L-2018-197, Submittal of Revision 19 to the Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and ISFSI Security Plan

From kanterella
(Redirected from L-2018-197)
Jump to navigation Jump to search
Submittal of Revision 19 to the Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and ISFSI Security Plan
ML18351A094
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 12/13/2018
From: Deboer D
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation, Office of Nuclear Security and Incident Response
References
L-2018-197
Download: ML18351A094 