TEH TEC 16 76 DNI 06H 0.00 1.28 48 P1 TEH TEC 16 77 DSI 05H -0.07 0.17 163 P1 TEH TEC 16 84 DNI 08H 0.00 1.37 55 P1 TEH TEC 16 84 DNI 07H 0.00 1.65 51 P1 TEH TEC 16 86 DNI 02C 0.00 1.61 15 P1 STH TEC 16 89 DNI 08H 0.20 1.26 52 P1 TEH TEC 17 6

DNI 02H 0.20 1.32 18 P1 TEH TEC 17 9

SCI TSH -0.06 0.25 34 0.26 0.11 66 P2 TSH TSH 17 10 DSI 03H 0.00 0.31 168 P1 TEH TEC 17 12 DNI 04H 0.00 1.65 15 P1 TEH TEC 17 16 SCI TSH -0.08 0.29 135 1.03 0.08 130 P2 TSH TSH 17 23 DNI 07C -0.10 1.15 16 P1 STH TEC Page 20 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 17 25 SCI TSH -0.13 0.18 34 0.26 0.08 136 P2 TSH TSH 17 26 SCI TSH -0.05 0.21 82 0.62 0.09 63 P2 TSH TSH 17 27 DSI 04H 0.12 0.09 99 P1 TEH TEC 17 31 DNI 04H -0.12 1.36 14 P1 TEH TEC 17 32 DSI 05H 0.07 0.42 37 P1 TEH TEC 17 35 DNI 06H 0.00 1.53 28 P1 TEH TEC 17 39 DNI 05H 0.10 1.76 15 P1 TEH TEC 17 43 SCI TSH -0.18 0.10 35 0.27 0.09 122 P2 TSH TSH 17 49 DNI 04C 0.00 1.42 19 P1 TEH TEC 17 49 DNI 05C 0.00 1.75 32 P1 TEH TEC 17 49 DNI 06C 0.00 1.55 29 P1 TEH TEC 17 49 DNI 08C 0.00 1.35 41 P1 TEH TEC 17 51 DNI 08H 0.00 1.83 44 P1 TEH TEC 17 51 DNI 07C 0.00 1.42 45 P1 TEH TEC 17 51 DNI 07H 0.03 1.30 55 P1 TEH TEC 17 51 DNI 05H 0.02 1.38 52 P1 TEH TEC 17 53 DNI 08C 0.00 1.71 37 P1 TEH TEC 17 53 DNI 07C 0.00 1.18 49 P1 TEH TEC 17 54 DNI 08C -0.05 1.29 24 P1 TEH TEC 17 54 DNI 08H 0.00 2.17 35 P1 TEH TEC 17 54 DNI 07C 0.00 2.07 35 P1 TEH TEC 17 54 DNI 06C -0.02 1.92 29 P1 TEH TEC 17 54 DNI 04C -0.32 1.54 13 P1 TEH TEC 17 54 DNI 03C -0.37 1.52 16 P1 TEH TEC 17 54 DSI 03H 0.05 0.15 65 P1 TEH TEC 17 58 DNI 07H 0.00 1.26 54 P1 TEH TEC 17 59 DSI 05H 0.07 0.22 130 P1 TEH TEC 17 59 DSI 02H 0.05 0.37 158 P1 TEH TEC 17 68 SCI TSH 0.00 0.15 58 0.45 0.08 112 P2 TSH TSH 17 76 DNI 07H 0.00 1.78 48 P1 TEH TEC 17 76 DNI 08H 0.22 1.36 52 P1 TEH TEC 17 76 DNI 04C 0.00 1.33 14 P1 TEH TEC 17 76 DNI 05C 0.07 1.57 24 P1 TEH TEC 17 76 DSI 02H 0.00 0.41 49 P1 TEH TEC 17 76 DNI 03H 0.00 1.76 43 P1 TEH TEC 17 81 DSI 03H 0.00 0.17 161 P1 TEH TEC 17 81 DSI 04H -0.07 0.16 64 P1 TEH TEC 17 81 DNI 07C -0.05 1.29 19 P1 TEH TEC 17 83 DNI AV2 5.71 0.17 119 5

TEH TEC 17 84 DSI 03H -0.02 0.11 98 P1 TEH TEC Page 21 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 18 7

DNI 08H 0.02 1.37 49 P1 TEH TEC 18 7

DSI 04H 0.02 0.27 158 P1 TEH TEC 18 10 DSI 04H 0.02 0.20 146 P1 TEH TEC 18 10 DSI 03H 0.05 0.64 174 P1 TEH TEC 18 14 DSI 04H 0.05 0.18 38 P1 TEH TEC 18 15 DNI 08H 0.00 1.77 17 P1 TEH TEC 18 17 DNI 04H -0.22 1.34 20 P1 TEH TEC 18 27 DSI 07H -0.02 0.12 26 P1 STH TEC 18 30 SCI TSH -0.03 0.24 62 0.47 0.12 72 P2 TSH TSH 18 30 DSI 04H 0.00 0.07 33 P1 TEH TEC 18 32 DNI 08H 0.00 1.40 51 P1 TEH TEC 18 32 DNI 07H 0.00 1.34 55 P1 TEH TEC 18 40 DNI 06H 0.00 1.27 53 P1 TEH TEC 18 43 DNI 06H 0.00 1.35 53 P1 TEH TEC 18 43 DNI 07H 0.00 1.60 38 P1 TEH TEC 18 43 DNI 05H 0.00 1.48 48 P1 TEH TEC 18 45 DNI 08H 0.00 1.29 50 P1 TEH TEC 18 47 DSI 02H 0.02 0.23 141 P1 TEH TEC 18 47 DNI 08H 0.00 1.27 51 P1 TEH TEC 18 47 DSI 05H 0.00 0.33 86 P1 TEH TEC 18 48 DSI 02H 0.05 0.18 145 P1 TEH TEC 18 48 DSI 03H -0.05 0.77 104 P1 TEH TEC 18 48 DNI 08H 0.00 2.03 38 P1 TEH TEC 18 48 DNI 07H 0.00 1.85 44 P1 TEH TEC 18 48 SAI 03H -0.02 0.24 28 0.21 0.10 97 6

03H 03H 18 52 DNI 04C 0.00 1.26 15 P1 TEH TEC 18 52 DNI 05C 0.00 2.04 26 P1 TEH TEC 18 52 DNI 06C 0.00 2.14 30 P1 TEH TEC 18 55 DNI 08C 0.00 1.50 40 P1 TEH TEC 18 55 DNI 05H -0.10 2.26 45 P1 TEH TEC 18 55 DNI 06C 0.00 1.52 36 P1 TEH TEC 18 55 DNI 07C 0.00 1.54 39 P1 TEH TEC 18 55 DNI 06H 0.00 1.72 49 P1 TEH TEC 18 56 DNI 08H 0.00 1.91 34 P1 TEH TEC 18 56 DNI 07H 0.00 1.55 54 P1 TEH TEC 18 57 DNI 07H 0.00 1.78 51 P1 TEH TEC 18 57 DNI 08H -0.03 1.81 40 P1 TEH TEC 18 57 DNI 05C 0.00 1.57 34 P1 TEH TEC 18 57 DSI 02H 0.02 0.31 63 P1 TEH TEC 18 58 DSI 02H 0.15 0.48 96 P1 TEH TEC Page 22 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 18 69 SCI TSH 0.06 0.18 125 0.95 0.09 97 P2 TSH TSH 18 83 DNI 08H 0.15 1.31 42 P1 TEH TEC 18 88 DSI 05H 0.00 0.14 148 P1 TEH TEC 19 7

DSI 02H 0.00 0.35 135 P1 TEH TEC 19 7

DSI 03H 0.00 0.29 94 P1 TEH TEC 19 7

SAI 03H 0.05 0.16 42 0.32 0.13 85 6

03H 03H 19 8

DNI 04H -0.02 1.36 55 P1 TEH TEC 19 8

DSI 03H -0.05 0.22 146 P1 TEH TEC 19 13 DNI 04H 0.15 1.46 16 P1 TEH TEC 19 15 DSI 04H 0.00 0.13 120 P1 TEH TEC 19 15 DSI 03H -0.05 0.15 148 P1 TEH TEC 19 20 DNI 08H -0.05 1.33 46 P1 TEH TEC 19 27 SCI TSH -0.15 0.19 129 0.99 0.11 145 P2 TSH TSH 19 30 SCI TSH -0.09 0.31 45 0.34 0.16 109 P2 TSH TSH 19 31 SCI TSH -0.11 0.25 57 0.43 0.12 84 P2 TSH TSH 19 33 SCI TSH -0.19 0.15 98 0.75 0.11 124 P2 TSH TSH 19 36 DNI 01C 0.10 1.30 14 P1 STH TEC 19 48 DNI 06H 0.00 1.24 42 P1 TEH TEC 19 48 DNI 07H 0.00 1.26 46 P1 TEH TEC 19 49 DNI 08C -0.10 1.30 23 P1 TEH TEC 19 50 HCI TSH 0.03 0.23 145 1.1 0.36 95 P2 TSH TSH 19 54 DNI 04H 0.22 1.29 16 P1 TEH TEC 19 54 DNI 03H 0.17 1.18 14 P1 TEH TEC 19 54 DNI 08H 0.05 1.29 25 P1 TEH TEC 19 56 DNI 07H 0.00 1.39 50 P1 TEH TEC 19 56 DNI 06H 0.00 1.45 52 P1 TEH TEC 19 56 DSI 03H 0.05 0.31 164 P1 TEH TEC 19 56 DNI 08H 0.00 1.51 38 P1 TEH TEC 19 57 DNI 08H 0.00 1.50 52 P1 TEH TEC 19 57 DSI 02H 0.05 0.63 171 P1 TEH TEC 19 57 DSI 04H 0.05 0.19 139 P1 TEH TEC 19 59 DNI 02H 0.00 2.26 55 P1 TEH TEC 19 59 DNI 05H -0.30 2.26 16 P1 TEH TEC 19 59 DNI 05C -0.05 2.15 15 P1 TEH TEC 19 59 DNI 06C -0.27 1.48 19 P1 TEH TEC 19 59 DNI 08H 0.24 1.45 26 P1 TEH TEC 19 59 DNI 06H -0.17 1.37 30 P1 TEH TEC 19 59 DNI 04H 0.00 2.96 39 P1 TEH TEC 19 59 DNI 03H 0.00 2.24 44 P1 TEH TEC 19 60 DSI 02H 0.02 0.33 58 P1 TEH TEC Page 23 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 19 60 DNI 03H -0.02 1.58 53 P1 TEH TEC 19 60 DNI 07H 0.00 1.38 50 P1 TEH TEC 19 72 SCI TSH -0.12 0.05 43 0.33 0.17 130 P2 TSH TSH 19 75 DNI 03C 0.00 1.22 13 P1 TEH TEC 20 7

DSI 08C -0.05 0.08 83 P1 TEH TEC 20 9

DSI 03H 0.02 0.12 130 P1 TEH TEC 20 10 DSI 04H -0.02 0.16 81 P1 TEH TEC 20 12 DSI 02H 0.00 0.07 52 P1 TEH TEC 20 15 DNI 07H -0.10 1.27 46 P1 TEH TEC 20 22 DNI 08C 0.00 1.35 31 P1 TEH TEC 20 22 DSI 08H 0.00 0.29 36 P1 TEH TEC 20 22 DSI 02H 0.10 0.20 126 P1 TEH TEC 20 22 DSI 03H 0.05 0.24 62 P1 TEH TEC 20 23 DNI 08H 0.27 1.35 13 P1 TEH TEC 20 24 DNI 06H 0.15 1.50 16 P1 TEH TEC 20 25 DNI 07H 0.00 1.31 47 P1 TEH TEC 20 40 SCI TSH -0.02 0.12 43 0.33 0.05 92 P2 TSH TSH 20 44 DSI 02H 0.02 0.16 145 P1 TEH TEC 20 48 DNI 04C 0.00 1.61 8

P1 TEH TEC 20 50 DSI 08C -0.02 0.25 133 P1 TEH TEC 20 57 DSI 02H 0.07 0.13 150 P1 STH TEC 20 57 DNI 06C -0.10 1.93 19 P1 STH TEC 20 57 DNI 07C 0.00 1.42 35 P1 STH TEC 20 58 DNI 08C -0.10 1.68 20 P1 TEH TEC 20 61 DNI 08H 0.00 1.60 42 P1 TEH TEC 20 62 DSI 05H 0.02 0.48 140 P1 TEH TEC 20 64 PCT AV3 0.03 19 1.35 144 P2 TEH TEC 20 64 PCT AV1 0.00 16 1.04 55 P2 TEH TEC 20 64 PCT AV2 0.00 21 1.58 127 P2 TEH TEC 20 71 DNI 05C 0.00 1.19 12 P1 TEH TEC 20 72 DNI 07C 0.00 1.57 14 P1 TEH TEC 20 75 DSI 05H 0.00 0.38 168 P1 TEH TEC 20 75 DNI 06C 0.00 1.26 33 P1 TEH TEC 20 75 DNI 08C 0.00 1.24 31 P1 TEH TEC 20 78 DNI 08H 0.25 1.66 35 P1 TEH TEC 20 78 DSI 04H 0.02 0.18 154 P1 TEH TEC 20 80 PCT TSH 0.13 16 0.13 22 0.16 0.08 96 P4 TSH TSH 20 80 VOL TSH 0.13 0.09 75 6

TSH TSH 20 81 DNI 05C 0.15 1.87 16 P1 TEH TEC 20 85 DSI 03H 0.07 0.32 147 P1 TEH TEC Page 24 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 21 12 DNI 07H 0.00 1.74 32 P1 TEH TEC 21 18 DSI 04H 0.02 0.43 175 P1 TEH TEC 21 21 DNI 05H 0.02 1.33 24 P1 TEH TEC 21 21 DNI 07H -0.05 1.53 15 P1 TEH TEC 21 22 SCI TSH 0.00 0.19 23 0.18 0.06 91 P2 TSH TSH 21 25 DSI 03H 0.05 0.18 97 P1 TEH TEC 21 26 DSI 05H 0.00 0.40 116 P1 TEH TEC 21 27 SCI TSH -0.15 0.13 91 0.69 0.17 93 P2 TSH TSH 21 29 SCI TSH -0.27 0.21 46 0.35 0.08 125 P2 TSH TSH 21 34 DSI 02H 0.05 0.43 163 P1 TEH TEC 21 38 SCI TSH -0.11 0.22 88 0.67 0.09 76 P2 TSH TSH 21 40 DNI 07H 0.00 1.54 44 P1 TEH TEC 21 43 DSI 02H 0.00 0.24 165 P1 TEH TEC 21 43 DNI 05H 0.00 1.29 54 P1 TEH TEC 21 45 DNI 07H 0.00 1.28 52 P1 TEH TEC 21 46 DSI 02H -0.05 0.11 81 P1 TEH TEC 21 48 DSI 04H -0.02 0.52 15 P1 TEH TEC 21 48 DNI 03H -0.20 1.26 23 P1 TEH TEC 21 48 DNI 05H 0.00 2.08 25 P1 TEH TEC 21 48 DNI 07H 0.00 1.33 27 P1 TEH TEC 21 48 DNI 02H 0.00 1.19 46 P1 TEH TEC 21 48 DNI 08H 0.00 1.45 20 P1 TEH TEC 21 48 DNI 08C 0.00 1.56 21 P1 TEH TEC 21 48 DNI 06H 0.00 1.52 39 P1 TEH TEC 21 51 DNI 03H 0.00 1.11 18 P1 TEH TEC 21 51 DNI 06H 0.15 1.56 9

P1 TEH TEC 21 51 DNI 05C -0.12 1.33 18 P1 TEH TEC 21 53 DNI 08H 0.02 1.33 38 P1 TEH TEC 21 55 DSI 02H -0.12 0.12 147 P1 TEH TEC 21 60 DNI 05H -0.02 1.31 39 P1 TEH TEC 21 60 DNI 08H -0.03 1.41 39 P1 TEH TEC 21 60 SCI TSH -0.06 0.12 35 0.27 0.07 98 P2 TSH TSH 21 61 DSI 08H 0.05 0.27 158 P1 TEH TEC 21 66 SCI TSH 0.00 0.10 148 1.13 0.08 56 P2 TSH TSH 21 67 SCI TSH -0.13 0.08 35 0.27 0.06 76 P2 TSH TSH 21 72 DSI 03H 0.15 0.29 67 P1 TEH TEC 21 72 DNI 06C 0.46 1.74 11 P1 TEH TEC 21 73 DNI 08C 0.00 1.31 35 P1 TEH TEC 21 73 DNI 02C 0.00 1.38 17 P1 TEH TEC 21 73 DNI 07H -0.30 1.42 9

P1 TEH TEC Page 25 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 21 73 DNI 05H 0.00 1.44 32 P1 TEH TEC 21 73 DSI 03H -0.07 0.34 54 P1 TEH TEC 21 75 DNI 08C -0.02 1.40 30 P1 TEH TEC 21 77 DNI 03H 0.00 1.28 9

P1 TEH TEC 21 78 DSI 08H -0.03 0.11 154 P1 TEH TEC 21 80 DNI 08H -0.02 1.31 49 P1 TEH TEC 21 83 DNI 03C -0.05 1.48 13 P1 TEH TEC 21 87 DSI 08C 0.01 0.11 98 P1 TEH TEC 22 7

DSI 02H 0.05 0.19 115 P1 TEH TEC 22 10 DNI 08C -0.02 1.27 17 P1 TEH TEC 22 12 DNI 03H 0.05 1.24 52 P1 TEH TEC 22 18 DNI 08C 0.00 1.74 38 P1 STH TEC 22 21 DSI 03H 0.00 0.31 162 P1 TEH TEC 22 21 DSI 02H -0.07 0.11 164 P1 TEH TEC 22 23 DNI 08H 0.00 1.81 9

P1 TEH TEC 22 23 DSI 02H 0.22 0.40 146 P1 TEH TEC 22 24 DSI 02H 0.05 0.34 136 P1 TEH TEC 22 25 DSI 02H 0.07 0.23 101 P1 STH TEC 22 29 SCI TSH -0.18 0.18 146 1.12 0.17 112 P2 TSH TSH 22 36 DNI 06H 0.00 1.39 55 P1 TEH TEC 22 51 DNI 08C 0.00 2.43 28 P1 TEH TEC 22 53 DNI 03H -0.07 1.35 17 P1 TEH TEC 22 53 DNI 04H 0.00 1.66 19 P1 TEH TEC 22 53 DNI 08H -0.05 1.24 15 P1 TEH TEC 22 53 DNI 06H 0.00 1.28 34 P1 TEH TEC 22 59 DNI 05C 0.00 1.16 18 P1 TEH TEC 22 60 PSI 03H -0.29 13.05 153 P5 TEH TEC 22 65 DNI 07H 0.05 1.81 10 P1 TEH TEC 22 65 DNI 05C 0.00 1.88 19 P1 TEH TEC 22 66 DNI 06H 0.20 1.20 33 P1 TEH TEC 22 66 DNI 03H 0.00 1.30 23 P1 TEH TEC 22 66 SCI TSH 0.00 0.00 182 1.39 0.10 129 P2 TSH TSH 22 74 DNI 04H -0.12 1.76 13 P1 STH TEC 22 74 DNI 08H -0.05 2.12 14 P1 STH TEC 22 74 DNI 07H -0.10 1.52 10 P1 STH TEC 22 76 DNI 05H -0.02 1.63 16 P1 TEH TEC 23 10 DNI 07H -0.05 1.50 24 P1 TEH TEC 23 11 DSI 03H -0.05 0.11 133 P1 TEH TEC 23 11 DSI 02H -0.05 0.34 20 P1 TEH TEC 23 11 DNI 08H 0.00 1.31 38 P1 TEH TEC Page 26 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 23 13 SCI TSH -0.09 0.30 31 0.23 0.09 98 P2 TSH TSH 23 16 DNI 06H 0.22 1.38 14 P1 TEH TEC 23 18 DSI 05H 0.00 0.99 29 P1 STH TEC 23 18 SAI 05H -0.03 0.22 46 0.35 0.13 49 2

05H 05H 23 19 DNI 04H 0.00 1.51 45 P1 TEH TEC 23 19 DNI 03H 0.00 1.60 38 P1 TEH TEC 23 19 DSI 02H -0.03 0.46 27 P1 TEH TEC 23 20 DSI 02H -0.02 0.17 149 P1 TEH TEC 23 20 DNI 08C 0.00 1.28 37 P1 TEH TEC 23 21 SCI TSH -0.16 0.14 60 0.46 0.07 87 P2 TSH TSH 23 21 DSI 03H 0.05 0.15 129 P1 TEH TEC 23 21 DNI 07H 0.18 1.18 22 P1 TEH TEC 23 25 DNI 08H -0.02 1.30 35 P1 STH TEC 23 25 DSI 03H -0.10 0.42 143 P1 STH TEC 23 26 DNI 05C 0.00 1.19 40 P1 TEH TEC 23 28 SCI TSH -0.17 0.29 103 0.79 0.09 126 P2 TSH TSH 23 29 SCI TSH -0.16 0.16 83 0.63 0.13 100 P2 TSH TSH 23 30 DNI 07H 0.00 1.27 21 P1 TEH TEC 23 31 SCI TSH -0.14 0.25 55 0.42 0.09 115 P2 TSH TSH 23 32 DNI 08C 0.00 1.26 41 P1 TEH TEC 23 33 DNI 07H 0.00 1.37 44 P1 TEH TEC 23 34 SCI TSH -0.08 0.10 72 0.55 0.17 102 P2 TSH TSH 23 46 DNI 06H 0.00 2.03 35 P1 TEH TEC 23 46 DNI 03H 0.00 1.35 47 P1 TEH TEC 23 46 DNI 07H 0.00 1.67 34 P1 TEH TEC 23 46 DNI 08C 0.00 1.36 34 P1 TEH TEC 23 49 DNI 06C 0.15 2.56 11 P1 TEH TEC 23 52 DSI 03H 0.05 0.27 40 P1 TEH TEC 23 53 DSI 04H 0.00 0.18 27 P1 TEH TEC 23 53 DSI 02H 0.02 0.19 23 P1 TEH TEC 23 53 SAI 02H -0.13 0.23 38 0.29 0.04 99 P4 02H 02H 23 80 DNI 07H -0.12 1.59 20 P1 TEH TEC 23 80 DNI 08H -0.02 1.35 39 P1 TEH TEC 23 81 DNI 04H 0.00 1.38 53 P1 TEH TEC 23 87 DSI 04H 0.00 0.37 143 P1 TEH TEC 24 16 DSI 03H 0.00 0.13 151 P1 TEH TEC 24 16 DSI 02H 0.02 0.36 180 P1 TEH TEC 24 17 DNI 05H 0.00 1.47 55 P1 TEH TEC 24 17 DNI 08C 0.00 1.34 33 P1 TEH TEC 24 18 SCI TSH -0.04 0.21 45 0.34 0.05 122 P2 TSH TSH Page 27 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 24 19 SCI TSH -0.20 0.22 83 0.63 0.17 77 P2 TSH TSH 24 21 HCI TSH 0.00 0.00 352 2.69 0.89 86 P2 TSH TSH 24 23 DSI 05H 0.32 0.33 35 P1 TEH TEC 24 24 DNI 05H -0.10 1.47 27 P1 TEH TEC 24 24 DSI 02H -0.07 0.15 145 P1 TEH TEC 24 29 SCI TSH -0.17 0.21 117 0.89 0.15 112 P2 TSH TSH 24 29 DNI 08H 0.00 1.50 29 P1 TEH TEC 24 29 DNI 07H 0.08 1.49 27 P1 TEH TEC 24 33 DSI 03H 0.00 0.15 67 P1 TEH TEC 24 34 SCI TSH 0.00 0.12 68 0.52 0.16 134 P2 TSH TSH 24 37 DNI 07H 0.00 1.41 33 P1 TEH TEC 24 39 DSI 02H -0.02 0.22 89 P1 TEH TEC 24 40 DNI 05H 0.05 1.44 51 P1 TEH TEC 24 40 DNI 06H 0.00 1.41 45 P1 TEH TEC 24 43 DNI 05C 0.25 1.25 12 P1 TEH TEC 24 47 DNI 06C 0.15 1.63 14 P1 TEH TEC 24 51 DNI 07C 0.12 1.25 14 P1 TEH TEC 24 52 DSI 02H 0.02 0.22 125 P1 TEH TEC 24 59 DNI 04H -0.10 1.34 17 P1 TEH TEC 24 63 DSI 05H 0.07 0.42 170 P1 TEH TEC 24 69 DNI 04C -0.22 1.33 11 P1 TEH TEC 24 80 DSI 03H 0.00 0.14 146 P1 TEH TEC 24 80 DNI 08H 0.00 1.31 54 P1 TEH TEC 24 80 DNI 05H 0.00 1.42 55 P1 TEH TEC 25 15 DNI 05H -0.02 1.08 15 P1 TEH TEC 25 16 DSI 04H 0.02 0.54 167 P1 TEH TEC 25 21 DSI 02H 0.07 0.05 156 P1 TEH TEC 25 22 DSI 02H -0.02 0.19 47 P1 TEH TEC 25 29 SCI TSH -0.20 0.16 42 0.32 0.11 138 P2 TSH TSH 25 30 DSI 06H 0.02 0.11 120 P1 TEH TEC 25 30 DSI 04H 0.05 0.34 55 P1 TEH TEC 25 39 DNI 07C -0.02 1.26 20 P1 TEH TEC 25 39 DNI 08C -0.07 1.33 14 P1 TEH TEC 25 50 DSI 08H 0.05 0.11 72 P1 TEH TEC 25 53 DNI 06H 0.05 1.42 21 P1 TEH TEC 25 55 SCI TSH -0.06 0.19 69 0.53 0.11 119 P2 TSH TSH 26 15 DSI 03H 0.05 0.15 144 P1 TEH TEC 26 17 DNI 08H 0.17 1.45 45 P1 TEH TEC 26 19 DSI 04H 0.05 0.09 70 P1 TEH TEC 26 20 SCI TSH -0.10 0.19 97 0.74 0.19 130 P2 TSH TSH Page 28 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 26 28 DNI 08H 0.00 1.64 32 P1 STH TEC 26 32 SCI TSH -0.13 0.20 77 0.59 0.11 103 P2 TSH TSH 26 36 DNI 03H -0.02 1.39 48 P1 TEH TEC 26 36 DNI 02C 0.00 1.11 11 P1 TEH TEC 26 36 DNI 06H 0.00 1.37 46 P1 TEH TEC 26 36 DNI 04H 0.00 1.49 42 P1 TEH TEC 26 36 DNI 05C 0.02 1.43 21 P1 TEH TEC 26 36 DNI 08H 0.00 1.41 32 P1 TEH TEC 26 40 SCI TSH -0.04 0.17 75 0.58 0.12 135 P2 TSH TSH 26 42 DSI 02H -0.02 0.11 137 P1 TEH TEC 26 43 DNI 05H 0.22 1.31 44 P1 STH TEC 26 45 DNI 05H 0.02 1.51 53 P1 TEH TEC 26 60 DNI 06H 0.00 1.22 35 P1 TEH TEC 26 62 DNI 04H 0.24 0.89 19 P1 STH TEC 26 64 DSI 02H 0.00 0.10 72 P1 STH TEC 26 67 DNI 04H -0.15 1.38 23 P1 TEH TEC 26 68 SCI TSH 0.03 0.23 55 0.42 0.11 71 P2 TSH TSH 26 68 SCI TSH 0.00 0.18 37 0.28 0.14 55 P2 TSH TSH 26 80 DSI 05H 0.02 0.08 85 P1 TEH TEC 26 84 DNI 08H -0.02 1.29 13 P1 TEH TEC 27 20 HCI TSH -0.09 0.17 222 1.69 0.38 74 P2 TSH TSH 27 32 DSI 02H -0.02 0.13 58 P1 TEH TEC 27 32 SCI TSH -0.04 0.15 37 0.28 0.07 101 P2 TSH TSH 27 33 DSI 03H -0.17 0.45 51 P1 TEH TEC 27 34 DSI 04H -0.02 0.16 106 P1 TEH TEC 27 34 DSI 05H 0.05 0.24 143 P1 TEH TEC 27 42 DSI 04H -0.02 0.15 129 P1 TEH TEC 27 42 DSI 05H -0.05 0.16 93 P1 TEH TEC 27 42 SAI 04H 0.05 0.20 38 0.29 0.09 97 6

04H 04H 27 47 DSI 02H -0.02 0.22 111 P1 TEH TEC 27 51 DNI 05H 0.51 1.26 12 P1 STH TEC 27 55 DSI 03H 0.05 0.12 99 P1 TEH TEC 27 55 DSI 04H 0.05 0.18 136 P1 TEH TEC 27 58 DNI 07C -0.15 2.17 10 P1 TEH TEC 27 58 PCT AV2 0.50 19 1.68 211 P2 TEH TEC 27 64 DNI 07H -0.07 1.34 42 P1 TEH TEC 27 64 DNI 06H 0.00 1.26 43 P1 TEH TEC 27 64 DSI 02H 0.02 0.17 33 P1 TEH TEC 27 71 PCT AV2 0.22 16 1.16 228 P2 TEH TEC 27 71 PCT AV4 -0.46 17 1.22 25 P2 TEH TEC Page 29 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 27 71 PCT AV3 -0.40 20 1.53 33 P2 TEH TEC 27 75 DNI 08H 0.00 1.36 29 P1 TEH TEC 27 75 PCT AV3 0.36 11 0.67 39 P2 TEH TEC 27 75 DSI 05H 0.00 0.29 153 P1 TEH TEC 28 13 DSI 03H 0.07 0.41 168 P1 TEH TEC 28 21 SCI TSH -0.16 0.13 160 1.22 0.31 61 P2 TSH TSH 28 21 HAI TSH 0.00 0.00 182 1.39 0.35 46 6

TSH TSH 28 23 SCI TSH 0.00 0.25 132 1.01 0.10 117 P2 TSH TSH 28 24 SCI TSH -0.15 0.27 102 0.78 0.17 66 P2 TSH TSH 28 26 DSI 04H 0.25 0.52 42 P1 TEH TEC 28 27 PSI 05H -0.39 16.25 163 P5 STH TEC 28 27 PSI 08H 0.62 16.40 350 P5 STH TEC 28 30 DNI 08H 0.02 1.26 9

P1 TEH TEC 28 31 SCI TSH -0.03 0.15 72 0.55 0.08 79 P2 TSH TSH 28 32 DNI 07H 0.27 1.60 10 P1 TEH TEC 28 33 SCI TSH -0.10 0.18 58 0.45 0.16 141 P2 TSH TSH 28 41 DNI 07H 0.02 1.41 49 P1 TEH TEC 28 41 DSI 02H 0.22 0.20 115 P1 TEH TEC 28 41 DNI 05H 0.00 1.46 52 P1 TEH TEC 28 41 DNI 06H 0.05 1.30 52 P1 TEH TEC 28 42 DNI 07H 0.00 1.26 54 P1 TEH TEC 28 42 DNI 06H 0.00 1.32 55 P1 TEH TEC 28 42 DNI 05H 0.00 1.41 53 P1 TEH TEC 28 42 DSI 03H -0.12 0.40 49 P1 TEH TEC 28 44 DNI 08H 0.00 1.29 53 P1 TEH TEC 28 45 DSI 02H 0.07 0.52 112 P1 TEH TEC 28 46 DSI 03H 0.12 0.15 48 P1 STH TEC 28 54 DSI 02H -0.02 0.20 121 P1 TEH TEC 28 56 DSI 03H 0.05 0.51 153 P1 TEH TEC 28 56 DNI 02H 0.00 1.74 35 P1 TEH TEC 28 56 DNI 06H 0.00 1.55 52 P1 TEH TEC 28 60 PCT AV3 0.00 20 1.61 18 P2 STH TEC 28 60 WAR AV3 0.00 0.28 125 2

08C AV3 28 66 DSI 04H -0.07 0.30 149 P1 TEH TEC 28 66 SAI 04H -0.12 0.17 28 0.21 0.12 120 6

04H 04H 28 66 SCI TSH 0.02 0.12 12 0.09 0.07 79 P2 TSH TSH 28 74 SAI TSH 0.00 0.15 31 0.23 0.13 102 6

TSH TSH 28 75 PCT AV3 0.18 19 1.43 32 P2 TEH TEC 29 13 DNI 08H -0.02 1.38 44 P1 TEH TEC 29 16 DNI 07H -0.02 1.35 49 P1 TEH TEC Page 30 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 29 16 DNI 06H 0.02 1.63 45 P1 TEH TEC 29 19 DNI 08H 0.00 1.56 23 P1 TEH TEC 29 21 SCI TSH -0.14 0.18 34 0.26 0.11 103 P2 TSH TSH 29 24 DSI 04H 0.15 0.19 37 P1 TEH TEC 29 24 DNI 08H 0.02 1.59 41 P1 TEH TEC 29 24 DSI 02H 0.00 0.24 115 P1 TEH TEC 29 25 SCI TSH -0.04 0.16 72 0.55 0.07 57 P2 TSH TSH 29 25 DNI 07H 0.00 1.23 35 P1 TEH TEC 29 29 DNI 03H -0.20 1.83 17 P1 TEH TEC 29 30 DSI 05H 0.02 0.29 14 P1 TEH TEC 29 33 DNI 08H 0.02 1.29 35 P1 TEH TEC 29 41 SCI TSH -0.16 0.20 128 0.98 0.15 142 P2 TSH TSH 29 48 DSI 04H 0.05 0.16 143 P1 TEH TEC 29 53 HCI TSH 0.00 0.23 138 1.06 0.84 70 P2 TSH TSH 29 54 SAI 03H 0.00 0.22 49 0.38 0.10 137 6

03H 03H 29 54 SAI 03H 0.00 0.32 46 0.35 0.17 93 6

03H 03H 29 54 SAI 03H -0.01 0.29 45 0.34 0.09 112 6

03H 03H 29 54 DSI 03H 0.00 0.25 87 P1 TEH TEC 29 56 DSI 06H 0.07 0.99 13 P1 STH TEC 29 56 SAI 06H -0.05 0.22 38 0.29 0.12 122 2

06H 06H 29 62 SCI TSH -0.02 0.10 29 0.22 0.11 87 P2 TSH TSH 29 64 DNI 08H -0.02 1.26 37 P1 TEH TEC 29 64 SAI TSH 0.00 0.10 83 0.63 0.16 84 6

TSH TSH 29 65 DSI 02H -0.05 0.16 15 P1 TEH TEC 29 72 PCT AV1 0.27 17 0.98 323 P2 TEH TEC 29 72 WAR AV1 0.21 0.29 116 2

AV1 AV1 29 76 DNI 08H 0.00 1.48 9

P1 TEH TEC 29 81 DSI 05H -0.07 0.22 154 P1 TEH TEC 30 20 DNI 08H 0.12 1.31 23 P1 TEH TEC 30 21 DNI 06H 0.05 1.17 51 P1 TEH TEC 30 22 DSI 02H 0.02 0.15 68 P1 TEH TEC 30 23 HCI TSH 0.00 0.23 165 1.26 0.49 100 P2 TSH TSH 30 24 SAI TSH 0.00 0.13 75 0.58 0.09 104 6

TSH TSH 30 25 DSI 05H 0.07 0.99 184 P1 STH TEC 30 25 SAI 05H -0.13 0.15 48 0.36 0.13 83 2

05H 05H 30 28 DNI 08H 0.00 1.24 38 P1 TEH TEC 30 28 DSI 03H 0.05 0.22 163 P1 TEH TEC 30 36 DNI 03H 0.05 1.12 27 P1 TEH TEC 30 38 DSI 02H 0.00 0.21 165 P1 TEH TEC 30 38 DNI 06H 0.02 1.37 24 P1 TEH TEC Page 31 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 30 39 SCI TSH 0.00 0.45 35 0.27 0.13 109 P2 TSH TSH 30 45 SCI TSH 0.00 0.17 43 0.33 0.16 128 P2 TSH TSH 30 48 DSI 06H 0.27 0.13 160 P1 STH TEC 30 48 DSI 04H 0.00 0.44 30 P1 STH TEC 30 49 DNI 07C 0.00 1.55 10 P1 TEH TEC 30 50 DSI 05C 0.00 0.20 139 P1 TEH TEC 30 51 DSI 08C -0.02 0.26 61 P1 TEH TEC 30 51 DNI 04C -0.12 1.29 15 P1 TEH TEC 30 52 DNI 07C -0.15 1.32 15 P1 STH TEC 30 54 DSI 04H -0.05 0.18 20 P1 TEH TEC 30 58 SCI TSH -0.04 0.25 125 0.95 0.15 86 P2 TSH TSH 30 58 DSI 04H -0.02 0.12 9

P1 TEH TEC 30 63 DSI 08H 0.07 0.15 142 P1 STH TEC 30 68 DSI 02H 0.20 0.20 25 P1 TEH TEC 31 14 DSI 04H 0.07 0.44 161 P1 TEH TEC 31 16 DNI 07H 0.00 1.28 51 P1 TEH TEC 31 18 DSI 07H -0.07 0.28 147 P1 TEH TEC 31 18 DSI 03H 0.00 0.46 54 P1 TEH TEC 31 18 DSI 02H -0.05 0.51 64 P1 TEH TEC 31 20 SCI TSH -0.11 0.25 42 0.32 0.07 105 P2 TSH TSH 31 22 DNI 06H 0.00 1.15 23 P1 TEH TEC 31 24 DNI 02H 0.10 1.40 12 P1 TEH TEC 31 24 DNI 08H -0.15 1.49 14 P1 TEH TEC 31 30 DNI 07H 0.00 1.59 12 P1 STH TEC 31 35 DNI 07H 0.13 1.73 9

P1 STH TEC 31 35 DNI 06H 0.00 1.30 18 P1 STH TEC 31 39 DNI 05H 0.00 1.30 44 P1 TEH TEC 31 52 DNI 06C 0.69 1.42 12 P1 TEH TEC 31 58 SAI SBH 1.30 0.19 28 0.21 2.65 100 P3 SBH STH 31 64 SCI TSH 0.00 0.00 85 0.65 0.17 52 P2 TSH TSH 31 68 DNI 05C 0.00 1.79 16 P1 TEH TEC 31 68 PCT AV3 0.44 30 2.49 23 P2 TEH TEC 31 68 PCT AV2 0.12 23 1.36 30 P2 TEH TEC 31 68 SCI TSH -0.13 0.08 63 0.48 0.12 109 P2 TSH TSH 31 69 PCT AV3 -0.10 16 0.81 342 P2 STH TEC 31 69 WAR AV3 -0.09 0.37 109 2

08C AV3 31 74 DSI 02H 0.12 0.46 143 P1 TEH TEC 31 74 SAI 02H 0.13 0.18 58 0.45 0.48 82 6

01H 02H 31 76 NQI 01C 3.85 0.21 120 3

TEH TEC 32 22 DSI 02H 0.00 0.18 64 P1 TEH TEC Page 32 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 32 27 DSI 03H -0.02 0.16 30 P1 TEH TEC 32 35 DSI 06H 0.05 0.10 126 P1 TEH TEC 32 36 DNI 02C -0.34 1.25 10 P1 TEH TEC 32 36 DNI 04H -0.22 0.99 28 P1 TEH TEC 32 38 DSI 03H -0.05 0.23 70 P1 STH TEC 32 38 DSI 02H -0.02 0.18 87 P1 STH TEC 32 44 VOL 01C 0.68 0.14 139 6

TSC 02C 32 44 PCT 01C 0.66 13 0.15 57 0.43 0.07 125 P4 TSC 02C 32 45 DSI 02H 0.02 0.22 78 P1 TEH TEC 32 48 VOL 01C 0.68 0.24 113 6

TSC 02C 32 48 PCT 01C 0.68 15 0.24 48 0.36 0.15 118 P4 TSC 02C 32 51 DSI 05H 0.02 0.16 109 P1 TEH TEC 32 53 DSI 03H -0.05 0.24 32 P1 TEH TEC 32 59 DSI 05H 0.25 0.33 110 P1 STH TEC 32 64 PCT AV3 -0.05 12 0.71 115 P2 TEH TEC 33 16 DNI 05H 0.05 1.22 21 P1 TEH TEC 33 18 DSI 02H 0.05 0.25 163 P1 TEH TEC 33 18 DSI 03H 0.02 0.21 29 P1 TEH TEC 33 22 DNI 06H 0.02 1.35 55 P1 TEH TEC 33 22 DSI 02H 0.02 0.17 155 P1 TEH TEC 33 22 DNI 07H 0.00 1.30 48 P1 TEH TEC 33 27 DNI 07H 0.00 1.42 45 P1 STH TEC 33 27 DSI 06H -0.07 0.29 126 P1 STH TEC 33 28 DNI 07H 0.02 1.32 48 P1 TEH TEC 33 42 DSI 05H 0.10 0.20 124 P1 TEH TEC 33 42 DSI 06H 0.05 0.98 52 P1 TEH TEC 33 42 SAI 06H 0.05 0.12 40 0.31 0.06 113 P4 06H 06H 33 44 VOL 01C 0.67 0.15 123 6

TSC 02C 33 44 PCT 01C 0.61 15 0.23 62 0.47 0.08 124 P4 TSC 02C 33 54 DSI 06H -0.10 0.21 123 P1 STH TEC 33 57 DSI 04H -0.02 0.27 16 P1 TEH TEC 33 63 DNI 06H 0.00 1.46 50 P1 STH TEC 33 68 SCI TSH -0.14 0.10 42 0.32 0.15 78 P2 TSH TSH 33 69 PCT AV2 -0.13 10 0.42 164 P2 TEH TEC 33 69 PCT AV3 0.00 17 0.91 20 P2 TEH TEC 33 70 DSI 05H 0.00 0.08 69 P1 TEH TEC 33 70 PCT AV1 0.18 22 1.36 20 P2 TEH TEC 33 74 PCT AV1 0.03 18 1.15 15 P2 TEH TEC 34 24 DSI 03H -0.02 0.11 110 P1 TEH TEC 34 26 DNI 04H 0.00 1.23 24 P1 TEH TEC Page 33 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 34 28 SCI TSH 0.00 0.13 34 0.26 0.15 72 P2 TSH TSH 34 33 DNI 02H 0.83 1.57 9

P1 TEH TEC 34 33 DNI 03H -0.10 1.14 55 P1 TEH TEC 34 33 DNI 04H 0.12 1.46 27 P1 TEH TEC 34 33 SCI TSH 0.02 0.25 125 0.95 0.22 52 P2 TSH 01H 34 38 DNI 06H -0.17 1.08 17 P1 TEH TEC 34 40 DSI 03H 0.00 0.21 108 P1 TEH TEC 34 41 DNI 04H 0.00 1.32 36 P1 TEH TEC 34 48 PCT AV2 0.00 22 1.60 192 P2 TEH TEC 34 48 PCT AV3 0.00 31 3.18 103 P2 TEH TEC 34 48 PCT AV3 3.37 17 1.10 148 P2 TEH TEC 34 48 WAR AV3 3.64 0.44 149 2

08C AV3 34 48 WAR AV3 0.00 0.84 121 2

08C AV3 34 52 DSI 02H -0.05 0.04 72 P1 STH TEC 34 52 PSI 03H -0.81 17.68 160 P5 STH TEC 34 53 DSI 02H 0.00 0.34 122 P1 STH TEC 34 56 DSI 05H -0.05 0.25 32 P1 TEH TEC 34 60 DSI 02H 0.07 0.20 76 P1 STH TEC 35 32 DNI 07H 0.17 1.30 12 P1 TEH TEC 35 34 SCI TSH -0.08 0.20 85 0.65 0.16 74 P2 TSH TSH 35 36 DSI 03H -0.10 0.20 62 P1 STH TEC 35 37 DNI 03H 0.15 1.39 10 P1 TEH TEC 35 38 DNI 03H 0.00 1.24 30 P1 TEH TEC 35 42 DNI 08C -0.07 1.39 14 P1 TEH TEC 35 42 DNI 02H 0.24 1.90 12 P1 TEH TEC 35 42 DNI 08H 0.00 2.01 16 P1 TEH TEC 35 45 DSI 02H -0.20 0.84 140 P1 STH TEC 35 45 DNI 04H 0.05 1.56 31 P1 STH TEC 35 45 DNI 05H 0.02 1.72 44 P1 STH TEC 35 45 DNI 06H 0.05 1.92 37 P1 STH TEC 35 45 DNI 07H 0.00 2.19 32 P1 STH TEC 35 45 DNI 08H -0.07 1.83 21 P1 STH TEC 35 47 DNI 07H 0.02 1.39 35 P1 STH TEC 35 54 CSI 07H -0.17 0.75 92 0.7 64.75 85 10 07H 07H 35 64 PCT AV3 0.00 14 0.87 197 P2 TEH TEC 35 64 PCT AV4 0.00 14 0.91 27 P2 TEH TEC 35 70 PCT AV3 -0.30 19 1.06 143 P2 TEH TEC 35 72 PCT AV3 -0.34 21 1.31 21 P2 TEH TEC 35 72 PCT AV1 0.33 22 1.39 44 P2 TEH TEC 36 23 DSI 08C 0.02 0.19 97 P1 TEH TEC Page 34 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 36 23 DNI 06H 0.12 1.47 25 P1 TEH TEC 36 28 DNI 07H 0.00 1.25 49 P1 TEH TEC 36 28 DSI 03H 0.00 0.25 109 P1 TEH TEC 36 28 DSI 04H 0.07 0.07 104 P1 TEH TEC 36 31 DNI 06H 0.20 1.43 22 P1 TEH TEC 36 33 HCI TSH 0.00 0.28 106 0.81 0.59 74 P2 TSH TSH 36 35 HCI TSH 0.00 0.20 108 0.82 0.41 92 P2 TSH TSH 36 36 SCI TSH -0.10 0.25 106 0.81 0.08 80 P2 TSH TSH 36 37 DNI 02H 0.12 1.38 16 P1 TEH TEC 36 37 DNI 03H 0.00 1.28 40 P1 TEH TEC 36 39 SCI TSH -0.09 0.20 106 0.81 0.14 73 P2 TSH TSH 36 44 DSI 03H -0.07 0.19 69 P1 TEH TEC 36 46 DNI 08H 0.02 1.30 55 P1 TEH TEC 36 46 DNI 07H 0.00 1.35 53 P1 TEH TEC 36 46 DSI 06H 0.00 0.18 83 P1 TEH TEC 36 49 DNI 07H 0.00 1.31 39 P1 TEH TEC 36 53 PCT AV3 0.21 24 1.88 204 P2 TEH TEC 36 56 DSI 07C 0.02 0.20 58 P1 TEH TEC 36 63 SCI TSH -0.09 0.18 80 0.61 0.13 98 P2 TSH TSH 36 63 SCI TSH -0.05 0.23 32 0.25 0.09 82 P2 TSH TSH 37 30 DSI 08H 0.02 0.13 34 P1 TEH TEC 37 39 DSI 02H -0.05 0.19 137 P1 TEH TEC 37 39 DSI 03H -0.05 0.22 118 P1 TEH TEC 37 41 SCI TSH -0.02 0.20 38 0.29 0.06 125 P2 TSH TSH 37 41 SCI TSH -0.08 0.17 71 0.54 0.13 123 P2 TSH TSH 37 42 DSI 03H 0.10 0.31 88 P1 TEH TEC 37 43 DNI 06H 0.12 1.71 22 P1 TEH TEC 37 43 DNI 07H 0.05 1.45 41 P1 TEH TEC 37 43 PCT AV1 0.25 20 1.32 43 P2 TEH TEC 37 43 DNI 03H -0.05 1.99 34 P1 TEH TEC 37 46 DNI 06H 0.02 1.50 37 P1 TEH TEC 37 46 DNI 08H 0.00 1.35 32 P1 TEH TEC 37 48 DNI 07H -0.02 1.27 39 P1 TEH TEC 37 48 DNI 06H 0.02 1.29 39 P1 TEH TEC 37 48 DNI 05H 0.00 1.28 51 P1 TEH TEC 37 48 DSI 04H -0.02 0.36 77 P1 TEH TEC 37 53 DNI 06H 0.12 1.67 11 P1 TEH TEC 37 53 DNI 07H -0.05 1.32 21 P1 TEH TEC 37 54 DNI 04H 0.00 1.49 47 P1 TEH TEC 37 54 DSI 05H 0.00 0.20 99 P1 TEH TEC Page 35 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 37 54 DNI 06H 0.00 1.40 51 P1 TEH TEC 37 54 DNI 08H 0.00 1.46 35 P1 TEH TEC 37 56 DNI 08H 0.00 1.54 36 P1 TEH TEC 37 56 DSI 02H -0.05 0.26 64 P1 TEH TEC 37 56 DNI 04H 0.00 1.65 51 P1 TEH TEC 37 56 DSI 03H 0.00 0.47 48 P1 TEH TEC 37 60 DNI 07C -0.23 1.58 18 P1 TEH TEC 37 65 SCI TSH 0.00 0.18 37 0.28 0.11 85 P2 TSH TSH 38 26 DNI 05H 0.22 1.61 17 P1 TEH TEC 38 37 DNI 07H 0.05 1.31 41 P1 TEH TEC 38 37 DNI 03H 0.00 1.67 29 P1 TEH TEC 38 37 DNI 04H 0.00 1.77 39 P1 TEH TEC 38 40 DSI 05H 0.00 0.32 127 P1 TEH TEC 38 44 DSI 02H 0.00 0.27 46 P1 STH TEC 38 45 DNI 06H -0.02 1.35 43 P1 TEH TEC 38 45 DNI 07H 0.07 1.50 42 P1 TEH TEC 38 48 DNI 05H 0.15 1.59 13 P1 TEH TEC 38 48 DNI 06H 0.27 1.90 8

P1 TEH TEC 38 48 DNI 07H 0.30 1.46 12 P1 TEH TEC 38 48 DNI 03H 0.00 1.66 16 P1 TEH TEC 38 52 DNI 06H -0.39 1.41 18 P1 TEH TEC 38 52 DNI 08H -0.02 1.30 38 P1 TEH TEC 38 52 DNI 03H 0.00 1.84 18 P1 TEH TEC 38 52 DNI 07H -0.10 1.93 24 P1 TEH TEC 38 57 SCI TSH -0.07 0.12 114 0.87 0.07 108 P2 TSH TSH 38 58 SCI TSH -0.10 0.25 88 0.67 0.13 125 P2 TSH TSH 38 61 DNI 08H 0.00 1.15 16 P1 TEH TEC 38 63 SCI TSH -0.09 0.23 31 0.23 0.18 94 P2 TSH TSH 38 64 PCT AV2 0.00 28 2.56 140 P2 TEH TEC 38 64 PCT AV3 0.00 25 2.12 221 P2 TEH TEC 38 72 PCT AV2 0.05 14 1.01 80 P2 TEH TEC 38 72 PCT AV1 0.05 16 1.23 25 P2 TEH TEC 39 23 DSI 02H 0.00 1.04 12 P1 TEH TEC 39 30 DSI 03H 0.10 0.12 137 P1 TEH TEC 39 31 DNI 04H 0.00 1.32 20 P1 TEH TEC 39 32 SCI TSH -0.03 0.19 60 0.46 0.08 63 P2 TSH TSH 39 38 PCT AV3 -0.29 19 1.10 23 P2 TEH TEC 39 38 SCI TSH 0.00 0.14 122 0.93 0.13 111 P2 TSH TSH 39 39 DNI 06H 0.00 1.18 49 P1 TEH TEC 39 39 DNI 05H 0.05 1.18 51 P1 TEH TEC Page 36 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 39 39 DNI 07H 0.00 1.39 39 P1 TEH TEC 39 39 DNI 04H 0.00 1.28 52 P1 TEH TEC 39 39 DNI 08H 0.00 1.26 42 P1 TEH TEC 39 42 DSI 02H -0.02 0.29 44 P1 TEH TEC 39 46 DNI 03H 0.02 1.25 49 P1 TEH TEC 39 46 DSI 02H -0.05 0.20 156 P1 TEH TEC 39 47 DSI 02H 0.05 0.36 145 P1 TEH TEC 39 50 DSI 04H 0.02 0.17 147 P1 TEH TEC 39 66 DNI 08H 0.00 1.39 42 P1 TEH TEC 39 68 PCT AV1 -0.20 14 0.73 300 P2 TEH TEC 39 69 PCT AV1 0.16 13 0.83 44 P2 TEH TEC 40 29 DSI 02H -0.12 0.20 109 P1 TEH TEC 40 33 DNI 08H 0.02 1.36 34 P1 TEH TEC 40 37 DSI 03H 0.02 0.58 91 P1 TEH TEC 40 39 DNI 07H 0.00 1.50 12 P1 TEH TEC 40 44 DNI 05H 0.02 1.43 42 P1 TEH TEC 40 44 DSI 06C -0.02 0.12 111 P1 TEH TEC 40 49 DNI 03H -0.07 1.42 33 P1 TEH TEC 40 51 DNI 04H 0.02 1.44 54 P1 TEH TEC 40 53 MCI TSH -0.07 0.10 40 0.31 0.17 104 P2 TSH TSH 40 54 DNI 04H 0.05 1.61 48 P1 TEH TEC 40 54 DNI 08C 0.02 1.40 23 P1 TEH TEC 40 56 DNI 06H 0.02 1.25 39 P1 TEH TEC 40 56 DNI 07H -0.05 1.35 32 P1 TEH TEC 40 65 PCT AV3 0.21 29 2.48 126 P2 TEH TEC 40 66 PCT AV3 -0.10 14 1.04 148 P2 TEH TEC 40 66 PCT AV1 0.79 21 1.89 54 P2 TEH TEC 40 69 PCT AV2 -0.08 17 1.25 123 P2 TEH TEC 40 69 PCT 03C -0.24 11 0.38 136 P1 TEH TEC 40 69 PCT AV3 0.00 23 1.94 37 P2 TEH TEC 40 69 PCT AV4 -0.18 35 4.26 75 P2 TEH TEC 40 69 VOL 03C -0.31 0.28 49 0.38 0.20 123 6

03C 04C 40 71 PCT 02C -0.17 25 0.96 127 P1 TEH TEC 40 71 VOL 02C -0.03 0.32 49 0.38 0.58 94 6

02C 02C 41 27 DSI 03H -0.05 0.17 160 P1 TEH TEC 41 32 DNI 05H -0.02 1.30 21 P1 TEH TEC 41 33 DNI 05H 0.25 1.62 20 P1 TEH TEC 41 33 DNI 06H 0.25 1.25 21 P1 TEH TEC 41 41 SCI TSH 0.00 0.19 91 0.69 0.07 105 P2 TSH TSH 41 52 DNI 08H 0.00 1.40 45 P1 TEH TEC Page 37 of 38

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21A (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 41 52 DNI 04H 0.00 1.44 53 P1 TEH TEC 41 52 DNI 03H 0.00 1.56 42 P1 TEH TEC 41 53 PCT AV1 0.23 16 0.94 140 P2 TEH TEC 41 53 DNI 03H 0.00 1.36 55 P1 TEH TEC 41 68 PCT AV2 0.07 16 0.88 41 P2 TEH TEC 42 37 PCT AV3 0.00 23 1.90 31 P2 TEH TEC 42 55 PSI 07H -0.67 17.14 170 P5 TEH TEC 42 64 DSI 04H 0.02 0.16 88 P1 TEH TEC 43 42 PCT AV1 0.00 19 1.41 40 P2 TEH TEC 43 44 DNI 04H 0.00 1.35 51 P1 TEH TEC 43 45 DNI 04H -0.02 1.32 7

P1 TEH TEC 43 50 DNI 03H 0.00 1.67 24 P1 TEH TEC 43 50 DNI 08H 0.00 1.27 47 P1 TEH TEC 43 54 DNI 04H -0.12 1.26 23 P1 TEH TEC 43 56 PCT AV3 0.02 17 1.02 82 P2 TEH TEC 43 57 PCT AV1 0.18 16 0.79 75 P2 TEH TEC 43 57 DNI 02H 0.00 1.41 10 P1 TEH TEC 43 65 PCT AV1 0.18 17 0.90 31 P2 TEH TEC 44 35 DSI 03H -0.05 0.23 151 P1 TEH TEC 44 40 DSI 05C 0.15 0.14 132 P1 TEH TEC 44 42 PCT AV1 0.00 21 1.64 116 P2 TEH TEC 44 42 PCT AV2 -0.10 17 1.25 144 P2 TEH TEC 44 48 PCT AV2 -0.73 17 1.04 23 P2 TEH TEC 44 48 PCT AV1 -0.10 15 0.86 25 P2 TEH TEC 44 55 WAR AV4 0.41 0.31 126 2

08C AV3 44 55 WAR AV4 0.00 0.54 113 2

08C AV3 44 55 WAR AV3 0.16 0.57 115 2

08C AV3 44 55 PCT AV3 0.25 23 1.74 17 P2 TEH TEC 44 55 PCT AV4 -0.30 28 2.58 24 P2 TEH TEC 44 58 DSI 06H -0.05 0.17 139 P1 TEH TEC 45 37 PCT AV1 0.10 16 0.82 161 P2 TEH TEC 45 40 PCT AV1 0.13 35 3.99 100 P2 TEH TEC 45 48 DSI 08C 0.02 0.19 42 P1 TEH TEC 45 50 DNI 03C 0.17 1.29 14 P1 TEH TEC 45 55 DNI 02C -0.15 1.34 8

P1 TEH TEC 46 43 DNI 06C -0.25 1.71 10 P1 TEH TEC 46 52 DSI 06H -0.02 0.35 81 P1 TEH TEC Page 38 of 38

Unit #2 - 2R24 Steam Generator 180 Day Report Attachment B BEAVER VALLEY UNIT #2 2R24 SG EXAMINATION RESULTS 2RCS-SG21B TUBES WITH SERVICE INDUCED INDICATIONS

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 1

43 DSI 02H 0.00 0.60 122 P1 08H TEH 1

45 DNI 08H 0.00 1.57 45 P1 08H TEH 1

52 DSI 02H 0.00 0.19 91 P1 08H TEH 1

56 DSI 02H 0.29 0.27 115 P1 08H TEH 1

57 DSI 04H -0.07 0.35 22 P1 08H TEH 1

81 DSI 02H -0.02 0.22 134 P1 08H TEH 2

9 DNI 07H 0.00 1.45 53 P1 08H TEH 2

12 DNI 08C 0.02 1.89 40 P1 08C TEC 2

15 SAI 03H -0.03 0.24 72 0.55 0.17 100 6

03H 03H 2

15 DSI 03H 0.00 0.82 113 P1 08H TEH 2

15 DSI 02H 0.05 1.14 104 P1 08H TEH 2

27 DNI 08C 0.00 2.04 37 P1 08C TEC 2

28 DSI 02H 0.00 0.24 59 P1 08H TEH 2

33 DSI 03H 0.05 0.13 48 P1 08H TEH 2

54 SCI TSH -0.04 0.24 103 0.79 0.17 56 P2 TSH TSH 2

54 DSI 04H 0.02 0.10 68 P1 08H TEH 2

58 SCI TSH -0.17 0.15 126 0.96 0.12 117 P2 TSH TSH 2

63 DSI 04H 0.00 0.12 56 P1 08H TEH 2

65 DSI 03H 0.04 0.41 84 P1 08H TEH 2

65 DNI 04H 0.00 1.67 54 P1 08H TEH 2

67 DSI 06H 0.12 0.61 97 P1 08H TEH 2

69 DSI 05H 0.00 0.07 55 P1 08H TEH 2

70 DSI 05H 0.17 0.67 60 P1 08H TEH 2

73 DSI 05H 0.00 0.18 104 P1 08H TEH 2

73 DSI 03H 0.05 0.36 133 P1 08H TEH 2

73 DSI 04H 0.00 0.14 62 P1 08H TEH 2

75 DSI 02H 0.00 0.10 77 P1 08H TEH 2

94 DSI 04H 0.00 0.43 41 P1 08H TEH 3

31 DSI 02H 0.02 0.48 130 P1 08H TEH 3

32 DSI 03H 0.00 0.30 152 P1 08H TEH 3

42 DNI 07C 0.07 1.60 24 P1 08C TEC 3

43 SAI 02H 0.00 0.31 34 0.26 0.14 88 6

02H 02H 3

43 DNI 06H 0.02 1.43 48 P1 08H TEH 3

43 DSI 02H -0.02 0.38 91 P1 08H TEH 3

49 DSI 04C 0.00 0.50 151 P1 08C TEC 3

54 DSI 02H 0.00 0.51 108 P1 08H TEH 3

55 DSI 04H -0.02 0.37 77 P1 08H TEH 3

55 DSI 02H -0.14 0.51 111 P1 08H TEH 3

58 DSI 03H 0.00 0.32 97 P1 08H TEH 3

60 DSI 02H 0.00 0.38 96 P1 08H TEH 3

60 DSI 03H -0.02 0.55 93 P1 08H TEH Page 1 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 3

61 DNI 08H 0.00 1.42 32 P1 08H TEH 3

61 DSI 06H 0.00 0.48 141 P1 08H TEH 3

61 DNI 02H -0.29 1.19 45 P1 08H TEH 3

62 DSI 03H -0.15 0.48 75 P1 08H TEH 3

62 DSI 04H -0.10 0.21 113 P1 08H TEH 3

63 DSI 02H 0.00 0.61 63 P1 08H TEH 3

63 DSI 03H -0.07 0.45 64 P1 08H TEH 3

65 DSI 03H -0.12 0.78 98 P1 08H TEH 3

65 SAI 03H 0.18 0.18 55 0.42 0.07 107 2

03H 03H 3

72 DSI 03H 0.00 0.28 57 P1 08H TEH 3

88 DSI 07C 0.02 0.45 121 P1 08C TEC 3

88 DSI 04H 0.05 0.53 70 P1 08H TEH 3

89 DSI 04H 0.00 0.33 46 P1 08H TEH 4

12 SCI TSH 0.02 0.16 32 0.25 0.10 134 P2 TSH TSH 4

13 SCI TSH -0.06 0.15 78 0.6 0.07 92 P2 TSH TSH 4

23 DSI 02H 0.05 0.46 165 P1 08H TEH 4

23 DSI 06H -0.05 0.43 161 P1 08H TEH 4

29 DSI 02H 0.10 0.72 84 P1 08H TEH 4

32 DSI 03H 0.02 0.26 155 P1 08H TEH 4

33 SCI TSH -0.09 0.18 34 0.26 0.11 106 P2 TSH TSH 4

33 PSI 02H 0.63 17.01 167 P5 08H TEH 4

36 DSI 04H -0.13 0.70 133 P1 08H TEH 4

36 MAI 04H -0.03 0.19 46 0.35 0.17 113 2

03H 04H 4

36 MAI 04H 0.16 0.32 72 0.55 0.15 88 2

03H 04H 4

41 DNI 06C 0.00 1.32 34 P1 08C TEC 4

41 DSI 04H 0.00 0.11 74 P1 08H TEH 4

41 DSI 02H 0.00 0.51 101 P1 08H TEH 4

43 DSI 02H 0.02 0.16 16 P1 08H TEH 4

44 DSI 02H -0.05 0.23 59 P1 08H TEH 4

48 DSI 03H 0.00 0.48 44 P1 08H TEH 4

51 DSI 05C 0.02 0.29 105 P1 08C TEC 4

52 DSI 03H 0.02 0.43 59 P1 08H TEH 4

54 DSI 02H -0.12 0.85 100 P1 08H TEH 4

56 DSI 04H 0.05 0.30 156 P1 08H TEH 4

57 DSI 02H 0.10 0.34 118 P1 08H TEH 4

57 DSI 04H 0.00 0.26 143 P1 08H TEH 4

58 DSI 02C 0.02 0.49 146 P1 08C TEC 4

58 DSI 02H 0.00 0.53 138 P1 08H TEH 4

59 DSI 02H -0.06 0.57 81 P1 08H TEH 4

59 DSI 03H 0.00 0.42 65 P1 08H TEH 4

62 DNI 05H 0.00 1.25 54 P1 08H TEH Page 2 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 4

62 DSI 07H -0.05 0.26 12 P1 08H TEH 4

62 DSI 03H -0.02 0.17 88 P1 08H TEH 4

63 DSI 04H -0.07 0.18 68 P1 08H TEH 4

68 DSI 02H 0.00 0.36 92 P1 08H TEH 4

88 DSI 04H -0.03 0.31 34 P1 08H TEH 5

10 DSI 02H -0.05 0.32 114 P1 TEH TEC 5

12 DSI 03H 0.00 0.12 83 P1 TEH TEC 5

13 DNI 08H 0.00 1.27 55 P1 TEH TEC 5

14 DSI 03H -0.02 0.30 67 P1 TEH TEC 5

16 DNI 08H 0.00 1.00 35 P1 TEH TEC 5

20 DSI 03H 0.00 0.25 97 P1 TEH TEC 5

22 DSI 04H 0.05 0.07 106 P1 TEH TEC 5

26 SAI 05H -0.03 0.13 71 0.54 0.07 78 P4 05H 06H 5

26 DSI 05H -0.03 0.98 33 P1 TEH TEC 5

27 SCI TSH -0.07 0.23 60 0.46 0.11 124 P2 TSH TSH 5

28 DSI 02H 0.00 0.30 69 P1 TEH TEC 5

30 DNI 08H 0.00 1.29 52 P1 TEH TEC 5

32 DNI 08H -0.20 1.36 22 P1 TEH TEC 5

33 DSI 02H -0.10 0.42 107 P1 TEH TEC 5

48 SCI TSH -0.12 0.18 58 0.45 0.08 103 P2 TSH TSH 5

49 SCI TSH 0.00 0.18 46 0.35 0.17 73 P2 TSH TSH 5

50 DNI 05H 0.00 1.31 48 P1 TEH TEC 5

52 DSI 02H 0.02 0.52 61 P1 TEH TEC 5

54 DSI 03H -0.02 0.29 69 P1 TEH TEC 5

54 DSI 07C 0.07 0.50 122 P1 TEH TEC 5

54 DSI 02H 0.10 0.24 102 P1 TEH TEC 5

56 DSI 03H 0.02 0.44 57 P1 TEH TEC 5

58 DSI 02H 0.02 0.18 101 P1 TEH TEC 5

59 DNI 06H 0.00 1.53 54 P1 STH TEC 5

59 DSI 04H 0.00 0.30 45 P1 STH TEC 5

59 DNI 07H 0.00 1.52 51 P1 STH TEC 5

60 DSI 02H -0.07 0.21 156 P1 TEH TEC 5

62 DSI 03H 0.02 0.33 76 P1 TEH TEC 5

63 DSI 04H 0.00 0.21 143 P1 TEH TEC 5

64 DSI 03H 0.02 0.16 75 P1 TEH TEC 5

64 DSI 02H -0.02 0.26 103 P1 TEH TEC 5

68 DSI 02H 0.02 0.28 95 P1 TEH TEC 5

70 DSI 05H 0.12 0.93 32 P1 TEH TEC 5

71 DSI 06C 0.00 0.45 108 P1 TEH TEC 5

71 DSI 02H -0.02 0.36 96 P1 TEH TEC 5

73 DSI 04H -0.02 0.50 105 P1 TEH TEC Page 3 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 5

73 DSI 02H 0.00 0.28 65 P1 TEH TEC 5

75 DSI 03H 0.00 0.16 36 P1 TEH TEC 5

75 DSI 04H 0.02 0.31 170 P1 TEH TEC 5

81 DSI 05H -0.02 0.11 23 P1 TEH TEC 5

82 DNI 08H 0.00 1.45 54 P1 TEH TEC 5

84 DNI 06H -0.02 1.27 55 P1 TEH TEC 5

92 DSI 02H -0.07 0.23 63 P1 TEH TEC 5

93 DSI 03H 0.12 0.31 135 P1 TEH TEC 6

16 DSI 03H -0.02 0.12 96 P1 TEH TEC 6

23 DSI 04H 0.05 0.24 146 P1 TEH TEC 6

25 DSI 03H 0.00 0.31 108 P1 TEH TEC 6

26 DSI 02H 0.02 0.20 93 P1 TEH TEC 6

27 SAI 03H -0.02 0.41 48 0.36 0.16 130 P4 03H 03H 6

27 DSI 03H 0.00 0.22 94 P1 TEH TEC 6

30 DSI 02H 0.05 0.48 70 P1 TEH TEC 6

31 MAI 03H 0.00 0.56 155 1.19 0.24 104 P4 03H 03H 6

31 DSI 03H 0.02 0.54 93 P1 TEH TEC 6

35 DSI 03H 0.05 0.61 35 P1 TEH TEC 6

35 MCI TSH 0.02 0.18 175 1.34 0.29 83 P2 TSH TSH 6

35 SAI 03H 0.00 0.14 29 0.22 0.24 96 6

02H 03H 6

36 DSI 04H 0.02 0.38 87 P1 TEH TEC 6

36 SAI 04H 0.00 0.31 65 0.49 0.21 109 6

03H 04H 6

36 HAI TSH 0.00 0.21 88 0.67 1.12 24 6

TSH TSH 6

36 MCI TSH -0.02 0.31 151 1.15 2.51 54 P2 TSH TSH 6

38 DSI 02H 0.00 0.47 137 P1 STH TEC 6

42 DSI 02H 0.02 0.78 113 P1 TEH TEC 6

42 HAI 02H -0.16 0.23 69 0.53 0.51 92 6

TSH 02H 6

42 HAI 02H 0.16 0.43 77 0.59 0.45 103 6

TSH 02H 6

43 DSI 03H 0.02 0.41 43 P1 STH TEC 6

52 DSI 02H -0.05 0.17 153 P1 TEH TEC 6

53 DSI 02H -0.05 0.33 27 P1 TEH TEC 6

53 DSI 03H -0.02 0.05 160 P1 TEH TEC 6

58 DSI 02H 0.05 0.49 75 P1 TEH TEC 6

58 DSI 03H 0.00 0.22 65 P1 TEH TEC 6

59 DSI 08C 0.00 0.16 160 P1 TEH TEC 6

59 HAI TSH 0.01 0.15 46 0.35 0.39 35 6

TSH TSH 6

59 SAI 08C 0.00 0.56 34 0.26 0.13 115 2

08C 08H 6

61 DSI 08H 0.07 0.14 116 P1 TEH TEC 6

63 DSI 02H -0.02 0.19 96 P1 TEH TEC 6

66 DSI 05H 0.00 0.10 36 P1 TEH TEC 6

66 DSI 03H 0.00 0.74 35 P1 TEH TEC Page 4 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 6

70 DSI 05H 0.10 0.84 101 P1 STH TEC 7

25 DNI 08H 0.02 1.27 48 P1 TEH TEC 7

29 DNI 08H -0.02 1.40 43 P1 TEH TEC 7

40 NQI TSH 0.22 0.72 31 P1 TEH TEC 7

40 SCI TSH -0.02 0.26 43 0.33 0.27 109 P2 TSH TSH 7

40 HAI TSH 0.22 0.26 43 0.33 0.40 151 6

TSH TSH 7

43 HAI TSH 0.54 0.13 46 0.35 0.13 58 6

TSH TSH 7

52 DSI 02H 0.00 0.61 42 P1 STH TEC 7

54 DSI 02H -0.09 0.10 39 P1 TEH TEC 7

56 SCI TSH -0.03 0.20 118 0.9 0.21 110 P2 TSH TSH 7

56 DSI 02H 0.05 0.63 110 P1 TEH TEC 7

56 DSI 06C 0.02 0.21 122 P1 TEH TEC 7

63 DSI 07H -0.02 0.17 41 P1 TEH TEC 7

64 DSI 04H -0.05 0.20 68 P1 TEH TEC 7

64 DNI 02C -0.05 1.32 11 P1 TEH TEC 7

64 DNI 06H -0.02 1.35 50 P1 TEH TEC 7

70 DSI 04H -0.05 0.37 43 P1 TEH TEC 7

70 DSI 05H -0.07 0.38 141 P1 TEH TEC 7

75 DSI 02H -0.05 0.08 73 P1 TEH TEC 8

2 DSI 03H 0.00 0.19 69 P1 TEH TEC 8

3 DSI 06H 0.02 0.33 95 P1 TEH TEC 8

9 DSI 02H 0.00 0.27 146 P1 TEH TEC 8

9 DSI 03H 0.02 0.31 157 P1 TEH TEC 8

12 SCI TSH -0.09 0.20 25 0.19 0.08 70 P2 TSH TSH 8

18 DSI 02H -0.02 0.25 58 P1 TEH TEC 8

18 DSI 03H -0.05 0.24 68 P1 TEH TEC 8

20 DSI 02H 0.05 0.34 164 P1 TEH TEC 8

21 DNI 07C -0.02 1.26 55 P1 TEH TEC 8

22 DSI 02H -0.02 0.46 168 P1 TEH TEC 8

31 DSI 07C 0.00 0.33 88 P1 TEH TEC 8

37 DSI 03H 0.05 0.31 11 P1 STH TEC 8

43 DNI 07C -0.02 1.29 40 P1 TEH TEC 8

47 HAI TSH 0.54 0.15 37 0.28 0.11 110 6

TSH 02H 8

53 DSI 02H -0.05 1.44 100 P1 STH TEC 8

53 DSI 03H 0.02 0.19 120 P1 STH TEC 8

56 DSI 03H -0.07 0.43 74 P1 STH TEC 8

56 DSI 08H -0.10 0.27 128 P1 STH TEC 8

57 DSI 08H -0.05 0.29 140 P1 STH TEC 8

57 SAI 08H 0.00 0.32 29 0.22 0.15 113 2

08C 08H 8

59 DSI 02H 0.10 0.21 101 P1 STH TEC 8

59 DSI 05H -0.02 0.15 55 P1 STH TEC Page 5 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 8

63 DSI 04H -0.05 0.41 23 P1 TEH TEC 8

66 DNI 06C 0.02 1.34 29 P1 TEH TEC 8

67 SCI TSH -0.10 0.18 80 0.61 0.15 124 P2 TSH TSH 8

70 SCI TSH -0.11 0.13 38 0.29 0.15 75 P2 TSH TSH 8

77 SCI TSH -0.10 0.14 22 0.16 0.09 59 P2 TSH TSH 9

4 DSI 03H 0.00 0.42 108 P1 TEH TEC 9

4 SAI 03H 0.00 0.32 57 0.43 0.23 102 6

03H 03H 9

5 DSI 03H 0.00 0.14 124 P1 TEH TEC 9

8 DSI 03H 0.07 0.20 97 P1 TEH TEC 9

10 SCI TSH 0.00 0.08 38 0.29 0.09 115 P2 TSH TSH 9

11 DSI 02H 0.02 0.39 156 P1 TEH TEC 9

11 DSI 03H 0.00 0.35 65 P1 TEH TEC 9

16 DNI 07C 0.00 1.27 53 P1 TEH TEC 9

16 DSI 03H -0.02 0.12 57 P1 TEH TEC 9

17 DSI 03H -0.07 0.30 149 P1 TEH TEC 9

17 DSI 02H 0.02 0.34 71 P1 TEH TEC 9

18 DSI 03H 0.00 0.43 25 P1 TEH TEC 9

18 DSI 02H -0.07 0.27 135 P1 TEH TEC 9

26 DSI 03H 0.02 0.51 53 P1 STH TEC 9

26 DSI 02H 0.00 0.21 139 P1 STH TEC 9

45 DSI 02H -0.10 0.87 107 P1 STH TEC 9

51 DNI 08H -0.02 0.99 44 P1 STH TEC 9

51 DNI 02H 0.00 1.60 55 P1 STH TEC 9

52 DSI 02H -0.05 0.14 29 P1 STH TEC 9

52 DSI 03H -0.02 0.26 22 P1 STH TEC 9

59 DSI 05H 0.02 0.30 110 P1 TEH TEC 9

59 DSI 03H -0.05 0.21 75 P1 TEH TEC 9

61 DSI 07C -0.02 0.42 127 P1 TEH TEC 9

64 SAI 04H 0.00 0.13 48 0.36 0.14 67 6

04H 04H 9

64 DSI 04H 0.02 0.40 51 P1 TEH TEC 9

70 DSI 05H -0.02 0.33 136 P1 STH TEC 9

70 DSI 03H 0.00 0.15 139 P1 STH TEC 9

72 DSI 04H 0.00 0.27 139 P1 STH TEC 9

77 DSI 04H -0.02 0.15 18 P1 TEH TEC 9

80 DNI TSC 1.63 0.32 151 5

TEH TEC 9

80 DSI 02H -0.02 0.42 73 P1 TEH TEC 9

85 DSI 02H -0.27 0.32 115 P1 TEH TEC 9

92 DNI 04H 0.10 1.15 52 P1 TEH TEC 9

92 DNI 07H 0.02 1.88 22 P1 TEH TEC 9

92 DSI 02H 0.02 0.32 120 P1 TEH TEC 9

93 DSI 02H -0.02 0.36 142 P1 TEH TEC Page 6 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 9

93 DNI 04H 0.00 1.44 15 P1 TEH TEC 10 6

DSI 04H 0.00 0.31 151 P1 TEH TEC 10 6

DSI 02H 0.02 0.48 144 P1 TEH TEC 10 6

SAI 04H 0.00 0.22 63 0.48 0.06 75 P4 04H 04H 10 7

DNI 08C -0.10 1.25 55 P1 TEH TEC 10 10 DSI 02H -0.05 0.02 24 P1 TEH TEC 10 14 DSI 02H 0.05 0.43 119 P1 STH TEC 10 15 DSI 02H 0.02 0.36 156 P1 TEH TEC 10 17 DSI 02H 0.00 0.61 129 P1 TEH TEC 10 18 DSI 02H -0.07 0.24 69 P1 TEH TEC 10 26 DSI 05H -0.05 0.27 132 P1 STH TEC 10 26 DSI 02H -0.05 0.31 25 P1 STH TEC 10 32 DSI 03H -0.02 1.03 129 P1 STH TEC 10 32 MAI 03H 0.15 0.27 52 0.4 0.14 104 2

03H 03H 10 32 MAI 03H -0.12 0.29 35 0.27 0.16 54 2

03H 03H 10 32 MAI 03H -0.04 0.37 71 0.54 0.11 77 2

03H 03H 10 37 DSI 03H 0.05 0.30 174 P1 TEH TEC 10 41 DSI 07H -0.05 0.15 99 P1 STH TEC 10 50 DSI 04H -0.05 0.12 131 P1 TEH TEC 10 50 DSI 02H 0.05 0.35 108 P1 TEH TEC 10 50 DSI 03H 0.05 0.20 115 P1 TEH TEC 10 52 DSI 02H 0.02 0.58 146 P1 TEH TEC 10 52 DSI 04H -0.05 0.22 55 P1 TEH TEC 10 53 DSI 02H 0.15 0.74 107 P1 TEH TEC 10 54 DSI 02H 0.00 0.13 151 P1 STH TEC 10 56 DSI 02H -0.05 0.62 116 P1 STH TEC 10 56 DSI 03H 0.07 0.12 99 P1 STH TEC 10 58 DSI 05H -0.02 0.12 106 P1 TEH TEC 10 63 DSI 02H -0.05 0.17 61 P1 TEH TEC 10 70 PCT AV4 0.00 11 0.99 37 P2 TEH TEC 10 70 WAR AV4 0.00 0.17 132 2

08H 08C 10 71 DSI 05H 0.00 0.45 166 P1 TEH TEC 10 71 DSI 02H -0.02 0.18 39 P1 TEH TEC 10 76 SAI 03H 0.00 0.28 45 0.34 0.13 106 6

03H 03H 10 76 DSI 03H 0.02 0.36 40 P1 TEH TEC 10 78 DSI 04H -0.02 0.39 149 P1 TEH TEC 10 80 DNI 08H 35.73 1.14 142 5

TEH TEC 10 80 DSI 03H 0.00 0.25 125 P1 TEH TEC 10 82 DSI 03H 0.05 0.17 38 P1 TEH TEC 10 88 DSI 04C 0.00 0.14 105 P1 TEH TEC 10 89 DSI 02H -0.02 0.30 46 P1 TEH TEC Page 7 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 11 8

DSI 04H -0.02 0.19 151 P1 TEH TEC 11 8

DSI 03H 0.02 0.17 88 P1 TEH TEC 11 9

DSI 06H 0.02 0.24 92 P1 TEH TEC 11 9

DSI 07H 0.00 0.44 36 P1 TEH TEC 11 10 DNI 07C 0.15 1.29 14 P1 TEH TEC 11 10 DNI 06H -0.02 1.22 55 P1 TEH TEC 11 17 DNI 08C 0.00 1.41 54 P1 TEH TEC 11 18 DSI 02H -0.02 0.40 86 P1 TEH TEC 11 20 DNI 04C -0.05 1.49 25 P1 TEH TEC 11 20 DSI 02H 0.05 0.42 114 P1 TEH TEC 11 20 DNI 06H 0.02 1.54 50 P1 TEH TEC 11 21 DSI 03H -0.22 0.31 109 P1 TEH TEC 11 23 SAI 02H -0.20 0.25 60 0.46 0.15 119 P4 02H 02H 11 23 SAI 02H -0.08 0.28 60 0.46 0.22 103 P4 02H 02H 11 23 SAI 02H 0.25 0.13 54 0.41 0.06 116 P4 02H 02H 11 23 DSI 02H 0.00 0.65 127 P1 TEH TEC 11 25 SAI 03H 0.07 0.41 51 0.39 0.13 118 P4 03H 03H 11 25 DSI 03H 0.02 0.43 88 P1 TEH TEC 11 35 DSI 02H -0.07 0.07 37 P1 TEH TEC 11 42 DNI 06H 0.00 1.25 49 P1 TEH TEC 11 42 DNI 07C 0.02 1.26 40 P1 TEH TEC 11 42 DSI 03H 0.00 0.15 81 P1 TEH TEC 11 51 DSI 02H 0.00 0.10 26 P1 STH TEC 11 52 DSI 07H 0.01 1.03 145 P1 STH TEC 11 52 SAI 07H 0.01 0.30 26 0.2 0.25 87 2

06H 07H 11 53 DSI 02H 0.00 0.44 123 P1 TEH TEC 11 53 DSI 08C 0.07 0.28 133 P1 TEH TEC 11 55 DSI 08H 0.00 0.31 107 P1 TEH TEC 11 55 DSI 02H -0.02 0.23 99 P1 TEH TEC 11 57 DSI 03H -0.05 0.20 58 P1 TEH TEC 11 57 DNI 08H 0.00 1.34 54 P1 TEH TEC 11 58 DSI 03H 0.00 0.47 87 P1 TEH TEC 11 58 DSI 04H 0.07 0.41 129 P1 TEH TEC 11 58 DNI 04C 0.00 1.21 46 P1 TEH TEC 11 59 DSI 02H 0.10 0.54 117 P1 TEH TEC 11 59 DSI 03H 0.02 0.64 40 P1 TEH TEC 11 59 DSI 04H 0.00 0.22 79 P1 TEH TEC 11 59 SCI TSH -0.17 0.18 75 0.58 0.13 119 P2 TSH TSH 11 59 SCI TSH -0.13 0.23 75 0.58 0.19 86 P2 TSH TSH 11 60 DSI 02H -0.02 0.42 105 P1 TEH TEC 11 60 DSI 03H 0.00 0.88 109 P1 TEH TEC Page 8 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 11 60 SCI TSH 0.00 0.13 38 0.29 0.11 101 P2 TSH TSH 11 60 SAI 03H 0.00 0.22 43 0.33 0.22 101 6

03H 04H 11 61 DSI 02H 0.00 1.02 65 P1 STH TEC 11 61 DSI 03H 0.07 0.69 96 P1 STH TEC 11 64 DSI 03H -0.02 0.33 87 P1 TEH TEC 11 64 DNI 06C 0.00 1.26 44 P1 TEH TEC 11 64 DNI 08C -0.02 1.30 55 P1 TEH TEC 11 75 DSI 02H -0.05 0.37 70 P1 TEH TEC 11 75 DSI 03H 0.02 0.30 96 P1 TEH TEC 11 78 DNI 08H 0.00 1.38 55 P1 TEH TEC 11 78 DNI 06H 0.02 1.72 51 P1 TEH TEC 11 83 DNI 08H 0.02 1.60 50 P1 TEH TEC 11 83 DSI 04H 0.02 0.18 98 P1 TEH TEC 11 83 DSI 03H 0.02 0.29 97 P1 TEH TEC 11 88 DNI 07C 0.00 1.39 43 P1 TEH TEC 11 91 DSI 08H 0.07 0.48 56 P1 TEH TEC 12 5

PCT AV4 0.00 12 0.68 157 P2 TEH TEC 12 8

SCI TSH 0.00 0.11 85 0.65 0.17 69 P2 TSH TSH 12 10 DSI 02H 0.00 0.29 74 P1 TEH TEC 12 13 SCI TSH -0.12 0.17 89 0.68 0.07 90 P2 TSH TSH 12 15 DSI 02H 0.05 0.33 137 P1 STH TEC 12 15 DSI 03H 0.00 0.61 95 P1 STH TEC 12 16 DSI 03H -0.05 0.24 151 P1 TEH TEC 12 22 DSI 02H 0.00 0.48 146 P1 TEH TEC 12 24 DSI 02H -0.05 0.48 123 P1 TEH TEC 12 24 DSI 04H 0.00 0.37 144 P1 TEH TEC 12 32 SAI 02H 0.13 0.18 49 0.38 0.12 58 P4 02H 03H 12 32 SAI 02H 0.00 0.15 42 0.32 0.07 64 P4 02H 03H 12 32 DSI 02H 0.00 0.98 61 P1 TEH TEC 12 51 SCI TSH 0.00 0.11 89 0.68 0.16 78 P2 TSH TSH 12 51 DSI 02H -0.02 0.10 126 P1 TEH TEC 12 52 DNI 07H 0.00 1.34 49 P1 STH TEC 12 52 DSI 02H -0.12 0.55 62 P1 STH TEC 12 52 DSI 03H 0.05 0.29 42 P1 STH TEC 12 54 SCI TSH -0.01 0.16 69 0.53 0.12 78 P2 TSH TSH 12 61 DSI 03H 0.07 0.32 33 P1 TEH TEC 12 63 DNI 06H -0.02 1.19 53 P1 TEH TEC 12 86 DNI 08H -0.02 1.32 47 P1 TEH TEC 12 86 SCI TSH -0.15 0.10 23 0.18 0.09 92 P2 TSH TSH 13 16 DSI 03H 0.02 0.23 99 P1 TEH TEC 13 16 DSI 06H -0.12 0.30 99 P1 TEH TEC Page 9 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 13 16 DSI 02H -0.02 0.77 138 P1 TEH TEC 13 16 MCI TSH -0.10 0.21 343 2.62 0.31 75 P2 TSH TSH 13 16 HAI TSH 0.21 0.13 45 0.34 0.23 73 6

TSH TSH 13 16 SAI 02H -0.21 0.10 37 0.28 0.07 72 P4 02H 02H 13 16 MAI 06H 0.03 0.13 38 0.29 0.08 64 P4 05H 06H 13 24 DNI 07H -0.02 1.29 54 P1 TEH TEC 13 37 DSI 03H 0.02 0.20 82 P1 TEH TEC 13 39 DSI 07H 0.00 0.10 89 P1 TEH TEC 13 47 SAI 02H -0.02 0.37 57 0.43 0.21 110 6

02H 02H 13 47 DSI 02H 0.10 0.26 114 P1 TEH TEC 13 53 DNI 08H 0.00 1.23 46 P1 STH TEC 13 53 DNI 06H 0.00 1.34 48 P1 STH TEC 13 53 DSI 02H 0.10 0.87 165 P1 STH TEC 13 55 SCI TSH -0.10 0.24 48 0.36 0.13 99 P2 TSH TSH 13 56 DNI 07H 0.00 1.29 54 P1 STH TEC 13 56 DSI 08H 0.00 1.02 48 P1 STH TEC 13 56 DSI 03H 0.07 0.24 28 P1 STH TEC 13 56 SAI 08H -0.02 0.33 42 0.32 0.22 102 2

08H 08H 13 66 DNI 05H 0.02 1.32 52 P1 TEH TEC 13 71 DSI 05C 0.00 0.31 140 P1 TEH TEC 13 72 DSI 03H 0.10 0.45 69 P1 TEH TEC 13 72 SCI TSH 0.00 0.21 57 0.43 0.27 76 P2 TSH TSH 13 73 DNI 08H -0.02 1.38 55 P1 TEH TEC 13 73 DSI 02H 0.00 0.24 101 P1 TEH TEC 13 77 DSI 03H -0.10 0.62 40 P1 STH TEC 13 78 DSI 06C 0.02 0.12 120 P1 TEH TEC 13 78 DSI 02H 0.00 0.04 105 P1 TEH TEC 13 82 SCI TSH -0.12 0.17 92 0.7 0.11 61 P2 TSH TSH 13 85 DSI 02H 0.00 0.29 74 P1 TEH TEC 13 86 DSI 02H 0.02 0.21 158 P1 TEH TEC 13 89 DNI 08H 0.00 1.33 54 P1 TEH TEC 13 91 DSI 02H -0.10 0.31 131 P1 TEH TEC 14 13 DSI 02H 0.02 0.17 74 P1 TEH TEC 14 15 DSI 03H -0.02 0.40 110 P1 TEH TEC 14 18 DSI 02H 0.05 0.44 114 P1 TEH TEC 14 25 DSI 02H 0.02 0.41 98 P1 TEH TEC 14 27 DSI 03H 0.00 0.13 77 P1 STH TEC 14 28 DSI 05H 0.00 0.09 51 P1 TEH TEC 14 32 DSI 02H -0.19 0.12 167 P1 TEH TEC 14 35 DSI 06H -0.05 0.28 149 P1 TEH TEC 14 36 DSI 03H 0.00 0.28 134 P1 TEH TEC Page 10 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 14 39 DSI 02H -0.02 0.07 157 P1 TEH TEC 14 54 DSI 02H -0.02 0.25 23 P1 TEH TEC 14 54 DSI 03H -0.05 0.14 76 P1 TEH TEC 14 55 DSI 02H -0.05 0.39 136 P1 TEH TEC 14 55 SCI TSH 0.02 0.10 26 0.2 0.23 133 P2 TSH TSH 14 57 DSI 02H -0.03 0.54 64 P1 STH TEC 14 57 DSI 03H -0.05 0.42 93 P1 STH TEC 14 59 DNI 03H 0.00 1.38 36 P1 TEH TEC 14 59 DNI 08H 0.02 1.44 38 P1 TEH TEC 14 59 DNI 08C -0.02 1.50 41 P1 TEH TEC 14 61 DSI 02H -0.02 0.46 124 P1 STH TEC 14 61 DSI 03H 0.00 0.64 39 P1 STH TEC 14 61 DSI 05H -0.02 0.28 43 P1 STH TEC 14 63 DSI 03H 0.05 0.32 18 P1 TEH TEC 14 64 DNI 06H 0.00 1.26 32 P1 TEH TEC 14 66 DNI 08H 0.02 1.38 48 P1 TEH TEC 14 66 DNI 07H 0.00 1.54 49 P1 TEH TEC 14 66 DNI 08C 0.02 1.21 52 P1 TEH TEC 14 66 DNI 05H 0.02 1.55 50 P1 TEH TEC 14 70 DSI 02H 0.05 0.55 111 P1 STH TEC 14 71 DNI 06H 0.00 1.70 50 P1 TEH TEC 14 80 DSI 03H 0.05 0.20 99 P1 TEH TEC 14 80 DNI 08C 0.00 1.27 55 P1 TEH TEC 14 83 DSI 03C -0.02 0.28 159 P1 STH TEC 14 84 DSI 04H -0.02 0.22 134 P1 TEH TEC 14 88 DSI 02H -0.05 0.16 23 P1 TEH TEC 15 12 DSI 03H 0.10 0.14 144 P1 STH TEC 15 16 DNI 08H 0.00 1.36 46 P1 TEH TEC 15 21 DSI 03H -0.05 0.14 94 P1 TEH TEC 15 26 DSI 07H -0.05 0.22 139 P1 TEH TEC 15 26 DSI 03H -0.05 0.38 145 P1 TEH TEC 15 27 DSI 02H 0.05 0.09 31 P1 TEH TEC 15 34 DNI 08C -0.12 1.28 10 P1 TEH TEC 15 36 DSI 02H -0.07 0.28 119 P1 TEH TEC 15 36 DNI 03H 0.07 1.65 43 P1 TEH TEC 15 43 DSI 06H -0.02 0.22 42 P1 STH TEC 15 49 DSI 04H -0.07 0.57 52 P1 TEH TEC 15 52 DSI 02H -0.05 0.18 45 P1 TEH TEC 15 60 DNI 08H 0.00 1.63 44 P1 TEH TEC 15 60 DNI 06H 0.05 1.76 45 P1 TEH TEC 15 60 DNI 03H 0.02 1.58 52 P1 TEH TEC Page 11 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 15 62 DNI 06H 0.05 1.23 55 P1 TEH TEC 15 63 SCI TSH 0.00 0.05 35 0.27 0.08 80 P2 TSH TSH 15 66 DSI 03H -0.07 0.69 60 P1 TEH TEC 15 66 DSI 02H -0.02 0.38 45 P1 TEH TEC 15 66 DNI 08H -0.22 1.44 15 P1 TEH TEC 15 66 SCI TSH -0.24 0.31 26 0.2 0.26 51 P2 TSH TSH 15 71 DSI 05H 0.02 0.17 28 P1 STH TEC 15 75 DSI 04H 0.10 0.19 25 P1 STH TEC 15 75 DSI 02H -0.05 0.17 161 P1 STH TEC 15 80 DSI 04H -0.02 0.36 173 P1 TEH TEC 15 87 DSI 02H -0.10 0.21 153 P1 TEH TEC 15 89 DSI 02H 0.12 0.39 133 P1 TEH TEC 15 89 DNI 04H -0.05 1.55 55 P1 TEH TEC 15 89 DNI 08H -0.05 1.27 55 P1 TEH TEC 16 12 DSI 04H 0.00 0.30 70 P1 STH TEC 16 12 SAI 04H -0.03 0.18 49 0.38 0.26 112 2

04H 04H 16 14 DSI 03H 0.02 0.49 105 P1 STH TEC 16 14 SAI 03H 0.04 0.30 65 0.49 0.24 101 2

03H 03H 16 26 DNI 08H 0.02 1.71 42 P1 STH TEC 16 26 DNI 07H 0.17 1.78 47 P1 STH TEC 16 27 DSI 02H 0.00 1.00 126 P1 STH TEC 16 27 DSI 03H -0.10 0.13 137 P1 STH TEC 16 27 SAI 02H 0.00 0.18 49 0.38 0.17 96 2

02H 03H 16 28 DNI 04H 0.15 1.59 21 P1 STH TEC 16 28 DNI 06H 0.00 1.45 17 P1 STH TEC 16 28 DNI 08H -0.07 1.27 18 P1 STH TEC 16 28 DNI 02H 0.00 1.37 29 P1 STH TEC 16 29 SAI 02H 0.01 0.41 42 0.32 0.08 118 P4 02H 03H 16 29 DSI 02H -0.12 0.09 103 P1 TEH TEC 16 30 PCT AV2 0.17 13 0.72 33 P2 TEH TEC 16 30 PCT AV3 0.17 11 0.59 130 P2 TEH TEC 16 31 DSI 07H 0.02 0.28 149 P1 TEH TEC 16 31 DSI 02H -0.14 0.17 154 P1 TEH TEC 16 32 HCI TSH -0.07 0.18 82 0.62 0.49 93 P2 TSH TSH 16 36 DSI 04H 0.02 0.24 57 P1 TEH TEC 16 37 DSI 02H 0.07 0.29 29 P1 STH TEC 16 37 DNI 03H 0.02 1.28 40 P1 STH TEC 16 37 DNI 07H 0.00 1.23 55 P1 STH TEC 16 37 DSI 04H -0.05 0.29 109 P1 STH TEC 16 37 SAI 04H -0.05 0.27 52 0.4 0.36 89 2

04H 04H 16 42 HAI TSH -0.01 0.18 152 1.16 0.70 52 6

TSH TSH Page 12 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 16 44 DSI 02H 0.00 0.33 1

P1 TEH TEC 16 45 DNI 06C 0.19 1.88 11 P1 TEH TEC 16 48 DNI 06H 0.00 1.56 28 P1 TEH TEC 16 55 DSI 04H 0.00 0.30 65 P1 STH TEC 16 55 DSI 05H 0.02 0.33 132 P1 STH TEC 16 57 SCI TSH 0.00 0.16 285 2.17 0.14 106 P2 TSH TSH 16 57 DSI 03H 0.05 0.10 141 P1 TEH TEC 16 60 DNI 07H 0.02 1.49 50 P1 TEH TEC 16 61 DSI 02H 0.00 0.28 32 P1 TEH TEC 16 62 DNI 07H -0.02 1.06 51 P1 TEH TEC 16 63 SCI TSH 0.00 0.21 146 1.12 0.17 78 P2 TSH TSH 16 66 DNI 08H 0.00 1.30 53 P1 TEH TEC 16 68 SAI 03H 0.00 0.28 66 0.51 0.30 70 6

02H 03H 16 68 DNI 04H 0.00 1.33 29 P1 TEH TEC 16 68 DNI 02H 0.00 1.29 28 P1 TEH TEC 16 68 DSI 03H -0.05 0.31 119 P1 TEH TEC 16 69 DNI 07H -0.02 1.34 47 P1 TEH TEC 16 71 DSI 02H 0.07 0.17 105 P1 TEH TEC 16 76 DNI 08H 0.02 1.27 32 P1 TEH TEC 16 77 SCI TSH -0.05 0.30 42 0.32 0.12 107 P2 TSH TSH 17 17 SCI TSH 0.00 0.38 69 0.53 0.08 65 P2 TSH TSH 17 25 DSI 03H -0.05 0.73 104 P1 STH TEC 17 25 DSI 02H 0.07 0.72 98 P1 STH TEC 17 25 SAI 03H -0.07 0.38 55 0.42 0.77 88 2

03H 03H 17 26 DSI 03H -0.05 1.10 103 P1 STH TEC 17 26 SAI 03H -0.11 0.38 63 0.48 1.18 85 2

03H 03H 17 28 DNI 03C 0.00 1.51 6

P1 TEH TEC 17 30 DSI 02H 0.05 0.62 104 P1 TEH TEC 17 30 DSI 03H -0.07 0.88 89 P1 TEH TEC 17 30 HCI TSH -0.01 0.26 108 0.82 0.23 119 P2 TSH TSH 17 31 DSI 03H 0.00 1.04 87 P1 STH TEC 17 31 DSI 02H -0.07 0.58 104 P1 STH TEC 17 31 SAI 03H 0.03 0.52 65 0.49 0.36 87 2

03H 03H 17 32 DSI 03H 0.00 0.47 119 P1 STH TEC 17 32 DSI 02H 0.12 1.11 96 P1 STH TEC 17 32 MAI 02H 0.19 0.35 106 0.81 0.29 116 2

02H 02H 17 35 DSI 03H 0.05 0.41 63 P1 TEH TEC 17 39 DSI 03H -0.05 1.09 100 P1 TEH TEC 17 39 MCI TSH 0.00 0.23 106 0.81 0.29 85 P2 TSH TSH 17 39 HAI 03H -0.05 0.15 54 0.41 0.26 92 6

03H 03H 17 40 DSI 03H -0.05 0.33 99 P1 STH TEC Page 13 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 17 40 SAI 03H -0.21 0.18 69 0.53 0.31 73 2

03H 03H 17 41 DSI 02H -0.26 0.95 111 P1 STH TEC 17 41 DSI 03H 0.00 0.63 120 P1 STH TEC 17 41 SAI 03H -0.03 0.00 98 0.75 0.60 103 2

03H 03H 17 42 DSI 03H 0.02 0.73 87 P1 STH TEC 17 42 DSI 02H -0.18 0.98 103 P1 STH TEC 17 42 DSI 04H 0.02 0.49 82 P1 STH TEC 17 42 DSI 06H 0.02 0.28 110 P1 STH TEC 17 42 MAI 06H -0.03 0.30 142 1.08 0.34 89 2

06H 07H 17 42 SAI 02H -0.18 0.32 65 0.49 0.11 98 2

02H 02H 17 43 DSI 04H 0.00 0.28 62 P1 STH TEC 17 43 DSI 02H 0.00 0.23 93 P1 STH TEC 17 44 DSI 02H 0.00 0.56 60 P1 STH TEC 17 44 SAI 02H -0.03 0.15 58 0.45 0.41 83 2

02H 02H 17 45 DSI 02H 0.07 0.89 100 P1 STH TEC 17 45 SAI 02H 0.20 0.30 65 0.49 1.14 73 2

02H 02H 17 49 DSI 03H 0.02 0.38 131 P1 TEH TEC 17 49 SCI TSH 0.05 0.21 38 0.29 0.24 101 P2 TSH TSH 17 49 SCI TSH 0.01 0.21 31 0.23 0.27 91 P2 TSH TSH 17 49 SCI TSH 0.02 0.16 35 0.27 0.16 96 P2 TSH TSH 17 60 DNI 05H -0.12 1.09 23 P1 TEH TEC 17 62 DNI 02H -0.06 1.90 31 P1 STH TEC 17 62 DNI 08C 0.00 1.25 8

P1 STH TEC 17 62 DNI 06H 0.00 1.45 46 P1 STH TEC 17 62 DSI 05H -0.05 0.29 23 P1 STH TEC 17 64 DSI 02H 0.00 0.07 127 P1 TEH TEC 17 68 DNI 05H 0.00 1.26 38 P1 STH TEC 17 68 DSI 04H 0.00 0.69 33 P1 STH TEC 17 68 DSI 03H -0.02 0.56 17 P1 STH TEC 17 68 DSI 02H 0.02 0.64 86 P1 STH TEC 17 68 DNI 07H 0.00 1.58 51 P1 STH TEC 17 68 SAI 04H 0.20 0.24 43 0.33 0.11 86 2

04H 04H 17 69 DNI 08H 0.00 1.67 11 P1 TEH TEC 17 70 DNI 07H 0.00 1.69 14 P1 TEH TEC 17 70 DNI 07C 0.00 2.12 9

P1 TEH TEC 17 77 DNI 08H 0.02 1.59 54 P1 TEH TEC 17 83 DSI 06C -0.02 0.37 146 P1 TEH TEC 17 88 DSI 07C 0.07 0.23 111 P1 TEH TEC 18 18 DSI 02H 0.02 0.19 69 P1 TEH TEC 18 21 DNI 06H 0.00 1.48 38 P1 TEH TEC 18 25 DSI 03H -0.07 0.36 98 P1 STH TEC Page 14 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 18 25 DSI 02H 0.07 0.57 105 P1 STH TEC 18 26 SCI TSH -0.05 0.10 28 0.21 0.11 98 P2 TSH TSH 18 26 SAI TSH 0.14 0.13 35 0.27 0.15 54 6

TSH TSH 18 26 SCI TSH 0.01 0.14 55 0.42 0.16 42 4

TSH TSH 18 26 SAI TSH 0.25 0.17 45 0.34 0.17 82 3

TSH TSH 18 28 DNI 03H -0.02 1.57 54 P1 STH TEC 18 28 DSI 04H 0.07 0.51 161 P1 STH TEC 18 29 DSI 02H -0.02 0.60 82 P1 TEH TEC 18 30 DSI 04H -0.02 0.27 115 P1 TEH TEC 18 31 DSI 02H 0.00 0.49 120 P1 TEH TEC 18 31 SCI TSH -0.01 0.27 138 1.06 0.16 88 P2 TSH TSH 18 36 DSI 03H 0.00 0.82 62 P1 TEH TEC 18 36 DNI 08C -0.02 1.28 48 P1 TEH TEC 18 37 DSI 03H -0.15 0.24 104 P1 TEH TEC 18 38 DSI 03H -0.05 0.30 29 P1 TEH TEC 18 40 DSI 02H -0.02 0.46 122 P1 TEH TEC 18 41 DSI 02H 0.07 1.29 96 P1 STH TEC 18 41 MAI 02H 0.05 0.38 151 1.15 0.65 111 2

01H 02H 18 42 DSI 02H 0.00 0.67 132 P1 TEH TEC 18 43 DSI 03H 0.07 0.12 69 P1 TEH TEC 18 43 DSI 02H 0.07 0.09 119 P1 TEH TEC 18 53 DSI 03H 0.05 0.38 64 P1 TEH TEC 18 53 DSI 04H 0.02 0.28 52 P1 TEH TEC 18 54 DSI 02H -0.07 0.65 34 P1 TEH TEC 18 56 DNI 07H -0.10 2.11 12 P1 TEH TEC 18 57 DSI 03H 0.07 0.12 109 P1 TEH TEC 18 58 DSI 02H -0.10 0.27 123 P1 TEH TEC 18 61 DSI 03H 0.02 0.09 111 P1 TEH TEC 18 63 SCI TSH -0.13 0.19 82 0.62 0.08 99 P2 TSH TSH 18 64 DSI 03H 0.12 1.16 97 P1 TEH TEC 18 65 DNI 07H 0.15 1.49 55 P1 TEH TEC 18 69 DSI 05H -0.02 0.15 39 P1 TEH TEC 18 69 DSI 04H 0.00 0.05 110 P1 TEH TEC 18 70 DNI 07H 0.00 1.45 46 P1 TEH TEC 18 72 DNI 04H 0.00 1.28 40 P1 TEH TEC 18 72 DNI 08H 0.17 1.30 27 P1 TEH TEC 18 74 DNI 08C 0.00 1.35 43 P1 TEH TEC 18 74 DSI 02H 0.00 0.19 51 P1 TEH TEC 18 76 DNI 07H 0.00 1.49 53 P1 TEH TEC 18 76 DSI 05H 0.02 0.40 17 P1 TEH TEC 18 76 DSI 03H 0.02 0.25 117 P1 TEH TEC Page 15 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 18 79 SCI TSH -0.07 0.14 40 0.31 0.20 128 P2 TSH TSH 18 83 DNI 08C -0.15 1.40 15 P1 TEH TEC 18 85 DNI 06H 0.00 1.30 32 P1 TEH TEC 19 15 DSI 02H 0.07 0.16 127 P1 TEH TEC 19 15 DSI 04H -0.02 0.13 48 P1 TEH TEC 19 16 DNI 08H -0.15 1.77 13 P1 TEH TEC 19 22 DSI 07H 0.08 1.07 159 1

STH TEC 19 22 SAI 07H 0.08 0.13 18 0.14 0.30 138 2

07H 08H 19 25 SAI TSH 0.03 0.18 80 0.61 0.16 106 6

TSH TSH 19 25 SAI TSH 0.10 0.23 45 0.34 0.13 102 6

TSH TSH 19 25 DNI 08H 0.00 1.58 44 P1 TEH TEC 19 29 DSI 02H -0.02 0.94 87 P1 TEH TEC 19 29 DSI 03H 0.02 0.65 70 P1 TEH TEC 19 30 DSI 03H 0.02 0.44 41 P1 TEH TEC 19 30 SAI 03H 0.11 0.00 182 1.39 0.13 99 6

03H 03H 19 33 DSI 02H 0.12 0.65 156 P1 TEH TEC 19 34 DSI 02H 0.12 0.29 110 P1 TEH TEC 19 34 SAI 02H 0.00 0.18 37 0.28 0.13 64 6

02H 02H 19 36 DNI 08C 0.00 1.28 49 P1 TEH TEC 19 36 DNI 05H 0.12 1.61 55 P1 TEH TEC 19 36 DSI 02H 0.07 0.57 85 P1 TEH TEC 19 38 SCI TSH 0.00 0.13 138 1.06 0.15 88 P2 TSH TSH 19 39 DSI 04H -0.02 0.44 77 P1 TEH TEC 19 39 DNI 08C -0.02 1.50 36 P1 TEH TEC 19 39 DNI 06H 0.00 1.47 55 P1 TEH TEC 19 39 DSI 03H -0.02 0.39 65 P1 TEH TEC 19 40 DSI 03H -0.07 0.48 89 P1 TEH TEC 19 45 DSI 02H 0.02 0.33 88 P1 TEH TEC 19 50 DSI 03H 0.05 0.51 62 P1 TEH TEC 19 51 DSI 03H 0.00 0.47 59 P1 TEH TEC 19 51 DSI 02H 0.10 0.44 99 P1 TEH TEC 19 52 DNI 08C -0.02 1.29 47 P1 TEH TEC 19 60 SCI TSH -0.09 0.15 32 0.25 0.06 104 P2 TSH TSH 19 69 DSI 02H -0.02 0.64 109 P1 STH TEC 19 71 DSI 05H -0.10 0.08 124 P1 TEH TEC 19 72 DNI 06H 0.00 1.62 55 P1 TEH TEC 19 74 DNI 08H 0.00 1.44 55 P1 TEH TEC 19 74 DSI 02H -0.07 0.19 167 P1 TEH TEC 19 76 DSI 02H 0.05 0.14 136 P1 TEH TEC 19 77 DNI 08C 0.00 1.34 47 P1 STH TEC 19 78 DSI 02H -0.10 0.11 142 P1 TEH TEC Page 16 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 19 83 NQI TSC 1.33 0.13 148 P1 TEH TEC 19 83 PCT TSC 1.35 10 0.18 20 0.15 0.06 87 6

TSC 01C 19 83 VOL TSC 1.35 0.08 74 6

TSC 01C 19 83 VOL TSC 0.37 0.08 78 6

TSC 01C 19 83 PCT TSC 0.37 12 0.18 25 0.19 0.08 78 6

TSC 01C 19 85 DSI 02H 0.00 0.22 167 P1 TEH TEC 19 89 DNI 07H 0.00 1.51 16 P1 TEH TEC 20 11 DNI 07H 0.07 1.53 22 P1 TEH TEC 20 11 DSI 02H 0.22 0.59 41 P1 TEH TEC 20 11 DNI 08H 0.00 1.64 10 P1 TEH TEC 20 11 DNI 06H -0.02 1.29 30 P1 TEH TEC 20 16 DSI 03H -0.05 0.30 49 P1 TEH TEC 20 18 DNI 08H 0.15 1.51 10 P1 TEH TEC 20 19 DSI 04H -0.02 0.05 110 P1 TEH TEC 20 20 DSI 04H 0.00 0.23 67 P1 TEH TEC 20 20 DSI 03H 0.00 0.29 48 P1 TEH TEC 20 22 SAI TSH 0.25 0.18 45 0.34 0.25 48 6

TSH TSH 20 23 DSI 02H 0.00 0.21 144 P1 STH TEC 20 23 SAI 02H -0.09 0.15 45 0.34 0.25 62 2

02H 02H 20 27 DSI 02H 0.00 0.21 93 P1 STH TEC 20 27 DSI 04H -0.12 0.47 110 P1 STH TEC 20 33 HCI TSH -0.08 0.23 94 0.72 0.54 86 P2 TSH TSH 20 34 DSI 03H 0.00 0.34 68 P1 TEH TEC 20 34 DSI 02H 0.07 0.41 76 P1 TEH TEC 20 34 HAI 02H -0.17 0.61 46 0.35 0.36 107 6

02H 03H 20 34 SAI 03H 0.06 0.13 45 0.34 0.18 81 6

02H 03H 20 34 MCI TSH 0.00 0.21 31 0.23 0.22 96 P2 TSH TSH 20 36 DSI 08H 0.00 0.38 29 P1 TEH TEC 20 70 DSI 02H -0.05 0.03 96 P1 TEH TEC 20 73 DNI 08H 0.02 1.47 35 P1 TEH TEC 20 76 DNI 07H 0.00 1.16 55 P1 STH TEC 20 78 DSI 04H 0.00 0.19 24 P1 TEH TEC 20 81 DSI 02H 0.05 0.29 169 P1 TEH TEC 20 82 SCI TSH 0.00 0.29 88 0.67 0.12 97 P2 TSH TSH 20 89 DSI 02H -0.02 0.55 101 P1 TEH TEC 21 10 DSI 03H 0.05 0.48 89 P1 TEH TEC 21 16 DNI 08H 0.15 1.58 13 P1 TEH TEC 21 18 DSI 04H 0.05 0.10 116 P1 TEH TEC 21 19 DSI 05H 0.00 0.20 51 P1 STH TEC 21 25 DSI 03H -0.10 0.98 130 P1 TEH TEC 21 25 SAI 03H -0.10 0.25 42 0.32 0.11 99 P4 02H 04H Page 17 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 21 25 HAI TSH 0.16 0.15 91 0.69 0.41 78 6

TSH TSH 21 29 DSI 03H 0.02 0.44 56 P1 TEH TEC 21 32 DSI 03H -0.02 0.63 47 P1 STH TEC 21 45 DSI 04H 0.00 0.40 151 P1 TEH TEC 21 45 DNI 03H 0.07 1.39 20 P1 TEH TEC 21 50 SCI TSH -0.18 0.10 86 0.66 0.10 59 P2 TSH TSH 21 50 SCI TSH -0.21 0.18 31 0.23 0.11 122 P2 TSH TSH 21 52 DNI 03H 0.00 1.20 35 P1 TEH TEC 21 52 DSI 02H 0.11 0.79 88 P1 TEH TEC 21 52 MCI TSH 0.00 0.23 72 0.55 0.18 106 P2 TSH TSH 21 52 HAI 02H 0.11 0.35 65 0.49 0.26 84 6

02H 03H 21 53 DSI 05H 0.02 0.19 110 P1 TEH TEC 21 53 DSI 03H 0.10 0.50 76 P1 TEH TEC 21 54 DNI 05H 0.02 1.59 51 P1 STH TEC 21 54 DSI 02H 0.02 0.61 34 P1 STH TEC 21 75 DSI 02H 0.10 0.32 160 P1 TEH TEC 21 77 SCI TSH -0.07 0.14 32 0.25 0.13 70 P2 TSH TSH 21 85 DSI 02H -0.07 0.45 150 P1 TEH TEC 22 18 SAI 03H 0.00 0.28 86 0.66 0.07 64 P4 03H 03H 22 18 DSI 03H 0.05 0.96 23 P1 TEH TEC 22 18 DNI 06H 0.00 1.40 30 P1 TEH TEC 22 36 DSI 03H 0.00 0.17 51 P1 TEH TEC 22 52 DSI 03H -0.10 0.16 136 P1 TEH TEC 22 52 DSI 02H -0.05 0.07 74 P1 TEH TEC 22 53 DNI 03H 0.00 1.10 42 P1 TEH TEC 22 53 DSI 02H -0.10 0.13 157 P1 TEH TEC 22 54 DNI 05H 0.05 1.03 54 P1 TEH TEC 22 58 DSI 02H -0.02 0.39 168 P1 TEH TEC 22 58 HAI TSH -0.12 0.21 71 0.54 0.60 39 6

TSH TSH 22 58 SCI TSH -0.09 0.15 32 0.25 0.31 115 P2 TSH TSH 22 61 DSI 05H 0.02 0.37 148 P1 TEH TEC 22 62 DSI 03H 0.05 0.23 37 P1 TEH TEC 22 63 DNI 04C 0.15 1.06 15 P1 TEH TEC 22 64 DSI 02H -0.07 0.23 100 P1 STH TEC 22 72 DNI 07H 0.00 1.29 53 P1 TEH TEC 22 75 SCI TSH -0.11 0.16 63 0.48 0.13 119 P2 TSH TSH 22 76 DNI 08C 0.12 1.38 12 P1 TEH TEC 23 33 DSI 03H 0.05 0.23 21 P1 TEH TEC 23 37 DSI 04H -0.02 0.69 22 P1 STH TEC 23 37 DNI 04C -0.07 1.75 10 P1 STH TEC 23 37 DSI 07H 0.00 1.07 19 P1 STH TEC Page 18 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 23 37 SAI 04H -0.02 0.22 46 0.35 0.34 102 2

04H 04H 23 37 SAI 07H -0.02 0.30 28 0.21 0.31 130 2

07H 07H 23 37 VOL 05C -0.32 0.19 92 6

05C 05C 23 37 PCT 05C -0.32 22 0.24 48 0.36 0.20 92 6

05C 05C 23 56 DSI 02H 0.00 0.40 161 P1 TEH TEC 23 58 SAI TSH 0.00 0.12 75 0.58 0.25 51 6

TSH TSH 23 59 DNI 06H -0.02 1.34 48 P1 TEH TEC 23 61 DSI 02H 0.00 0.13 44 P1 TEH TEC 23 63 DSI 03H 0.00 0.14 44 P1 TEH TEC 23 63 DSI 05H 0.00 0.28 136 P1 TEH TEC 23 67 DSI 05H 0.00 0.37 157 P1 TEH TEC 23 68 DNI 06H 0.00 1.45 55 P1 TEH TEC 23 86 PCT AV3 0.00 23 2.01 227 P2 TEH TEC 23 86 DSI 02H -0.02 0.14 123 P1 TEH TEC 24 13 DNI 08H 0.00 1.40 55 P1 TEH TEC 24 14 DNI 08H -0.02 1.57 34 P1 TEH TEC 24 16 DNI 08H 0.00 1.31 49 P1 TEH TEC 24 29 DSI 05H 0.10 0.08 154 P1 TEH TEC 24 30 DSI 03H 0.17 0.15 151 P1 TEH TEC 24 32 DSI 03H 0.00 0.31 111 P1 TEH TEC 24 42 DSI 02H 0.02 0.19 45 P1 TEH TEC 24 51 DSI 08H -0.05 0.11 121 P1 STH TEC 24 52 DSI 02H 0.02 0.30 82 P1 TEH TEC 24 56 DSI 02H -0.05 0.14 70 P1 TEH TEC 24 57 SCI TSH -0.12 0.16 37 0.28 0.11 101 P2 TSH TSH 24 58 SCI TSH -0.16 0.13 48 0.36 0.08 87 P2 TSH TSH 24 58 DSI 03H 0.00 0.25 121 P1 TEH TEC 24 62 DNI 08H 0.00 1.25 41 P1 TEH TEC 24 62 DSI 03H 0.02 0.43 78 P1 TEH TEC 24 63 DSI 03H -0.12 0.41 145 P1 TEH TEC 24 65 DNI 08H 0.00 1.29 41 P1 TEH TEC 24 65 DSI 02H 0.00 0.10 53 P1 TEH TEC 24 68 DSI 08H 0.03 0.26 30 P1 TEH TEC 24 71 DSI 05H 0.05 0.29 22 P1 TEH TEC 24 76 DNI 04H 0.00 1.27 53 P1 TEH TEC 24 79 DSI 07H 0.07 0.18 84 P1 TEH TEC 24 79 DNI 08H 0.00 1.34 45 P1 TEH TEC 24 84 DSI 05H -0.02 0.24 142 P1 TEH TEC 25 18 DSI 05C 0.02 0.19 90 P1 TEH TEC 25 18 DNI 06H 0.07 1.16 24 P1 TEH TEC 25 18 DNI 08H 0.00 1.33 35 P1 TEH TEC Page 19 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 25 21 DNI 08H 0.07 1.32 48 P1 TEH TEC 25 21 DNI 06H 0.07 1.28 51 P1 TEH TEC 25 23 DSI 03H 0.02 0.33 40 P1 TEH TEC 25 23 PCT AV3 0.10 14 0.85 102 P2 TEH TEC 25 24 DSI 03H 0.07 0.56 37 P1 TEH TEC 25 25 DNI 06H 0.02 1.36 52 P1 TEH TEC 25 29 DSI 02H 0.05 0.12 105 P1 TEH TEC 25 38 DSI 04H 0.05 0.12 127 P1 TEH TEC 25 42 DNI 06H 0.00 1.29 44 P1 TEH TEC 25 63 DNI 06H 0.07 1.33 27 P1 TEH TEC 25 64 DSI 06H 0.02 0.45 23 P1 TEH TEC 25 72 DSI 04H 0.00 0.27 74 P1 STH TEC 25 79 DSI 08H 0.00 0.67 150 P1 TEH TEC 25 79 SCI TSH -0.08 0.13 48 0.36 0.11 69 P2 TSH TSH 26 13 DNI 04H 0.00 1.92 11 P1 TEH TEC 26 16 DNI 08H 0.00 1.40 37 P1 TEH TEC 26 16 DNI 07H 0.00 1.26 48 P1 TEH TEC 26 20 DNI 06H -0.05 1.41 35 P1 TEH TEC 26 20 DNI 08H 0.02 1.28 25 P1 TEH TEC 26 30 DSI 03H 0.15 0.40 88 P1 TEH TEC 26 39 DSI 03H -0.07 0.06 96 P1 TEH TEC 26 58 SCI TSH -0.10 0.18 106 0.81 0.09 74 P2 TSH TSH 26 78 DSI 02H 0.05 0.16 104 P1 TEH TEC 27 17 DSI 05H -0.05 0.13 110 P1 TEH TEC 27 17 DNI 03H -0.07 1.28 52 P1 TEH TEC 27 17 DNI 07H 0.00 1.53 36 P1 TEH TEC 27 17 DNI 06H 0.00 1.36 47 P1 TEH TEC 27 18 DNI 08H 0.00 1.37 26 P1 TEH TEC 27 21 PCT AV2 0.21 22 1.71 248 P2 TEH TEC 27 21 PCT AV3 -0.12 17 1.09 151 P2 TEH TEC 27 22 DNI 08H 0.00 1.50 44 P1 TEH TEC 27 28 DSI 03H 0.00 0.31 26 P1 TEH TEC 27 34 DSI 02H 0.00 0.54 92 P1 TEH TEC 27 34 SAI 02H 0.00 0.33 46 0.35 0.11 68 6

02H 02H 27 46 DNI 08H 0.12 1.62 13 P1 TEH TEC 27 46 DSI 06H 0.02 0.12 44 P1 TEH TEC 27 52 DSI 04H -0.02 0.35 21 P1 TEH TEC 27 53 DSI 03H 0.05 0.19 11 P1 TEH TEC 27 56 SCI TSH 0.00 0.18 214 1.63 0.13 131 P2 TSH TSH 27 62 SCI TSH 0.00 0.13 54 0.41 0.11 119 P2 TSH TSH 27 68 DSI 02H 0.05 0.23 143 P1 TEH TEC Page 20 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 28 25 PCT 08H 0.72 17 0.18 48 0.36 0.17 105 6

08H 08H 28 25 SAI 04H 0.00 0.15 35 0.27 0.10 99 P4 02H 04H 28 25 VOL 08H 0.72 0.18 112 6

08H 08H 28 25 NQI 08H 0.79 0.44 98 3

TEH TEC 28 25 DSI 04H 0.00 0.98 118 P1 TEH TEC 28 33 DSI 02H -0.02 0.19 163 P1 STH TEC 28 33 DSI 03H 0.01 1.00 21 P1 STH TEC 28 33 SAI 03H 0.01 0.15 66 0.51 0.19 81 2

02H 03H 28 33 SAI 02H 0.04 0.30 46 0.35 0.25 79 2

02H 03H 28 55 SCI TSH 0.00 0.13 91 0.69 0.15 108 P2 TSH TSH 28 59 DSI 04H 0.00 0.58 66 P1 TEH TEC 28 60 DNI 04H -0.10 1.23 33 P1 TEH TEC 28 63 DSI 03H 0.00 0.27 93 P1 TEH TEC 28 67 DSI 03H 0.05 0.28 61 P1 STH TEC 28 70 PCT AV4 -0.19 23 1.80 32 P2 TEH TEC 28 70 PCT AV3 0.22 29 2.74 22 P2 TEH TEC 28 81 DSI 02H 0.00 0.25 156 P1 TEH TEC 29 18 DNI 04H -0.02 1.57 49 P1 TEH TEC 29 18 DNI 06H 0.15 1.59 24 P1 TEH TEC 29 20 DSI 03H 0.27 0.50 80 P1 TEH TEC 29 27 DSI 02H 0.02 0.27 63 P1 TEH TEC 29 27 DSI 03H 0.02 0.29 53 P1 TEH TEC 29 29 DSI 06H 0.09 0.99 70 1

STH TEC 29 29 DSI 04H -0.21 1.03 177 1

STH TEC 29 29 SAI 04H -0.21 0.13 25 0.19 0.25 134 2

04H 05H 29 29 SAI 06H 0.09 0.18 34 0.26 0.16 120 2

06H 08H 29 31 DSI 05H 0.02 0.29 142 P1 TEH TEC 29 32 DSI 03H 0.02 0.07 118 P1 TEH TEC 29 32 DSI 05H 0.00 0.26 61 P1 TEH TEC 29 34 DSI 03H 0.07 0.23 76 P1 TEH TEC 29 35 DSI 04H 0.10 0.16 94 P1 TEH TEC 29 35 SAI 04H 0.00 0.23 43 0.33 0.13 118 6

04H 06H 29 37 DSI 03H -0.10 0.28 177 P1 TEH TEC 29 38 DSI 02H 0.05 0.21 74 P1 TEH TEC 29 40 DSI 03H 0.02 0.70 69 P1 TEH TEC 29 41 DSI 02H 0.00 0.15 60 P1 TEH TEC 29 56 DSI 02H 0.15 1.26 90 P1 TEH TEC 29 57 DSI 02H 0.00 0.48 101 P1 STH TEC 29 57 SAI 02H -0.02 0.18 72 0.55 0.24 106 2

02H 02H 29 64 SCI TSH -0.12 0.15 34 0.26 0.11 115 P2 TSH TSH 29 67 SAI TSH -0.05 0.05 49 0.38 0.11 62 6

TSH TSH Page 21 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 30 16 DSI 04H 0.02 0.10 112 P1 TEH TEC 30 16 DSI 07H 0.02 0.14 37 P1 TEH TEC 30 20 DNI 08H 0.00 1.49 44 P1 TEH TEC 30 20 DSI 04H 0.00 0.25 93 P1 TEH TEC 30 20 SAI 04H 0.00 0.11 37 0.28 0.13 153 P4 04H 05H 30 20 SAI 04H 0.14 0.11 32 0.25 0.13 152 P4 04H 05H 30 24 SAI 06H 0.00 0.25 25 0.19 0.09 103 6

06H 06H 30 24 DSI 06H 0.02 0.32 18 P1 TEH TEC 30 27 DSI 02H -0.02 0.22 52 P1 TEH TEC 30 31 DNI 05H 0.02 1.31 49 P1 STH TEC 30 32 DSI 03H -0.02 0.27 164 P1 STH TEC 30 34 DNI 03C 0.00 1.49 7

P1 STH TEC 30 48 SAI 04H 0.00 0.15 42 0.32 0.09 65 P4 04H 04H 30 48 DSI 04H 0.05 0.32 170 P1 TEH TEC 30 50 DNI 07H 0.00 1.35 55 P1 TEH TEC 30 50 DSI 04H 0.00 0.23 49 P1 TEH TEC 30 53 PCT AV3 0.22 24 2.01 211 P2 TEH TEC 30 55 DSI 03H -0.10 0.12 164 P1 TEH TEC 30 56 DSI 04H -0.07 0.46 17 P1 STH TEC 30 59 DSI 04H -0.02 0.17 54 P1 TEH TEC 30 59 PCT AV3 0.07 23 1.91 31 P2 TEH TEC 30 59 PCT AV2 0.00 14 0.87 25 P2 TEH TEC 30 60 PCT AV3 0.00 19 1.04 24 P2 TEH TEC 30 60 SCI TSH -0.12 0.20 65 0.49 0.14 136 P2 TSH TSH 30 60 WAR AV3 0.00 0.26 90 2

08C AV3 30 78 DSI 02H 0.00 0.21 21 P1 TEH TEC 30 78 DSI 04H 0.00 0.23 21 P1 TEH TEC 30 79 DSI 02H 0.00 0.19 39 P1 TEH TEC 30 81 DSI 03H 0.02 0.15 124 P1 TEH TEC 31 21 DSI 07H 0.02 0.35 140 P1 TEH TEC 31 22 DNI 06H -0.02 1.61 55 P1 TEH TEC 31 23 DSI 02H 0.15 0.67 75 P1 TEH TEC 31 26 DNI 04H 0.10 1.24 55 P1 TEH TEC 31 26 DNI 08H 0.10 1.55 32 P1 TEH TEC 31 31 DNI 05H 0.02 1.34 55 P1 TEH TEC 31 32 DSI 03H 0.00 0.49 32 P1 STH TEC 31 32 DSI 05H -0.02 0.42 153 P1 STH TEC 31 32 DNI 02H -0.02 1.48 44 P1 STH TEC 31 35 SCI TSH 0.00 0.13 32 0.25 0.07 111 P2 TSH TSH 31 37 DSI 03H -0.02 0.29 56 P1 TEH TEC 31 39 DSI 02H 0.02 0.12 27 P1 TEH TEC Page 22 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 31 39 DSI 03H 0.02 0.36 37 P1 TEH TEC 31 41 PCT AV1 -0.02 17 1.05 139 P2 TEH TEC 31 41 PCT AV2 0.00 15 0.85 191 P2 TEH TEC 31 41 PCT AV3 0.00 21 1.57 64 P2 TEH TEC 31 48 DSI 02H 0.00 0.54 38 P1 STH TEC 31 52 DSI 02H -0.02 0.15 45 P1 TEH TEC 31 59 PCT AV1 0.00 14 0.87 18 P2 TEH TEC 31 59 PCT AV3 0.00 28 2.63 35 P2 TEH TEC 31 59 PCT AV4 0.00 21 1.56 19 P2 TEH TEC 31 59 PCT AV2 0.00 14 0.87 152 P2 TEH TEC 31 61 SCI TSH -0.14 0.18 60 0.46 0.16 138 P2 TSH TSH 31 66 DNI 06H 0.00 1.32 54 P1 TEH TEC 31 67 DNI 08C 0.00 1.30 21 P1 STH TEC 31 71 DSI 05H 0.07 0.17 55 P1 TEH TEC 31 75 DSI 04H 0.12 0.13 147 P1 TEH TEC 31 76 DSI 02H 0.00 0.30 89 P1 TEH TEC 31 78 DSI 03H 0.07 0.50 113 P1 TEH TEC 31 78 DSI 02H 0.00 0.42 149 P1 TEH TEC 32 16 DSI 08H -0.05 0.18 39 P1 TEH TEC 32 29 DSI 05H 0.07 0.38 133 P1 TEH TEC 32 31 DSI 02H -0.02 0.15 10 P1 TEH TEC 32 31 SAI 02H 0.00 0.13 34 0.26 0.09 77 6

01H 02H 32 33 DNI 05H 0.02 1.38 40 P1 TEH TEC 32 33 DNI 03H 0.00 1.78 45 P1 TEH TEC 32 35 DNI 06H 0.00 1.32 36 P1 TEH TEC 32 35 DNI 05H 0.00 1.46 49 P1 TEH TEC 32 35 DNI 04H 0.00 1.37 54 P1 TEH TEC 32 35 DNI 08H 0.00 1.35 26 P1 TEH TEC 32 46 DSI 04H 0.00 0.29 90 P1 STH TEC 32 50 PCT AV3 0.17 18 1.38 200 P2 TEH TEC 32 50 PCT AV2 0.67 27 2.59 219 P2 TEH TEC 32 50 PCT AV2 -0.73 28 2.86 227 P2 TEH TEC 32 50 PCT AV1 0.22 21 1.67 326 P2 TEH TEC 32 52 DSI 06H 0.00 0.21 93 P1 TEH TEC 32 53 DSI 02H -0.02 0.41 54 P1 TEH TEC 32 55 PCT AV4 -0.27 23 1.74 26 P2 TEH TEC 32 55 PCT AV3 0.42 28 2.63 37 P2 TEH TEC 32 55 DSI 05H 0.00 0.20 97 P1 TEH TEC 32 55 DSI 02H 0.00 0.25 104 P1 TEH TEC 32 57 PCT AV3 -0.17 21 1.64 30 P2 STH TEC 32 57 PCT AV2 -0.55 14 0.85 327 P2 STH TEC Page 23 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 32 57 PCT AV1 0.24 18 1.26 16 P2 STH TEC 32 57 WAR AV2 -0.55 0.30 128 2

08C AV2 32 57 WAR AV3 -0.24 0.40 124 2

08C AV2 32 59 PCT AV3 0.28 28 2.72 57 P2 STH TEC 32 61 DSI 02H 0.07 0.35 111 P1 TEH TEC 32 61 DSI 05H 0.07 0.44 149 P1 TEH TEC 32 64 PCT AV3 0.22 25 1.79 20 P2 TEH TEC 32 64 WAR AV3 0.22 0.24 91 2

08C AV3 32 77 DSI 02H 0.00 0.24 97 P1 TEH TEC 33 31 DSI 06H -0.05 0.04 50 P1 TEH TEC 33 31 DSI 07H 0.02 0.23 58 P1 TEH TEC 33 32 DSI 02H 0.10 0.24 169 P1 TEH TEC 33 36 SCI TSH 0.00 0.13 31 0.23 0.08 99 P2 TSH TSH 33 37 DSI 04H 0.05 0.21 153 P1 STH TEC 33 40 PCT AV3 0.02 22 1.61 83 P2 TEH TEC 33 40 PCT AV2 0.05 22 1.69 159 P2 TEH TEC 33 40 PCT AV1 0.05 19 1.25 67 P2 TEH TEC 33 41 PCT AV3 0.00 22 1.63 210 P2 TEH TEC 33 41 PCT AV2 0.00 32 3.50 222 P2 TEH TEC 33 41 PCT AV1 0.00 21 1.52 123 P2 TEH TEC 33 44 DSI 03H 0.07 0.15 114 P1 TEH TEC 33 44 DSI 02H 0.00 0.19 119 P1 TEH TEC 33 55 PCT AV2 -0.28 20 1.31 63 P2 TEH TEC 33 57 PCT AV2 -0.43 20 1.41 323 P2 STH TEC 33 57 PCT AV2 0.28 23 1.81 81 P2 STH TEC 33 57 PCT AV3 -0.17 18 1.20 32 P2 STH TEC 33 57 PCT AV1 0.00 18 1.20 150 P2 STH TEC 33 60 DSI 03H 0.00 0.07 24 P1 TEH TEC 33 62 DSI 02H 0.00 0.49 83 P1 TEH TEC 33 62 DNI 08H 0.00 1.34 47 P1 TEH TEC 33 62 DNI 07H -0.02 1.63 53 P1 TEH TEC 33 64 PCT AV2 0.20 12 0.64 261 P2 TEH TEC 33 65 PCT AV1 0.13 12 0.58 87 P2 TEH TEC 33 65 PCT AV2 0.08 21 1.48 149 P2 TEH TEC 33 73 DSI 07H 0.00 0.66 103 P1 TEH TEC 34 16 DSI 08H -0.05 0.09 61 P1 TEH TEC 34 18 DSI 08H 0.00 0.67 144 P1 TEH TEC 34 20 PCT AV2 0.05 16 0.94 349 P2 TEH TEC 34 20 WAR AV2 0.05 0.27 90 2

08H AV2 34 22 PCT AV2 0.27 18 1.15 42 P2 TEH TEC 34 22 PCT AV3 -0.05 17 1.04 199 P2 TEH TEC Page 24 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 34 22 PCT AV4 0.20 16 0.97 335 P2 TEH TEC 34 25 DNI 04H 0.20 1.27 18 P1 TEH TEC 34 26 DNI 07H 0.07 1.24 27 P1 TEH TEC 34 36 DNI 05H 0.07 1.41 26 P1 TEH TEC 34 37 DSI 03H 0.00 0.17 11 P1 TEH TEC 34 41 CSI 06C -0.23 0.75 120 0.92 68.92 81 10 06C 06C 34 48 DSI 02H 0.00 0.47 100 P1 TEH TEC 34 48 DSI 04H -0.02 0.17 93 P1 TEH TEC 34 48 DSI 03H -0.02 0.28 104 P1 TEH TEC 34 48 DNI 06H 0.00 1.41 55 P1 TEH TEC 34 50 PCT AV1 0.17 24 2.11 251 P2 TEH TEC 34 50 PCT AV3 -0.32 29 2.99 30 P2 TEH TEC 34 50 PCT AV4 -0.34 21 1.68 19 P2 TEH TEC 34 51 DSI 03H 0.02 0.34 118 P1 TEH TEC 34 51 DSI 02H 0.02 0.52 79 P1 TEH TEC 34 51 DNI 08H 0.00 1.80 53 P1 TEH TEC 34 57 SCI TSH -0.13 0.13 85 0.65 0.14 114 P2 TSH TSH 34 57 PCT AV2 0.36 22 1.59 145 P2 TEH TEC 34 57 DSI 02H -0.02 0.28 19 P1 TEH TEC 34 57 PCT AV3 -0.23 21 1.45 146 P2 TEH TEC 34 58 SCI TSH -0.15 0.15 86 0.66 0.12 126 P2 TSH TSH 35 19 PCT AV4 -0.15 19 1.39 325 P2 TEH TEC 35 21 PCT AV3 -0.14 23 1.87 20 P2 TEH TEC 35 36 DNI 07H 0.00 1.27 52 P1 STH TEC 35 40 PCT AV3 -0.37 40 5.98 43 P2 TEH TEC 35 40 PCT AV2 0.15 34 4.05 37 P2 TEH TEC 35 40 WAR AV2 0.15 0.89 120 2

08H AV2 35 40 WAR AV3 -0.37 0.94 109 2

08C AV3 35 41 PCT AV4 -0.10 29 2.91 56 P2 STH TEC 35 41 PCT AV1 -0.02 22 1.64 221 P2 STH TEC 35 41 PCT AV2 -0.54 24 2.04 33 P2 STH TEC 35 41 PCT AV2 0.46 34 4.18 46 P2 STH TEC 35 41 PCT AV3 -0.20 22 1.64 50 P2 STH TEC 35 41 PCT AV3 0.36 23 1.85 228 P2 STH TEC 35 50 PCT AV4 -0.06 18 1.35 31 P2 STH TEC 35 50 PCT AV1 0.00 29 3.04 266 P2 STH TEC 35 50 PCT AV2 0.00 22 1.80 51 P2 STH TEC 35 50 PCT AV3 0.00 26 2.50 251 P2 STH TEC 35 54 PCT AV1 -0.07 13 0.87 25 P2 TEH TEC 35 62 DNI 08H -0.05 1.34 35 P1 TEH TEC 35 66 SCI TSH 0.00 0.13 46 0.35 0.10 72 P2 TSH TSH Page 25 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 35 67 PCT AV2 -0.17 24 1.99 33 P2 TEH TEC 35 67 WAR AV2 -0.17 0.26 100 2

08H AV2 35 71 PCT AV4 0.00 17 1.16 96 P2 TEH TEC 35 71 PCT AV3 0.39 22 1.71 27 P2 TEH TEC 35 71 PCT AV2 -0.24 28 2.28 45 P2 TEH TEC 36 19 CSI 06H -0.03 0.75 182 1.39 73.16 86 10 06H 06H 36 20 CSI 06H -0.28 0.75 185 1.41 71.26 86 10 06H 06H 36 25 DSI 05H 0.05 0.20 31 P1 TEH TEC 36 27 PCT TSC 0.19 12 0.15 28 0.21 0.09 90 6

TSC TSC 36 27 VOL TSC 0.14 0.08 92 6

TSC TSC 36 42 DSI 03H 0.05 0.11 102 P1 TEH TEC 36 50 PCT AV2 0.45 17 1.23 19 P2 TEH TEC 36 50 PCT AV1 -0.29 22 1.86 211 P2 TEH TEC 36 54 DNI 07H 0.00 1.35 47 P1 STH TEC 36 55 PCT AV1 -0.22 13 0.70 165 P2 TEH TEC 36 55 PCT AV2 0.08 24 1.98 56 P2 TEH TEC 36 58 DSI 05H -0.02 0.12 67 P1 TEH TEC 36 59 PCT AV3 -0.36 22 1.67 20 P2 TEH TEC 36 59 PCT AV2 0.18 29 2.79 103 P2 TEH TEC 36 59 PCT AV1 0.13 25 2.03 16 P2 TEH TEC 37 24 DSI 05H 0.07 0.09 59 P1 TEH TEC 37 29 PCT AV2 0.25 32 3.45 33 P2 TEH TEC 37 29 PCT AV3 -0.20 18 1.20 156 P2 TEH TEC 37 29 PCT AV1 0.17 22 1.70 41 P2 TEH TEC 37 32 DSI 03H 0.22 0.68 55 P1 TEH TEC 37 41 PCT AV2 0.00 16 1.02 322 P2 TEH TEC 37 57 SCI TSH -0.08 0.00 103 0.79 0.14 102 P2 TSH TSH 37 57 PCT AV4 0.00 39 5.77 60 P2 TEH TEC 37 57 PCT AV3 0.39 42 7.09 50 P2 TEH TEC 37 57 PCT AV2 0.54 27 2.34 49 P2 TEH TEC 37 57 DSI 05H 0.05 0.07 109 P1 TEH TEC 37 57 DSI 02H 0.05 0.19 96 P1 TEH TEC 38 35 DSI 02H -0.07 0.11 52 P1 TEH TEC 38 52 DNI 07H 0.00 1.27 54 P1 TEH TEC 38 60 DSI 04H 0.19 0.99 134 P1 TEH TEC 38 60 SAI 04H 0.19 0.11 34 0.26 0.14 59 6

04H 05H 38 62 PCT AV2 0.07 16 1.02 19 P2 TEH TEC 38 63 DSI 03H 0.07 0.13 12 P1 TEH TEC 39 31 DSI 05H 0.00 0.19 158 P1 TEH TEC 39 33 DSI 03H 0.07 0.13 71 P1 TEH TEC 39 45 PCT AV4 -0.40 35 4.25 45 P2 TEH TEC Page 26 of 27

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21B (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 39 45 PCT AV3 -0.12 23 1.73 85 P2 TEH TEC 39 65 PCT AV4 0.19 11 0.54 108 P2 TEH TEC 39 70 PCT AV3 0.26 29 2.92 44 P2 TEH TEC 39 72 PCT AV1 0.00 6

0.27 154 P2 TEH TEC 40 31 DSI 05H 0.00 0.11 46 P1 TEH TEC 40 35 DNI 08H 0.25 0.63 34 P1 TEH TEC 40 41 CSI 02H 0.03 0.75 118 0.9 22.94 86 10 02H 02H 40 42 DSI 02H -0.10 0.42 176 P1 TEH TEC 40 45 DNI 07H -0.32 1.26 55 P1 TEH TEC 41 31 DSI 05H 0.05 0.19 95 P1 TEH TEC 41 36 DNI 03C 0.10 1.84 8

P1 TEH TEC 41 52 DSI 08C 0.10 0.16 35 P1 TEH TEC 41 68 DSI 04H 0.10 0.31 38 P1 TEH TEC 41 68 PCT AV1 0.28 17 1.00 29 P2 TEH TEC 42 28 PCT AV3 0.16 19 1.31 199 P2 TEH TEC 42 29 PCT AV1 0.22 21 1.59 203 P2 TEH TEC 42 29 PCT AV2 0.20 14 0.86 192 P2 TEH TEC 42 36 DNI 08H 0.07 1.46 17 P1 TEH TEC 42 45 DNI 07H 0.00 2.10 47 P1 TEH TEC 42 45 DNI 08H 0.00 1.34 33 P1 TEH TEC 42 45 DNI 04H 0.00 1.68 37 P1 TEH TEC 42 46 PCT AV1 -0.22 13 0.85 195 P2 TEH TEC 42 46 DNI 08H 0.00 1.20 45 P1 TEH TEC 42 46 WAR AV1 -0.22 0.32 97 2

08H AV1 42 47 PCT AV1 0.20 26 2.22 30 P2 TEH TEC 42 47 PCT AV2 0.12 25 1.98 202 P2 TEH TEC 42 51 DSI 04H 0.07 0.14 48 P1 TEH TEC 42 55 PCT AV1 -0.34 32 3.55 42 P2 TEH TEC 42 55 PCT AV2 0.08 20 1.36 151 P2 TEH TEC 44 48 DSI 02H 0.00 0.35 168 P1 TEH TEC 44 53 DSI 05H 0.02 0.51 111 P1 TEH TEC 44 58 DNI 06H 0.02 1.86 15 P1 TEH TEC 44 59 DNI 06H 0.12 2.15 14 P1 TEH TEC 45 36 DSI 08H -0.29 0.64 130 P1 TEH TEC 45 37 DSI 08H -0.34 0.40 136 P1 TEH TEC 45 39 PSI 06C 0.53 18.13 164 P5 TEH TEC 45 39 CSI 06C -0.01 0.75 92 0.7 76.02 85 10 06C 06C Page 27 of 27

Unit #2 - 2R24 Steam Generator 180 Day Report Attachment C BEAVER VALLEY UNIT #2 2R24 SG EXAMINATION RESULTS 2RCS-SG21C TUBES WITH SERVICE INDUCED INDICATIONS

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 1

23 DSI 07C 0.15 0.27 67 P1 08C TEC 1

52 SCI TSH -0.13 0.28 52 0.40 0.12 113 P2 TSH TSH 1

58 SCI TSH -0.09 0.05 34 0.26 0.10 97 P2 TSH TSH 1

60 SCI TSH -0.13 0.08 20 0.15 0.06 118 P2 TSH TSH 1

68 SCI TSH -0.15 0.10 58 0.45 0.10 90 P2 TSH TSH 1

75 SCI TSH -0.05 0.05 25 0.19 0.10 139 P2 TSH TSH 1

80 SCI TSH -0.05 0.10 45 0.34 0.10 119 P2 TSH TSH 2

17 DNI 04C 0.00 1.34 32 P1 08C TEC 2

21 DNI 06H -0.05 1.39 26 P1 08H TEH 2

21 DNI 04H -0.05 1.33 27 P1 08H TEH 2

78 DSI 03H 0.00 0.31 162 P1 08H TEH 2

80 DSI 03H 0.00 0.17 111 P1 08H TEH 2

84 DNI 04H -0.02 1.41 50 P1 08H TEH 2

85 DSI 03H 0.02 0.27 15 P1 08H TEH 2

86 DNI 08C 0.00 1.45 40 P1 08C TEC 2

87 DNI 08C 0.00 1.40 33 P1 08C TEC 3

4 DNI 07H -0.02 1.00 51 P1 08H TEH 3

8 DSI 04H -0.05 0.54 146 P1 08H TEH 3

9 DSI 06H 0.02 0.13 112 P1 08H TEH 3

9 DSI 04H -0.02 0.14 126 P1 08H TEH 3

12 DSI 07H -0.10 0.30 150 P1 08H TEH 3

16 DNI 02H -0.12 1.56 16 P1 08H TEH 3

16 DNI 03H 0.27 1.43 13 P1 08H TEH 3

17 DNI 08H 0.05 1.22 51 P1 08H TEH 3

18 DSI 03H 0.00 0.21 129 P1 08H TEH 3

35 DSI 05H 0.02 0.23 156 P1 08H TEH 3

36 SCI TSH -0.08 0.18 55 0.42 0.08 129 P2 TSH TSH 3

39 DSI 07H 0.05 0.49 144 P1 08H TEH 3

39 DSI 04H 0.07 0.12 154 P1 08H TEH 3

45 DSI 02H 0.00 0.59 118 P1 08H TEH 3

58 DSI 02H 0.02 0.41 73 P1 08H TEH 3

58 DNI 03H 0.07 1.26 45 P1 08H TEH 3

60 DSI 03H -0.07 0.51 101 P1 08H TEH 3

60 DSI 02H -0.05 0.32 103 P1 08H TEH 3

64 DSI 02H 0.05 0.27 111 P1 08H TEH 3

64 DSI 03H -0.05 0.50 43 P1 08H TEH 3

80 DSI 02H -0.05 0.59 99 P1 08H TEH 3

82 DNI 05H -0.02 1.68 13 P1 08H TEH 3

90 DSI 06H -0.05 0.31 70 P1 08H TEH 3

93 DSI 04H -0.05 0.38 105 P1 08H TEH 3

94 DNI 05H 0.05 1.35 50 P1 08H TEH Page 1 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 3

94 DSI 04H -0.07 0.42 42 P1 08H TEH 4

3 DSI 04H -0.05 0.17 59 P1 08H TEH 4

11 DSI 02H -0.02 0.33 114 P1 08H TEH 4

11 DNI 08H 0.02 1.29 47 P1 08H TEH 4

26 SCI TSH -0.11 0.13 28 0.21 0.07 109 P2 TSH TSH 4

26 DNI 07H 0.02 1.40 55 P1 08H TEH 4

26 DSI 03H 0.02 0.59 141 P1 08H TEH 4

28 DSI 06H 0.00 0.46 102 P1 08H TEH 4

32 DNI 08H 0.20 1.35 30 P1 08H TEH 4

33 DSI 04H -0.02 0.62 71 P1 08H TEH 4

33 DSI 02H 0.01 0.78 80 P1 08H TEH 4

33 SAI 04H -0.02 0.40 58 0.45 0.27 88 2

04H 04H 4

33 SAI 02H -0.08 0.27 45 0.34 0.14 116 2

02H 02H 4

34 DNI 06H 0.05 1.43 49 P1 08H TEH 4

38 SCI TSH -0.04 0.23 65 0.49 0.21 105 P2 TSH TSH 4

39 DSI 07H 0.02 0.45 50 P1 08H TEH 4

48 DSI 02H -0.10 0.26 105 P1 08H TEH 4

49 DSI 03H 0.02 0.52 115 P1 08H TEH 4

62 DSI 06C 0.29 0.41 63 P1 08C TEC 4

69 DSI 03H 0.00 0.19 44 P1 08H TEH 4

76 DSI 03H -0.07 0.37 161 P1 08H TEH 4

80 DNI 05H 0.05 1.23 50 P1 08H TEH 4

80 DNI 07H -0.02 1.31 54 P1 08H TEH 4

82 DNI 02H 0.29 1.31 22 P1 08H TEH 5

6 DSI 03H 0.00 0.66 140 P1 TEH TEC 5

6 DSI 04H 0.02 0.10 103 P1 TEH TEC 5

7 DSI 02H 0.00 0.48 132 P1 TEH TEC 5

7 DSI 03H 0.24 0.93 110 P1 TEH TEC 5

15 SAI 04H -0.07 0.18 43 0.33 0.26 56 6

04H 04H 5

15 SAI 04H -0.25 0.18 57 0.43 0.24 90 6

04H 04H 5

15 DSI 04H 0.02 0.77 127 P1 TEH TEC 5

15 DSI 03H 0.12 0.29 32 P1 TEH TEC 5

18 DSI 02H 0.00 0.26 120 P1 TEH TEC 5

19 DSI 03H 0.15 0.27 102 P1 TEH TEC 5

19 DSI 02H 0.00 0.57 116 P1 TEH TEC 5

21 DNI 08H 0.17 1.67 31 P1 STH TEC 5

22 DNI 08H 0.25 1.28 11 P1 STH TEC 5

28 DNI 08H 0.15 1.71 31 P1 STH TEC 5

29 DSI 03H 0.02 0.24 127 P1 STH TEC 5

29 DSI 02H -0.05 0.72 123 P1 STH TEC 5

29 DNI 08C -0.02 1.37 43 P1 STH TEC Page 2 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 5

29 DNI 08H 0.15 1.77 29 P1 STH TEC 5

30 DNI 08H 0.00 1.38 29 P1 TEH TEC 5

35 DNI 08H 0.19 1.44 36 P1 STH TEC 5

47 SCI TSH -0.07 0.25 75 0.58 0.10 118 P2 TSH TSH 5

55 SAI TSH 0.04 0.15 57 0.43 0.10 49 6

TSH TSH 5

61 DSI 02H 0.00 0.34 61 P1 TEH TEC 5

62 DSI 02H 0.00 0.36 109 P1 TEH TEC 5

66 DSI 03H 0.02 0.59 81 P1 TEH TEC 5

68 DNI 07H 0.00 1.46 50 P1 TEH TEC 5

70 DSI 05C 0.12 0.52 63 P1 TEH TEC 5

71 DSI 02H 0.00 0.41 94 P1 TEH TEC 5

73 DNI 03H 0.17 1.27 49 P1 TEH TEC 5

76 DSI 03H 0.00 0.42 101 P1 TEH TEC 5

78 DNI 08H 0.00 1.16 55 P1 TEH TEC 5

81 DNI 07H 0.05 1.23 55 P1 TEH TEC 5

86 DNI 03H 0.00 1.64 54 P1 TEH TEC 5

86 DSI 08H 0.00 0.87 19 P1 TEH TEC 5

88 DNI 06H 0.00 1.28 55 P1 TEH TEC 5

89 DSI 02H 0.02 0.66 112 P1 TEH TEC 6

23 DSI 02H 0.00 0.19 110 P1 TEH TEC 6

30 DSI 03H -0.05 0.24 135 P1 TEH TEC 6

30 DSI 02H 0.00 0.43 143 P1 TEH TEC 6

33 SCI TSH -0.14 0.08 26 0.20 0.07 109 P2 TSH TSH 6

36 SCI TSH -0.11 0.10 35 0.27 0.11 146 P2 TSH TSH 6

36 MCI TSH -0.07 0.10 62 0.47 0.10 106 P2 TSH TSH 6

37 SAI TSH 0.00 0.13 55 0.42 0.10 87 6

TSH TSH 6

47 SAI TSH 0.73 0.44 57 0.43 0.17 73 6

TSH TSH 6

54 DSI 03H 0.05 0.60 86 P1 TEH TEC 6

55 DSI 02H -0.02 0.61 154 P1 TEH TEC 6

63 DSI 04H 0.00 0.40 19 P1 TEH TEC 6

63 DSI 02H 0.00 0.60 120 P1 TEH TEC 6

78 DSI 03H 0.00 0.34 79 P1 TEH TEC 6

84 DSI 03H 0.00 0.25 85 P1 TEH TEC 6

87 DSI 03H 0.00 0.35 29 P1 TEH TEC 6

92 DSI 04H 0.10 0.42 87 P1 TEH TEC 7

7 DNI 07C 0.17 2.05 15 P1 TEH TEC 7

7 DNI 07H 0.00 2.34 22 P1 TEH TEC 7

7 DNI 08H -0.13 1.80 11 P1 TEH TEC 7

9 DNI 06H 0.00 1.02 55 P1 TEH TEC 7

12 DNI 02H 0.00 1.32 55 P1 TEH TEC 7

12 DSI 04H 0.05 0.32 100 P1 TEH TEC Page 3 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 7

12 DSI 08C -0.05 0.68 31 P1 TEH TEC 7

12 SAI 08C 0.15 0.30 37 0.28 0.11 134 2

08H 08C 7

12 SAI 04H 0.00 0.23 38 0.29 0.18 109 P4 04H 04H 7

12 SAI 04H 0.08 0.13 31 0.23 0.09 78 P4 04H 04H 7

40 DSI 03H -0.05 0.33 94 P1 TEH TEC 7

40 DSI 04H 0.00 0.34 51 P1 TEH TEC 7

49 DSI 02H 0.00 0.20 106 P1 TEH TEC 7

49 DSI 03H 0.02 0.30 95 P1 TEH TEC 7

52 SCI TSH -0.10 0.23 65 0.49 0.07 85 P2 TSH TSH 7

53 SCI TSH -0.07 0.28 92 0.70 0.16 107 P2 TSH TSH 7

58 DSI 02H -0.02 0.33 75 P1 TEH TEC 7

67 DSI 02H -0.02 0.41 41 P1 TEH TEC 7

72 PSI 05C 0.20 9.20 162 P5 TEH TEC 7

80 DSI 03H -0.05 0.22 119 P1 TEH TEC 7

93 DNI 05H -0.07 1.56 14 P1 TEH TEC 8

2 DSI 08H 0.07 0.40 30 P1 TEH TEC 8

10 SCI TSH -0.15 0.13 34 0.26 0.13 115 P2 TSH TSH 8

12 DNI 06H 0.00 1.25 55 P1 TEH TEC 8

23 DSI 02H 0.02 0.56 101 P1 TEH TEC 8

24 DSI 02H -0.02 0.37 112 P1 TEH TEC 8

43 DSI 03H -0.10 0.20 67 P1 TEH TEC 8

63 DSI 06H -0.07 0.24 59 P1 TEH TEC 8

66 DNI 03H 0.05 0.73 16 P1 TEH TEC 8

72 DSI 03H -0.07 0.16 24 P1 TEH TEC 8

84 DSI 03H 0.05 0.25 163 P1 TEH TEC 8

90 DNI 08H 0.20 1.41 12 P1 TEH TEC 8

90 DNI 05H 0.00 1.46 9

P1 TEH TEC 9

13 DSI 03H -0.05 0.17 25 P1 TEH TEC 9

20 DSI 04H 0.00 0.41 169 P1 TEH TEC 9

26 DSI 03H -0.02 0.41 72 P1 TEH TEC 9

30 DSI 02H -0.02 0.33 115 P1 TEH TEC 9

30 DNI 07H 0.03 1.42 52 P1 TEH TEC 9

32 DNI 07H 0.05 1.54 52 P1 TEH TEC 9

32 DSI 02H 0.02 0.53 77 P1 TEH TEC 9

35 DSI 02H 0.02 0.55 116 P1 TEH TEC 9

35 DSI 03H 0.02 0.38 102 P1 TEH TEC 9

37 DSI 02H -0.10 0.26 130 P1 TEH TEC 9

38 DSI 03H -0.02 0.37 144 P1 TEH TEC 9

39 DSI 05H -0.07 0.31 74 P1 TEH TEC 9

41 DSI 02H 0.10 0.25 113 P1 TEH TEC 9

44 DSI 03H 0.00 0.19 110 P1 TEH TEC Page 4 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 9

45 DSI 05H 0.00 0.38 87 P1 TEH TEC 9

45 DSI 06H -0.07 0.22 76 P1 TEH TEC 9

47 DSI 02H 0.00 0.42 107 P1 STH TEC 9

53 SCI TSH -0.10 0.18 40 0.31 0.10 96 P2 TSH TSH 9

54 SCI TSH 0.03 0.13 55 0.42 0.09 65 P2 TSH TSH 9

54 DSI 04H 0.05 0.24 90 P1 TEH TEC 9

54 DSI 02H -0.24 0.95 105 P1 TEH TEC 9

55 SCI TSH -0.09 0.15 38 0.29 0.10 139 P2 TSH TSH 9

62 DSI 04H -0.07 0.18 62 P1 TEH TEC 9

65 DSI 06H 0.05 0.30 54 P1 TEH TEC 9

74 DSI 04H -0.02 0.29 120 P1 TEH TEC 10 8

DNI 06C 0.00 1.15 54 P1 TEH TEC 10 8

DSI 02H -0.05 1.15 102 P1 TEH TEC 10 9

DSI 03H 0.17 0.24 133 P1 TEH TEC 10 10 SAI TSH -0.51 0.13 32 0.25 0.15 120 6

TSH TSH 10 10 DSI 03H 0.02 0.24 50 P1 TEH TEC 10 10 DSI 02H -0.02 0.46 99 P1 TEH TEC 10 15 DNI 07H 0.00 1.10 55 P1 TEH TEC 10 15 DNI 04C -0.05 1.26 26 P1 TEH TEC 10 18 DSI 04H 0.00 0.06 148 P1 TEH TEC 10 24 DSI 03H 0.20 0.21 118 P1 TEH TEC 10 32 DNI 07H 0.00 1.30 18 P1 TEH TEC 10 34 DNI 08C 0.02 1.27 45 P1 TEH TEC 10 36 DSI 02H 0.00 0.35 150 P1 TEH TEC 10 37 DSI 02H -0.02 0.45 103 P1 TEH TEC 10 38 DSI 07H 0.00 0.41 144 P1 STH TEC 10 43 DSI 02H 0.00 0.21 130 P1 TEH TEC 10 44 DSI 02H -0.02 0.30 142 P1 TEH TEC 10 51 DSI 02H 0.00 0.94 35 P1 TEH TEC 10 51 DSI 05H 0.00 0.38 23 P1 TEH TEC 10 51 DSI 03H -0.02 0.39 51 P1 TEH TEC 10 54 DSI 03H 0.05 0.35 91 P1 TEH TEC 10 54 DSI 02H 0.02 0.79 87 P1 TEH TEC 10 55 DNI 08H 0.00 1.51 40 P1 TEH TEC 10 55 DNI 07C -0.05 1.29 28 P1 TEH TEC 10 56 SCI TSH 0.00 0.21 55 0.42 0.19 120 P2 TSH TSH 10 60 DNI 03H 0.10 1.24 51 P1 TEH TEC 10 69 DNI 06H 0.00 1.65 55 P1 TEH TEC 10 72 DNI 07H 0.00 1.33 53 P1 TEH TEC 10 72 DSI 03H -0.02 0.19 64 P1 TEH TEC 10 72 DSI 02H 0.00 0.26 105 P1 TEH TEC Page 5 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 10 76 DSI 04H 0.05 0.10 63 P1 TEH TEC 10 78 DSI 03H 0.07 0.07 166 P1 STH TEC 10 83 DNI 07H 0.10 0.73 48 P1 TEH TEC 10 89 DNI 07H 0.00 1.15 55 P1 TEH TEC 11 7

DSI 02H 0.00 0.30 70 P1 TEH TEC 11 9

DSI 03H 0.07 0.32 114 P1 TEH TEC 11 17 DSI 02H 0.17 0.70 89 P1 STH TEC 11 17 DNI 04H 0.05 2.02 55 P1 STH TEC 11 17 DNI 07C 0.00 1.33 41 P1 STH TEC 11 18 DNI 08C -0.02 1.62 44 P1 STH TEC 11 18 DNI 08H -0.02 1.26 55 P1 STH TEC 11 24 DNI 04H 0.02 1.41 9

P1 TEH TEC 11 24 DNI 05H -0.02 1.32 16 P1 TEH TEC 11 36 DSI 02H 0.22 0.38 22 P1 STH TEC 11 36 DNI 07C 0.00 1.57 40 P1 STH TEC 11 36 DNI 06H 0.00 1.75 52 P1 STH TEC 11 36 DNI 04H 0.00 2.10 52 P1 STH TEC 11 36 DNI 04C -0.05 1.14 22 P1 STH TEC 11 36 SAI 02H 0.02 0.40 40 0.31 0.17 115 2

02H 02H 11 48 DNI 04H -0.02 1.49 16 P1 TEH TEC 11 49 SCI TSH -0.07 0.23 95 0.73 0.19 82 P2 TSH TSH 11 49 DSI 02H 0.07 0.59 84 P1 TEH TEC 11 54 DNI 04C -0.24 1.34 14 P1 TEH TEC 11 54 DNI 06H 0.00 1.39 50 P1 TEH TEC 11 55 DNI 02H 0.00 1.69 55 P1 TEH TEC 11 57 DSI 07C -0.17 0.39 144 P1 TEH TEC 11 62 DSI 03H 0.02 0.26 36 P1 TEH TEC 11 70 DSI 03H -0.02 0.17 57 P1 TEH TEC 11 72 DNI 08H 0.00 1.29 48 P1 TEH TEC 11 72 DSI 03H -0.02 0.26 42 P1 TEH TEC 11 77 DSI 05H 0.00 0.24 22 P1 TEH TEC 11 77 DSI 04H 0.00 0.37 99 P1 TEH TEC 11 79 DNI 08H 0.04 0.94 55 P1 TEH TEC 11 87 DNI 06C -0.27 1.30 24 P1 TEH TEC 11 88 DNI 06H 0.00 1.48 46 P1 TEH TEC 11 88 DSI 05H 0.00 0.66 153 P1 TEH TEC 11 88 DNI 04H 0.20 1.46 54 P1 TEH TEC 11 89 DNI 07C 0.00 1.30 32 P1 TEH TEC 11 89 DNI 05H 0.00 1.49 44 P1 TEH TEC 12 9

DSI 02H 0.05 0.26 89 P1 TEH TEC 12 12 DNI 05H 0.00 1.09 55 P1 TEH TEC Page 6 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 12 27 DNI 06H 0.00 1.37 46 P1 TEH TEC 12 30 DSI 02H -0.05 0.23 147 P1 TEH TEC 12 35 DSI 04H 0.10 0.12 120 P1 TEH TEC 12 35 DSI 05H 0.05 0.11 147 P1 TEH TEC 12 39 DNI 08H 0.00 1.35 33 P1 STH TEC 12 41 SCI TSH -0.06 0.23 108 0.82 0.18 82 P2 TSH TSH 12 45 DNI 07H 0.00 1.14 55 P1 TEH TEC 12 55 DSI 02H -0.27 0.34 74 P1 TEH TEC 12 59 DNI 04H -0.02 1.57 49 P1 TEH TEC 12 70 DSI 03H 0.02 0.28 116 P1 TEH TEC 12 70 DSI 02H -0.02 0.30 94 P1 TEH TEC 12 71 DNI 08H 0.02 1.50 10 P1 TEH TEC 12 83 DSI 03H 0.02 0.18 153 P1 TEH TEC 12 92 DNI 04H 0.00 1.63 55 P1 TEH TEC 12 92 DNI 06H 0.00 1.42 16 P1 TEH TEC 13 7

DSI 03H 0.07 0.39 109 P1 TEH TEC 13 30 DNI 05H 0.02 1.29 55 P1 TEH TEC 13 32 DSI 02H 0.02 0.06 80 P1 TEH TEC 13 32 DNI 08H 0.00 1.28 51 P1 TEH TEC 13 35 SAI 04H 0.11 0.15 37 0.28 0.13 92 6

04H 04H 13 35 SAI 04H -0.01 0.28 71 0.54 0.16 115 6

04H 04H 13 35 SAI 02H 0.24 0.23 82 0.62 0.20 116 6

02H 02H 13 35 SAI 05H -0.08 0.13 37 0.28 0.08 110 P4 05H 05H 13 35 SAI 02H -0.17 0.18 51 0.39 0.18 97 6

02H 02H 13 35 SAI 02H 0.00 0.25 42 0.32 0.16 129 P4 02H 02H 13 35 DSI 05H 0.00 0.46 77 P1 TEH TEC 13 35 DSI 02H 0.00 0.39 59 P1 TEH TEC 13 35 DSI 04H 0.00 0.53 100 P1 TEH TEC 13 35 DNI 07H 0.00 1.64 55 P1 TEH TEC 13 43 DSI 02H -0.02 0.13 31 P1 TEH TEC 13 43 DSI 03H 0.10 0.44 160 P1 TEH TEC 13 45 DNI 08H 0.00 1.30 29 P1 TEH TEC 13 59 SCI TSH -0.12 0.28 89 0.68 0.27 129 P2 TSH TSH 13 59 DSI 03H 0.00 0.16 26 P1 TEH TEC 13 61 DNI 07C 0.25 1.41 15 P1 TEH TEC 13 62 DSI 04H 0.02 0.26 37 P1 TEH TEC 13 63 DSI 02H 0.00 0.10 28 P1 TEH TEC 13 64 DNI 04H 0.00 1.33 35 P1 TEH TEC 13 64 DNI 05H 0.00 1.03 55 P1 TEH TEC 13 64 DSI 02H 0.00 0.52 62 P1 TEH TEC 13 64 DSI 08H -0.02 0.36 79 P1 TEH TEC Page 7 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 13 74 DNI 07H 0.00 1.31 45 P1 TEH TEC 13 74 DNI 05H 0.00 1.38 39 P1 TEH TEC 14 27 DNI 03H 0.00 1.32 12 P1 TEH TEC 14 27 DNI 02H 0.00 1.44 15 P1 TEH TEC 14 29 SAI 04H -0.06 0.15 55 0.42 0.08 127 P4 04H 05H 14 29 DSI 04H -0.02 0.17 81 P1 TEH TEC 14 38 DSI 02H -0.05 0.23 77 P1 TEH TEC 14 39 DSI 05H 0.02 0.20 100 P1 TEH TEC 14 46 DNI 03H 0.05 1.36 22 P1 TEH TEC 14 49 SCI TSH 0.00 0.21 80 0.61 0.09 101 P2 TSH TSH 14 50 DSI 02H -0.12 0.41 98 P1 TEH TEC 14 54 DSI 02H -0.05 0.42 78 P1 TEH TEC 14 59 DSI 03H -0.02 0.09 87 P1 TEH TEC 14 59 DSI 04H 0.02 0.18 152 P1 TEH TEC 14 59 DSI 06H 0.00 0.08 106 P1 TEH TEC 14 70 DSI 08H 0.06 0.37 35 P1 TEH TEC 15 5

DNI 08H 0.00 1.16 55 P1 TEH TEC 15 5

DSI 04H 0.12 0.82 43 P1 TEH TEC 15 11 DNI 06H 0.00 1.23 55 P1 TEH TEC 15 13 SCI TSH -0.13 0.19 182 1.39 0.17 60 P2 TSH TSH 15 14 DNI 08H 0.02 1.32 48 P1 TEH TEC 15 14 DNI 07H -0.02 1.32 54 P1 TEH TEC 15 14 DSI 03H 0.02 0.16 45 P1 TEH TEC 15 35 DSI 03H 0.12 0.49 104 P1 TEH TEC 15 35 DSI 02H -0.02 0.16 158 P1 TEH TEC 15 38 SAI 04H -0.04 0.23 55 0.42 0.22 90 6

04H 04H 15 38 DSI 04H -0.05 0.48 42 P1 TEH TEC 15 39 DSI 03H -0.05 0.44 117 P1 TEH TEC 15 39 DSI 02H 0.05 0.74 127 P1 TEH TEC 15 61 DSI 02H 0.02 0.20 105 P1 TEH TEC 15 62 DSI 02H -0.05 0.09 162 P1 TEH TEC 15 78 DNI 08H 0.00 1.39 44 P1 TEH TEC 15 78 DNI 06H 0.00 1.36 45 P1 TEH TEC 15 80 DSI 03H 0.00 0.21 124 P1 TEH TEC 15 87 DSI 03H -0.02 0.31 144 P1 TEH TEC 16 15 DSI 03H 0.20 0.34 127 P1 TEH TEC 16 16 DNI 08H 0.00 1.48 49 P1 TEH TEC 16 16 DNI 06H -0.02 2.04 43 P1 TEH TEC 16 16 DNI 04C 0.02 1.53 24 P1 TEH TEC 16 17 DSI 02H -0.10 0.22 58 P1 TEH TEC 16 20 DNI 08H 0.02 1.29 24 P1 TEH TEC Page 8 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 16 23 DNI 06C 0.00 0.98 38 P1 TEH TEC 16 23 DNI 07C 0.00 1.08 45 P1 TEH TEC 16 34 DSI 03H -0.02 0.31 53 P1 STH TEC 16 45 DSI 06C 0.00 0.98 18 P1 TEH TEC 16 45 DNI 05H 0.25 1.44 10 P1 TEH TEC 16 45 SAI 06C 0.17 0.16 34 0.26 0.09 132 P4 06C 06C 16 46 SCI TSH -0.08 0.21 28 0.21 0.05 72 P2 TSH TSH 16 46 DSI 04H -0.10 0.98 38 P1 TEH TEC 16 46 DNI 08H 0.00 1.37 50 P1 TEH TEC 16 46 DSI 02H -0.10 0.66 109 P1 TEH TEC 16 46 DNI 06H 0.00 1.84 51 P1 TEH TEC 16 46 DNI 08C 0.05 0.35 43 P1 TEH TEC 16 55 DSI 06H -0.10 0.41 151 P1 TEH TEC 16 57 DSI 03H 0.07 0.16 50 P1 TEH TEC 16 63 DSI 02H -0.05 0.14 26 P1 TEH TEC 16 73 DSI 02H 0.00 0.17 93 P1 TEH TEC 16 73 DNI 08H 0.19 1.25 43 P1 TEH TEC 17 9

SAI 04H 0.00 0.20 37 0.28 0.07 96 P4 04H 04H 17 9

DSI 04H 0.00 0.20 126 P1 TEH TEC 17 14 DSI 04H 0.00 0.22 112 P1 TEH TEC 17 17 DSI 02H -0.07 0.14 99 P1 TEH TEC 17 18 DSI 02H -0.05 0.30 48 P1 TEH TEC 17 24 DSI 04H 0.00 0.08 135 P1 TEH TEC 17 26 DSI 03H -0.03 0.18 140 P1 TEH TEC 17 27 DNI 08C -0.02 1.12 32 P1 TEH TEC 17 35 SAI 03H -0.04 0.23 43 0.33 0.14 87 6

03H 03H 17 35 SAI 03H -0.18 0.15 32 0.25 0.10 109 P4 03H 03H 17 35 DSI 03H -0.10 0.82 58 P1 TEH TEC 17 35 DNI 06H 0.00 1.40 52 P1 TEH TEC 17 37 DNI 07H 0.00 1.54 38 P1 TEH TEC 17 37 DNI 04H -0.05 1.51 48 P1 TEH TEC 17 37 DNI 08C 0.00 1.33 34 P1 TEH TEC 17 38 DSI 02H 0.19 0.30 102 P1 STH TEC 17 38 DNI 08H 0.00 1.39 55 P1 STH TEC 17 48 DSI 02H 0.00 0.57 70 P1 TEH TEC 17 49 DSI 02H -0.05 0.19 66 P1 TEH TEC 17 50 SAI 03H 0.10 0.25 182 1.39 0.14 117 P4 03H 03H 17 50 SAI 03H 0.00 0.25 40 0.31 0.18 75 P4 03H 03H 17 50 DSI 03H 0.00 0.78 91 P1 TEH TEC 17 54 SCI TSH -0.07 0.28 108 0.82 0.12 126 P2 TSH TSH 17 54 DSI 04H 0.05 0.31 92 P1 TEH TEC Page 9 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 17 61 DSI 03H 0.00 0.26 88 P1 TEH TEC 17 61 DSI 02H -0.02 0.69 78 P1 TEH TEC 17 63 DSI 02H -0.02 0.46 78 P1 TEH TEC 17 66 DSI 02H -0.02 0.38 114 P1 TEH TEC 17 67 DSI 02H -0.05 0.57 149 P1 TEH TEC 17 68 DSI 02H 0.02 0.32 112 P1 TEH TEC 17 80 DNI 08H 0.00 1.35 39 P1 TEH TEC 18 5

DSI 03H -0.05 0.25 165 P1 TEH TEC 18 6

DNI 08H 0.00 0.98 55 P1 TEH TEC 18 8

DNI 08H 0.00 1.03 50 P1 TEH TEC 18 12 DNI 02H 0.00 1.44 55 P1 TEH TEC 18 12 DNI 05H 0.00 1.22 55 P1 TEH TEC 18 15 DSI 06H 0.15 0.14 122 P1 TEH TEC 18 15 DNI 02H 0.00 1.50 41 P1 TEH TEC 18 15 DNI 08H 0.00 1.32 55 P1 TEH TEC 18 15 DNI 08C 0.00 1.33 53 P1 TEH TEC 18 36 DNI 08H 0.00 1.02 55 P1 TEH TEC 18 36 DNI 07C 0.02 1.16 41 P1 TEH TEC 18 41 SCI TSH -0.09 0.21 58 0.45 0.10 103 P2 TSH TSH 18 42 SCI TSH 0.00 0.21 75 0.58 0.10 116 P2 TSH TSH 18 47 DSI 04H 0.00 0.48 92 P1 TEH TEC 18 47 DSI 03H 0.00 0.42 71 P1 TEH TEC 18 48 DSI 04H 0.02 0.40 56 P1 TEH TEC 18 48 DSI 02H 0.00 0.25 62 P1 TEH TEC 18 48 DSI 03H 0.07 0.67 101 P1 TEH TEC 18 48 DNI 08H 0.00 1.29 50 P1 TEH TEC 18 50 DSI 02H 0.02 0.31 139 P1 TEH TEC 18 51 DNI 08H 0.19 1.25 54 P1 TEH TEC 18 51 DNI 06C 0.00 1.37 31 P1 TEH TEC 18 51 DSI 02H 0.00 0.37 106 P1 TEH TEC 18 53 DSI 02H -0.02 0.46 69 P1 TEH TEC 18 53 DNI 03H 0.07 1.54 50 P1 TEH TEC 18 54 DNI 06H 0.00 1.52 49 P1 TEH TEC 18 54 DSI 03H 0.02 0.24 111 P1 TEH TEC 18 54 DSI 02H 0.02 0.49 56 P1 TEH TEC 18 55 DNI 08H 0.19 1.35 48 P1 TEH TEC 18 55 DSI 02H -0.02 0.24 104 P1 TEH TEC 18 56 DSI 03H 0.05 0.51 82 P1 TEH TEC 18 56 DNI 06H 0.22 1.60 52 P1 TEH TEC 18 59 DSI 06H 0.00 0.18 49 P1 TEH TEC 18 59 DNI 07H 0.00 1.36 53 P1 TEH TEC Page 10 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 18 59 DSI 03H 0.02 0.30 114 P1 TEH TEC 18 61 DSI 08H 0.00 0.15 42 P1 TEH TEC 18 61 DSI 04H 0.00 0.19 83 P1 TEH TEC 18 62 DSI 04H 0.15 0.21 116 P1 TEH TEC 18 62 DSI 03H 0.00 0.70 104 P1 TEH TEC 18 62 DSI 02H -0.10 0.33 88 P1 TEH TEC 18 65 DNI 07H 0.07 1.28 44 P1 TEH TEC 18 65 DNI 06H 0.00 1.27 53 P1 TEH TEC 18 66 DSI 03H 0.00 0.58 103 P1 TEH TEC 18 67 DNI 08H 0.19 1.27 55 P1 TEH TEC 18 67 DSI 03H 0.10 0.43 83 P1 TEH TEC 18 67 DSI 02H 0.02 0.36 88 P1 TEH TEC 18 73 DSI 03H 0.07 0.10 72 P1 TEH TEC 18 88 DNI 04H -0.12 1.31 54 P1 TEH TEC 19 20 DNI 02H -0.02 1.82 23 P1 TEH TEC 19 20 DNI 08H 0.00 1.21 24 P1 TEH TEC 19 22 DNI 07H 0.00 1.08 55 P1 TEH TEC 19 23 DNI 06C 0.00 1.42 26 P1 TEH TEC 19 25 DNI 08C 0.00 1.00 41 P1 TEH TEC 19 26 DNI 07H -0.05 1.47 54 P1 TEH TEC 19 26 DSI 03H 0.05 0.28 112 P1 TEH TEC 19 29 DSI 02H -0.08 0.44 110 P1 STH TEC 19 29 DSI 08H 0.00 0.44 74 P1 STH TEC 19 29 SAI 08H -0.11 0.16 37 0.28 0.15 110 2

08H 08H 19 34 DNI 07H 0.05 1.37 34 P1 TEH TEC 19 47 DSI 04H 0.20 0.26 99 P1 STH TEC 19 47 SAI 04H -0.03 0.11 42 0.32 0.13 64 2

04H 04H 19 48 DSI 03H 0.07 0.67 73 P1 TEH TEC 19 48 DSI 02H -0.07 0.41 51 P1 TEH TEC 19 53 DNI 08H 0.02 1.25 49 P1 TEH TEC 19 54 DSI 02H -0.05 0.28 115 P1 TEH TEC 19 57 DSI 04H 0.02 0.50 46 P1 TEH TEC 19 57 DSI 05H 0.00 0.59 89 P1 TEH TEC 19 65 DSI 05H 0.05 0.26 100 P1 STH TEC 19 79 DNI 08H 0.00 1.31 55 P1 TEH TEC 19 79 DSI 02H 0.00 1.12 130 P1 TEH TEC 19 82 DSI 02H 0.00 0.38 118 P1 TEH TEC 19 82 DNI 07H 0.20 1.28 51 P1 TEH TEC 19 89 DSI 06H -0.02 0.29 134 P1 TEH TEC 20 13 DNI 05H 0.00 1.27 47 P1 TEH TEC 20 13 DNI 06H 0.05 1.27 43 P1 TEH TEC Page 11 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 20 13 DNI 07H 0.05 1.55 39 P1 TEH TEC 20 13 DNI 04C 0.12 1.42 17 P1 TEH TEC 20 13 DNI 07C 0.00 1.35 33 P1 TEH TEC 20 17 DNI 07H 0.00 1.19 34 P1 TEH TEC 20 21 SAI 04H 0.07 0.21 52 0.40 0.20 107 6

04H 05H 20 21 DSI 04H 0.02 0.23 145 P1 TEH TEC 20 47 SCI 01H 10.11 0.26 34 0.26 0.30 148 P2 01H 02H 20 75 DSI 02H 0.00 0.51 136 P1 STH TEC 20 75 DNI 07H 0.07 1.49 55 P1 STH TEC 20 76 SAI 02H 0.09 0.17 22 0.16 0.06 102 P4 02H 02H 20 76 DSI 03H 0.00 0.54 81 P1 TEH TEC 20 76 DSI 02H -0.05 0.57 133 P1 TEH TEC 20 76 DNI 08H 0.22 1.29 54 P1 TEH TEC 20 78 SAI 04H -0.03 0.22 54 0.41 0.14 108 P4 04H 04H 20 78 DNI 07C 0.00 1.76 19 P1 TEH TEC 20 78 DNI 08H 0.02 1.34 55 P1 TEH TEC 20 78 DSI 04H 0.02 0.38 114 P1 TEH TEC 20 79 DNI 07H 0.05 1.09 55 P1 TEH TEC 20 80 DNI 06H 0.00 1.28 55 P1 TEH TEC 20 83 DNI 05H 0.12 1.14 37 P1 TEH TEC 20 83 DNI 07H 0.15 1.22 55 P1 TEH TEC 20 84 DNI 04H 0.10 1.81 46 P1 TEH TEC 20 85 DSI 03H 0.05 0.27 109 P1 TEH TEC 20 85 DNI 07H 0.00 1.13 55 P1 TEH TEC 20 88 DNI 06H 0.02 1.25 55 P1 TEH TEC 21 18 DSI 02H 0.02 0.38 160 P1 TEH TEC 21 18 DSI 03H 0.07 0.45 144 P1 TEH TEC 21 18 DSI 08H 0.02 0.47 30 P1 TEH TEC 21 25 DSI 04H 0.20 0.07 127 P1 TEH TEC 21 31 DNI 06H 0.00 1.33 37 P1 TEH TEC 21 62 DSI 02H 0.02 0.23 65 P1 TEH TEC 21 67 DSI 07H 0.00 0.32 123 P1 TEH TEC 21 71 DNI 08H -0.05 1.09 53 P1 TEH TEC 21 78 DNI 06H 0.00 1.69 46 P1 TEH TEC 21 78 DNI 08H 0.02 1.37 40 P1 TEH TEC 21 79 DNI 07H 0.02 1.18 55 P1 TEH TEC 21 80 DNI 05H 0.00 1.43 50 P1 TEH TEC 21 82 DNI 07H 0.20 1.27 54 P1 TEH TEC 22 9

DNI 08H 0.25 1.45 12 P1 TEH TEC 22 9

DNI 07H 0.00 1.07 55 P1 TEH TEC 22 15 DNI 05H 0.02 0.91 52 P1 TEH TEC Page 12 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 22 18 DSI 04H 0.00 0.11 99 P1 TEH TEC 22 18 DSI 02H 0.02 0.59 109 P1 TEH TEC 22 18 DNI 07H -0.02 1.34 53 P1 TEH TEC 22 18 DSI 05H -0.07 0.24 84 P1 TEH TEC 22 18 SAI 04H 0.00 0.13 42 0.32 0.08 73 6

04H 04H 22 20 DSI 02H -0.05 0.90 98 P1 TEH TEC 22 20 DNI 07H -0.02 2.00 37 P1 TEH TEC 22 20 DSI 08H 0.02 0.98 45 P1 TEH TEC 22 20 SAI 08H 0.09 0.20 58 0.45 0.06 117 P4 07H 08H 22 21 DNI 06H 0.17 1.88 46 P1 TEH TEC 22 21 DNI 05H -0.07 1.77 49 P1 TEH TEC 22 24 DSI 03H -0.07 0.32 139 P1 TEH TEC 22 33 DSI 02H -0.02 0.24 34 P1 TEH TEC 22 36 DNI 08H -0.02 1.25 50 P1 TEH TEC 22 54 DSI 06H 0.02 0.35 27 P1 TEH TEC 22 61 DSI 03H -0.12 0.24 153 P1 TEH TEC 22 64 DSI 03H 0.02 0.33 163 P1 TEH TEC 22 72 DNI 05H 0.22 1.32 53 P1 TEH TEC 22 72 DNI 08H 0.22 1.25 37 P1 TEH TEC 22 73 DNI 07H 0.00 1.29 49 P1 TEH TEC 22 73 DNI 05H 0.20 1.39 54 P1 TEH TEC 22 74 DNI 04H 0.00 1.63 44 P1 TEH TEC 22 74 DNI 03H 0.00 1.45 53 P1 TEH TEC 22 74 DNI 05H 0.00 1.40 27 P1 TEH TEC 22 74 DNI 07H 0.00 1.34 38 P1 TEH TEC 22 75 SAI 04H -0.08 0.25 48 0.36 0.08 102 P4 04H 04H 22 75 DNI 07C 0.00 1.46 30 P1 TEH TEC 22 75 DSI 04H 0.00 0.30 59 P1 TEH TEC 22 75 DNI 08H 0.22 1.46 52 P1 TEH TEC 22 77 DSI 03H 0.00 0.20 133 P1 TEH TEC 22 78 DNI 05H 0.00 1.30 35 P1 TEH TEC 22 79 DNI 08H 0.02 1.10 55 P1 TEH TEC 22 80 DNI 06H 0.12 1.39 11 P1 TEH TEC 22 80 DNI 07H -0.02 1.43 10 P1 TEH TEC 22 83 DNI 08H 0.00 1.79 12 P1 TEH TEC 23 10 DSI 02H 0.00 0.23 69 P1 TEH TEC 23 13 DNI 02H 0.02 1.28 51 P1 TEH TEC 23 13 PCT AV2 0.15 11 0.57 248 P2 TEH TEC 23 28 DSI 03H 0.12 0.57 106 P1 TEH TEC 23 28 DNI 07H 0.00 0.95 53 P1 TEH TEC 23 33 PCT AV1 -0.10 19 1.06 45 P2 TEH TEC Page 13 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 23 37 DSI 02H -0.05 0.76 47 P1 STH TEC 23 39 DSI 05H -0.02 0.22 55 P1 TEH TEC 23 39 DSI 02H -0.02 0.28 124 P1 TEH TEC 23 39 DNI 07H 0.02 1.22 55 P1 TEH TEC 23 42 DSI 03H 0.00 0.24 105 P1 TEH TEC 23 42 DSI 02H 0.00 0.19 80 P1 TEH TEC 23 43 DNI 06H 0.02 1.20 55 P1 TEH TEC 23 44 SCI TSH -0.08 0.25 85 0.65 0.09 125 P2 TSH TSH 23 67 DNI 05H 0.17 1.02 39 P1 TEH TEC 23 69 DSI 03H 0.02 0.15 75 P1 TEH TEC 23 70 DNI 08H 0.12 1.41 31 P1 TEH TEC 23 73 DNI 07H 0.00 1.11 55 P1 TEH TEC 23 75 DNI 08H 0.00 1.01 55 P1 TEH TEC 23 77 DSI 03H -0.02 0.21 104 P1 TEH TEC 23 77 DSI 02H 0.00 0.55 115 P1 TEH TEC 23 78 DNI 05H 0.02 1.61 46 P1 TEH TEC 23 84 DNI 05H 0.17 1.35 23 P1 TEH TEC 23 84 DNI 04H -0.02 1.55 54 P1 TEH TEC 23 84 DNI 06H 0.15 1.32 52 P1 TEH TEC 23 85 DNI 05H 0.00 1.22 55 P1 TEH TEC 24 11 DSI 03H -0.02 0.28 80 P1 TEH TEC 24 17 DNI 07H 0.00 1.17 55 P1 TEH TEC 24 19 DNI 07H 0.00 1.13 55 P1 TEH TEC 24 32 DNI 06H 0.00 1.17 55 P1 TEH TEC 24 34 DNI 07C 0.00 1.70 23 P1 TEH TEC 24 34 DSI 02H 0.07 0.59 107 P1 TEH TEC 24 34 DSI 04H -0.02 0.29 55 P1 TEH TEC 24 34 DNI 05H 0.02 1.63 54 P1 TEH TEC 24 34 DSI 08H -0.02 0.48 41 P1 TEH TEC 24 34 SAI 02H 0.08 0.29 57 0.43 0.12 69 6

02H 02H 24 35 DNI 07C 0.02 1.19 27 P1 TEH TEC 24 48 DSI 03H 0.07 0.43 68 P1 TEH TEC 24 50 DSI 02H 0.02 0.16 52 P1 TEH TEC 24 56 DSI 03H 0.02 0.28 151 P1 TEH TEC 24 57 DSI 02H 0.00 0.22 80 P1 TEH TEC 24 61 DSI 02H 0.02 0.39 105 P1 TEH TEC 24 62 DNI 05H 0.02 1.38 49 P1 TEH TEC 24 63 DSI 04H -0.05 0.22 82 P1 TEH TEC 24 66 DNI 08C -0.37 1.26 14 P1 TEH TEC 24 69 DNI 06H 0.00 1.09 5

P1 TEH TEC 24 71 DNI 05H -0.07 1.10 30 P1 TEH TEC Page 14 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 24 74 DNI 06H 0.00 1.47 42 P1 TEH TEC 24 78 DNI 07H 0.02 1.31 52 P1 TEH TEC 24 79 DSI 02H 0.10 1.07 116 P1 TEH TEC 24 79 SAI 02H 0.00 0.43 75 0.58 0.66 88 6

02H 02H 24 84 PCT TSC 0.00 31 0.35 38 0.29 0.34 87 6

TSC TSC 24 84 VOL TSC 0.00 0.34 87 6

TSC TSC 25 11 DNI 02H 0.00 1.20 48 P1 TEH TEC 25 17 DSI 03H 0.02 0.20 102 P1 TEH TEC 25 26 DSI 04H 0.05 0.11 95 P1 TEH TEC 25 31 DSI 02H 0.00 0.58 105 P1 STH TEC 25 33 DSI 08H 0.07 0.20 143 P1 TEH TEC 25 33 DNI 04H 0.00 1.34 37 P1 TEH TEC 25 34 DSI 03H 0.15 0.87 116 P1 STH TEC 25 34 DSI 02H 0.02 0.72 87 P1 STH TEC 25 34 DSI 05H 0.00 0.37 31 P1 STH TEC 25 38 DNI 06H 0.00 1.28 47 P1 TEH TEC 25 47 DSI 08H -0.02 0.27 17 P1 TEH TEC 25 47 DSI 03H 0.07 0.15 32 P1 TEH TEC 25 54 DSI 02H 0.02 0.13 64 P1 TEH TEC 25 60 DSI 02H 0.10 0.35 117 P1 TEH TEC 25 61 DSI 02H 0.05 0.44 110 P1 TEH TEC 25 61 DNI 08H 0.00 1.15 55 P1 TEH TEC 25 61 DSI 05H 0.00 0.58 28 P1 TEH TEC 25 62 DSI 04H -0.02 0.40 144 P1 TEH TEC 25 63 DSI 04H 0.00 0.57 97 P1 TEH TEC 25 64 DNI 08H 0.00 1.63 40 P1 TEH TEC 25 65 SAI 07H 0.02 0.15 40 0.31 0.06 111 P4 07H 07H 25 65 DSI 07H -0.02 0.36 43 P1 TEH TEC 25 65 DSI 05H 0.07 0.41 109 P1 TEH TEC 25 65 DSI 02H -0.02 0.34 110 P1 TEH TEC 25 67 SAI 04H -0.12 0.19 52 0.40 0.15 70 P4 04H 04H 25 67 DSI 04H -0.02 0.28 102 P1 TEH TEC 25 69 DNI 07C 0.00 1.18 34 P1 STH TEC 25 71 DSI 06H 0.02 0.47 83 P1 STH TEC 25 73 DNI 08H 0.00 1.14 55 P1 TEH TEC 25 74 DSI 02H 0.02 0.32 133 P1 STH TEC 25 74 SAI 02H -0.03 0.35 31 0.23 0.09 132 2

02H 02H 25 75 DNI 08H 0.00 1.39 55 P1 TEH TEC 25 76 DNI 06C -0.05 1.38 32 P1 TEH TEC 25 76 DNI 08H 0.00 1.49 55 P1 TEH TEC 25 76 DSI 05H -0.05 0.22 119 P1 TEH TEC Page 15 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 25 76 DSI 02H 0.00 0.57 119 P1 TEH TEC 25 79 DSI 02H 0.00 0.29 98 P1 TEH TEC 25 79 DNI 04H 0.00 1.66 55 P1 TEH TEC 25 79 DNI 08H -0.05 1.37 55 P1 TEH TEC 25 85 DNI 02C 0.44 1.30 10 P1 TEH TEC 26 17 DNI 03H -0.05 1.31 30 P1 TEH TEC 26 17 DNI 06H 0.00 1.35 22 P1 TEH TEC 26 19 DNI 08H -0.12 0.89 49 P1 TEH TEC 26 24 DSI 06H -0.02 0.16 9

P1 TEH TEC 26 26 DTI TEC 15.88 6.81 157 P1 TEH TEC 26 28 DSI 08H 0.02 0.25 46 P1 TEH TEC 26 30 DNI 07H 0.00 1.28 34 P1 TEH TEC 26 38 DSI 05H -0.05 0.09 94 P1 STH TEC 26 38 DSI 05H 0.05 0.22 42 P1 STH TEC 26 39 DSI 05H 0.00 0.41 29 P1 TEH TEC 26 42 DSI 02H 0.00 0.47 36 P1 TEH TEC 26 44 DSI 06H 0.00 0.31 162 P1 TEH TEC 26 45 DNI 06H 0.15 1.24 20 P1 TEH TEC 26 60 DNI 04H 0.00 1.54 39 P1 TEH TEC 26 65 DSI 03H 0.00 0.46 164 P1 TEH TEC 26 68 PCT AV4 -0.76 14 0.76 196 P2 TEH TEC 26 68 PCT AV2 0.25 19 1.17 61 P2 TEH TEC 26 70 DSI 03H 0.07 0.48 105 P1 TEH TEC 26 72 DSI 08H 0.02 0.22 64 P1 TEH TEC 26 72 DNI 06H 0.00 1.33 55 P1 TEH TEC 26 78 DNI 07H 0.02 1.30 49 P1 TEH TEC 26 79 DNI 06H -0.05 1.16 55 P1 TEH TEC 26 84 DNI 05H 0.20 1.25 46 P1 TEH TEC 27 12 DNI 04H 0.00 1.44 41 P1 TEH TEC 27 17 DNI 04H 0.07 0.95 19 P1 TEH TEC 27 20 DSI 02H -0.02 0.37 69 P1 TEH TEC 27 20 DNI 08H 0.02 1.38 53 P1 TEH TEC 27 21 DNI 02H 0.02 1.34 16 P1 TEH TEC 27 21 DNI 04H -0.12 1.51 13 P1 TEH TEC 27 22 DSI 02H 0.02 0.20 84 P1 TEH TEC 27 23 DNI 08H 0.00 1.44 55 P1 TEH TEC 27 23 DNI 07H 0.00 1.57 54 P1 TEH TEC 27 24 DSI 04H 0.05 0.18 14 P1 TEH TEC 27 26 DNI 07H 0.10 0.93 45 P1 TEH TEC 27 28 SCI TSH 0.02 0.38 69 0.53 0.14 95 P2 TSH TSH 27 29 SAI 03H 0.02 0.32 43 0.33 0.11 113 6

03H 03H Page 16 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 27 29 SCI TSH 0.03 0.16 52 0.40 0.14 154 P2 TSH TSH 27 29 DSI 04H 0.02 0.18 103 P1 TEH TEC 27 29 DSI 03H 0.02 0.59 107 P1 TEH TEC 27 31 SCI TSH -0.04 0.22 52 0.40 0.18 74 P2 TSH TSH 27 31 DSI 02H 0.00 0.92 74 P1 TEH TEC 27 33 SAI 03H 0.05 0.46 63 0.48 0.28 101 6

03H 03H 27 33 DSI 03H 0.10 0.18 83 P1 TEH TEC 27 35 DNI 07C 0.00 1.44 26 P1 STH TEC 27 35 DNI 07H 0.00 1.66 53 P1 STH TEC 27 35 DNI 08H 0.00 1.37 41 P1 STH TEC 27 60 DSI 02H 0.00 0.49 80 P1 TEH TEC 27 67 DNI 03H 0.17 1.68 18 P1 TEH TEC 27 69 DNI 04H 0.00 1.46 55 P1 TEH TEC 27 69 DSI 02H -0.02 0.32 131 P1 TEH TEC 27 72 DNI 05H 0.00 1.27 15 P1 TEH TEC 27 76 DSI 03H 0.05 0.35 11 P1 TEH TEC 27 78 DNI 05H 0.00 1.25 55 P1 TEH TEC 27 79 DSI 02H 0.05 0.28 134 P1 TEH TEC 28 10 DNI 04H 0.00 1.47 50 P1 TEH TEC 28 11 DNI 04H 0.02 1.45 33 P1 TEH TEC 28 18 DNI 05H -0.02 1.53 39 P1 TEH TEC 28 18 DNI 03H 0.02 1.27 51 P1 TEH TEC 28 22 DNI 06H -0.12 1.02 13 P1 TEH TEC 28 23 DNI 05H -0.05 1.28 34 P1 TEH TEC 28 26 DNI 02H -0.07 1.42 10 P1 TEH TEC 28 27 DNI 08H 0.00 1.25 34 P1 TEH TEC 28 27 DNI 07C 0.00 1.41 19 P1 TEH TEC 28 27 DSI 05H 0.02 0.39 81 P1 TEH TEC 28 29 DNI 03H 0.00 1.27 20 P1 TEH TEC 28 35 SCI TSH -0.11 0.25 31 0.23 0.10 119 P2 TSH TSH 28 35 DSI 02H 0.02 0.67 90 P1 TEH TEC 28 35 DNI 07H -0.07 1.67 47 P1 TEH TEC 28 37 DNI 07H 0.02 1.37 55 P1 TEH TEC 28 42 DSI 02H 0.02 0.14 117 P1 TEH TEC 28 42 DSI 04H 0.02 0.09 124 P1 TEH TEC 28 44 DSI 02H -0.02 0.25 117 P1 TEH TEC 28 44 DSI 03H -0.02 0.17 38 P1 TEH TEC 28 50 DSI 03H -0.02 0.26 136 P1 TEH TEC 28 50 DNI 08H -0.08 1.37 49 P1 TEH TEC 28 65 DNI 06C 0.00 1.68 12 P1 TEH TEC 28 70 DSI 08H -0.05 0.23 122 P1 STH TEC Page 17 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 28 71 DNI 05H 0.00 1.10 55 P1 TEH TEC 28 73 DSI 03H 0.00 0.15 62 P1 TEH TEC 28 73 DNI 06H 0.00 1.10 55 P1 TEH TEC 28 73 DSI 02H 0.00 0.17 108 P1 TEH TEC 28 74 DNI 03H 0.00 1.40 54 P1 TEH TEC 28 75 DNI 04H 0.02 1.54 23 P1 TEH TEC 28 76 DNI 07H 0.00 1.29 50 P1 TEH TEC 28 78 DNI 06H 0.00 1.40 53 P1 TEH TEC 28 79 NQI 08H 20.84 1.22 20 3

TEH TEC 28 79 DNI 06H 0.00 1.20 53 P1 TEH TEC 28 85 DSI 02H -0.05 0.39 102 P1 TEH TEC 29 11 DNI 04H -0.02 1.00 47 P1 TEH TEC 29 11 DSI 05H 0.20 0.32 101 P1 TEH TEC 29 20 DNI 08H 0.15 1.80 11 P1 TEH TEC 29 25 DNI 06H 0.00 1.83 39 P1 TEH TEC 29 26 DSI 05H 0.02 0.17 139 P1 TEH TEC 29 28 SAI 02H 0.00 0.11 37 0.28 0.05 120 P4 02H 02H 29 28 DSI 02H 0.00 0.43 123 P1 TEH TEC 29 29 DNI 08H 0.22 1.28 49 P1 TEH TEC 29 29 DNI 05H 0.00 1.50 50 P1 TEH TEC 29 29 DSI 03H -0.07 0.29 76 P1 TEH TEC 29 29 DSI 02H -0.02 0.53 37 P1 TEH TEC 29 29 SAI 02H -0.06 0.10 31 0.23 0.09 83 6

02H 02H 29 30 SAI 04H -0.03 0.11 38 0.29 0.09 147 P4 03H 04H 29 30 DSI 04H 0.07 0.21 29 P1 TEH TEC 29 36 DNI 08H 0.00 1.23 38 P1 TEH TEC 29 37 DSI 02H 0.00 0.27 37 P1 TEH TEC 29 38 DSI 05H -0.02 0.18 83 P1 TEH TEC 29 43 DNI 08H 0.00 1.06 55 P1 TEH TEC 29 43 DSI 03H -0.05 0.41 152 P1 TEH TEC 29 45 DNI 07H -0.07 1.17 55 P1 TEH TEC 29 46 DNI 07H -0.05 1.32 26 P1 TEH TEC 29 47 DSI 02H -0.03 0.25 122 P1 STH TEC 29 48 DNI 04H 0.00 1.31 43 P1 TEH TEC 29 49 DNI 07H 0.00 1.15 55 P1 TEH TEC 29 52 DSI 04H 0.02 0.25 113 P1 TEH TEC 29 57 DSI 05H 0.02 0.22 29 P1 TEH TEC 29 63 DSI 05H 0.05 0.22 103 P1 TEH TEC 29 64 DNI 06H 0.00 1.28 51 P1 TEH TEC 29 66 DNI 04H 0.00 1.58 54 P1 TEH TEC 29 66 DNI 06H 0.00 1.30 53 P1 TEH TEC Page 18 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 29 77 VOL TSC 1.44 0.06 84 6

TSC TSC 29 77 PCT TSC 1.44 10 0.21 28 0.17 0.06 84 6

TSC TSC 29 79 VOL TSC 0.13 0.14 89 6

TSC TSC 29 79 PCT TSC 0.13 17 0.16 32 0.25 0.14 89 6

TSC TSC 30 12 DSI 03H 0.02 0.16 64 P1 TEH TEC 30 24 DNI 08H 0.00 1.29 55 P1 STH TEC 30 24 DSI 02H -0.02 0.49 89 P1 STH TEC 30 25 DSI 04H 0.05 0.11 109 P1 TEH TEC 30 31 DSI 03H 0.05 0.25 88 P1 TEH TEC 30 31 DSI 04H 0.07 0.43 81 P1 TEH TEC 30 41 DSI 02H 0.00 0.16 143 P1 TEH TEC 30 57 DNI 07H 0.00 1.41 38 P1 STH TEC 30 58 DNI 08H 0.00 1.18 46 P1 STH TEC 30 60 DSI 02H 0.00 0.32 64 P1 TEH TEC 30 60 DSI 03H 0.10 0.68 106 P1 TEH TEC 30 60 DSI 04H 0.00 0.33 113 P1 TEH TEC 30 61 SAI 04H 0.07 0.42 105 0.80 0.13 112 P4 04H 04H 30 61 DSI 02H 0.00 0.67 86 P1 TEH TEC 30 61 DSI 06H -0.05 0.27 30 P1 TEH TEC 30 61 DSI 04H -0.02 0.57 81 P1 TEH TEC 30 62 DSI 04H -0.05 0.30 98 P1 STH TEC 30 64 DSI 04H 0.00 0.50 69 P1 STH TEC 30 64 DSI 02H 0.02 0.49 118 P1 STH TEC 30 64 SAI 04H 0.15 0.16 34 0.26 0.24 98 2

04H 04H 30 65 SAI 04H 0.00 0.34 78 0.60 0.18 88 6

04H 04H 30 65 DNI 08H 0.00 1.16 55 P1 TEH TEC 30 65 DNI 07H 0.00 1.22 55 P1 TEH TEC 30 65 DSI 04H 0.02 0.30 71 P1 TEH TEC 30 66 DNI 06H 0.07 1.51 54 P1 TEH TEC 30 66 DSI 04H -0.10 0.36 96 P1 TEH TEC 30 68 DNI 07H 0.00 1.33 49 P1 STH TEC 30 77 NQI 06H 40.17 0.27 106 3

TEH TEC 30 77 VOL 06H 40.17 0.12 62 6

06H 07H 30 77 PCT 06H 40.17 19 0.15 28 0.21 0.16 67 6

06H 07H 31 13 PCT AV2 0.18 13 0.60 72 P2 TEH TEC 31 14 DSI 05H 0.07 0.04 99 P1 TEH TEC 31 17 DSI 04H 0.10 0.09 158 P1 TEH TEC 31 22 DSI 02H 0.07 0.17 87 P1 TEH TEC 31 29 DSI 04H 0.00 0.56 150 P1 TEH TEC 31 31 DNI 05H -0.05 1.46 48 P1 TEH TEC 31 31 DNI 07H 0.00 1.36 46 P1 TEH TEC Page 19 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 31 37 DNI 03H 0.00 1.01 52 P1 TEH TEC 31 37 DNI 08H 0.00 1.01 41 P1 TEH TEC 31 49 DSI 02H 0.00 0.14 40 P1 TEH TEC 31 60 DSI 02H 0.00 0.14 70 P1 TEH TEC 31 60 DNI 07H 0.00 1.25 48 P1 TEH TEC 31 61 DSI 04H -0.02 0.33 145 P1 TEH TEC 31 61 DSI 03H 0.05 0.28 82 P1 TEH TEC 31 62 DNI 07H 0.00 1.40 50 P1 TEH TEC 31 62 DSI 03H 0.00 0.62 106 P1 TEH TEC 31 64 SAI 04H 0.00 0.19 34 0.26 0.14 99 P4 04H 04H 31 64 DNI 07H 0.00 1.35 53 P1 TEH TEC 31 64 DSI 04H 0.00 0.38 77 P1 TEH TEC 31 66 DSI 05H 0.05 0.16 104 P1 TEH TEC 31 66 DSI 02H -0.02 0.65 117 P1 TEH TEC 31 66 DSI 03H 0.07 0.13 108 P1 TEH TEC 31 66 DSI 04H -0.05 0.12 132 P1 TEH TEC 31 66 DNI 08H -0.02 1.38 39 P1 TEH TEC 31 69 DSI 03H 0.00 0.27 75 P1 TEH TEC 31 69 DSI 06H 0.00 0.99 67 P1 TEH TEC 31 69 SAI 06H 0.23 0.13 42 0.32 0.04 136 P4 06H 06H 31 72 DSI 04H -0.02 0.55 99 P1 TEH TEC 31 72 DSI 06H 0.00 0.99 55 P1 TEH TEC 31 72 SAI 06H 0.18 0.13 46 0.35 0.04 109 P4 06H 06H 31 74 DNI 05H 0.00 1.31 55 P1 TEH TEC 31 75 DSI 02H 0.02 0.24 117 P1 TEH TEC 31 75 DSI 02H 0.00 0.22 110 P1 TEH TEC 31 75 DNI 07H 0.00 1.26 55 P1 TEH TEC 31 75 SAI 02H 0.00 0.43 48 0.36 0.13 94 6

02H 02H 31 77 DSI 06H 0.00 0.24 63 P1 TEH TEC 31 78 DSI 04H 0.10 0.53 121 P1 TEH TEC 31 78 DNI 07H 0.00 1.34 55 P1 TEH TEC 31 78 DSI 03H 0.07 0.59 118 P1 TEH TEC 31 81 DSI 03H 0.07 0.56 114 P1 TEH TEC 31 81 DSI 02H -0.05 0.51 119 P1 TEH TEC 32 19 DSI 05H -0.02 0.14 120 P1 TEH TEC 32 25 DSI 03H 0.00 0.22 70 P1 TEH TEC 32 35 DNI 08H 0.07 1.36 47 P1 TEH TEC 32 36 DNI 05H 0.00 1.23 42 P1 TEH TEC 32 47 DNI 08H -0.02 1.29 28 P1 TEH TEC 32 47 DNI 06H 0.00 1.67 19 P1 TEH TEC 32 51 DNI 04H -0.15 1.75 19 P1 TEH TEC Page 20 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 32 62 DSI 02H -0.02 0.19 82 P1 TEH TEC 32 63 SAI 03H 0.17 0.31 62 0.47 0.20 97 6

03H 03H 32 63 DNI 06H 0.00 1.27 55 P1 TEH TEC 32 63 DSI 04H 0.00 0.28 62 P1 TEH TEC 32 63 DSI 03H 0.00 0.46 63 P1 TEH TEC 32 64 DSI 04H 0.05 0.16 53 P1 TEH TEC 32 64 DNI 07H 0.07 1.39 55 P1 TEH TEC 32 65 SAI 02H 0.19 0.18 55 0.42 0.08 102 6

02H 02H 32 65 DNI 06H 0.00 1.38 5

P1 TEH TEC 32 65 DSI 02H 0.02 0.45 81 P1 TEH TEC 32 66 DSI 02H 0.07 0.33 67 P1 TEH TEC 32 67 SAI 06H 0.00 0.26 54 0.41 0.14 87 6

06H 06H 32 67 DSI 06H 0.00 0.38 58 P1 TEH TEC 32 73 DNI 07H 0.00 1.42 55 P1 TEH TEC 32 74 DNI 07H 0.00 1.22 55 P1 TEH TEC 32 78 DSI 05H -0.02 0.37 104 P1 TEH TEC 32 79 SAI 02H 0.00 0.11 34 0.26 0.12 81 6

02H 02H 32 79 DSI 02H -0.02 0.56 142 P1 TEH TEC 33 34 DSI 06H 0.07 0.34 8

P1 TEH TEC 33 38 DNI 08H 0.00 1.19 42 P1 TEH TEC 33 50 DNI 05H 0.00 1.27 50 P1 TEH TEC 33 56 DNI 08H 0.22 1.62 10 P1 TEH TEC 33 56 DNI 07H 0.00 1.53 11 P1 TEH TEC 33 60 SAI 03H -0.25 0.18 71 0.54 0.08 74 P4 03H 03H 33 60 SAI 03H -0.09 0.18 52 0.40 0.09 106 P4 03H 03H 33 60 DSI 08H 0.07 0.17 26 P1 TEH TEC 33 60 DSI 03H -0.02 0.49 136 P1 TEH TEC 33 60 DSI 07H 0.12 0.18 58 P1 TEH TEC 33 61 DSI 04H 0.00 0.32 139 P1 TEH TEC 33 73 DNI 05H 0.00 1.12 55 P1 TEH TEC 33 75 DSI 05H 0.00 0.35 129 P1 TEH TEC 34 24 DSI 07H -0.07 0.13 124 P1 TEH TEC 34 26 DNI 04H 0.02 1.43 11 P1 TEH TEC 34 33 DNI 08H 0.07 1.22 50 P1 TEH TEC 34 39 DSI 05H -0.05 0.14 99 P1 TEH TEC 34 47 SCI TSH -0.13 0.27 145 1.10 0.15 101 P2 TSH TSH 34 55 DSI 03H 0.10 0.98 123 P1 TEH TEC 34 57 DNI 03H 0.00 1.28 54 P1 TEH TEC 34 58 DSI 02H 0.15 0.67 116 P1 TEH TEC 34 58 DSI 04H 0.00 0.13 70 P1 TEH TEC 34 58 DSI 05H -0.10 0.25 63 P1 TEH TEC Page 21 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 34 59 DSI 02H 0.00 0.58 94 P1 TEH TEC 35 22 DSI 02H -0.02 0.14 40 P1 TEH TEC 35 22 DSI 04H -0.04 0.99 136 P1 TEH TEC 35 22 DSI 07H 0.10 0.23 83 P1 TEH TEC 35 22 SAI 04H -0.04 0.23 37 0.28 0.12 80 P4 03H 04H 35 26 DNI 07H 0.12 1.62 18 P1 TEH TEC 35 26 DSI 05H 0.00 0.47 131 P1 TEH TEC 35 34 DSI 04H -0.02 0.11 106 P1 TEH TEC 35 34 DSI 03H 0.00 0.21 35 P1 TEH TEC 35 38 DSI 07H 0.00 0.11 98 P1 TEH TEC 35 45 DNI 07H 0.00 1.39 50 P1 TEH TEC 35 53 DSI 06H 0.02 0.26 154 P1 TEH TEC 35 59 DNI 05H -0.07 1.13 55 P1 TEH TEC 36 20 DSI 03H 0.12 0.32 92 P1 TEH TEC 36 26 DSI 05H 0.22 0.52 65 P1 TEH TEC 36 27 DSI 05H 0.02 0.24 78 P1 TEH TEC 36 51 SCI TSH -0.10 0.27 117 0.89 0.09 92 P2 TSH TSH 36 53 DSI 02H -0.05 0.72 172 P1 STH TEC 36 53 SAI 02H 0.09 0.38 22 0.16 0.10 133 2

02H 02H 37 23 DNI 03H 0.19 1.22 24 P1 TEH TEC 37 26 DSI 05H -0.02 0.09 159 P1 TEH TEC 37 33 DSI 04H 0.00 0.09 75 P1 TEH TEC 37 35 DSI 03H 0.00 0.17 67 P1 TEH TEC 37 36 DNI 08H 0.00 1.21 44 P1 TEH TEC 37 49 SCI TSH -0.13 0.22 112 0.86 0.16 119 P2 TSH TSH 37 51 DNI 08C -0.02 1.41 17 P1 TEH TEC 37 52 DSI 06H 0.07 0.12 85 P1 TEH TEC 37 67 PCT AV3 0.00 34 3.97 252 P2 TEH TEC 37 67 PCT AV2 0.00 32 3.63 229 P2 TEH TEC 37 67 PCT AV1 0.00 19 1.30 23 P2 TEH TEC 38 33 DNI 04H 0.00 1.37 55 P1 TEH TEC 38 42 DSI 05H -0.02 0.33 169 P1 TEH TEC 38 61 PCT AV4 0.03 14 0.91 150 P2 TEH TEC 39 27 DNI 06H 0.00 1.06 55 P1 TEH TEC 39 27 DSI 04H 0.02 0.37 21 P1 TEH TEC 39 40 DNI 08H 0.06 0.94 55 P1 TEH TEC 39 41 SCI TSH -0.08 0.10 54 0.41 0.16 117 P2 TSH TSH 39 43 DNI 07H 0.00 1.46 29 P1 TEH TEC 39 72 NQI 03C -0.27 0.27 112 P1 TEH TEC 39 72 PCT 03C -0.21 21 0.16 22 0.16 0.15 130 P4 03C 03C 39 72 VOL 03C -0.21 0.23 109 6

03C 03C Page 22 of 23

Beaver Valley Unit #2 2R24 Steam Generator Examination Results 2RCS-SG21C (TUBES WITH SERVICE INDUCED INDICATIONS)

ROW COL IND LOC INCH %TW LENGTH (Inches)

ANGLE (Degrees)

WIDTH (Inches)

VOLTS PHASE (Degrees)

CHAN FROM TO 40 25 DSI 03H 0.00 0.10 77 P1 TEH TEC 40 39 DSI 03H 0.05 0.26 166 P1 TEH TEC 40 52 SCI TSH -0.03 0.24 57 0.43 0.04 84 P2 TSH TSH 40 53 DSI 04H 0.07 0.30 154 P1 TEH TEC 40 60 PCT AV4 -0.02 21 1.68 32 P2 TEH TEC 40 60 PCT AV3 -0.15 13 0.83 15 P2 TEH TEC 40 63 DNI 08H 0.00 1.22 55 P1 TEH TEC 41 27 DSI 04H -0.02 0.17 84 P1 TEH TEC 41 44 DSI 04H 0.07 0.36 159 P1 TEH TEC 41 50 DSI 08H -0.05 0.12 73 P1 TEH TEC 41 63 DSI 02H -0.05 0.33 153 P1 TEH TEC 42 32 DSI 04H -0.05 0.14 89 P1 TEH TEC 45 38 DSI 01H -0.15 0.23 105 P1 TEH TEC 45 38 VOL 01H -0.30 0.18 94 6

01H 01H 45 38 PCT 01H -0.34 18 0.15 26 0.2 0.15 119 P4 01H 01H Page 23 of 23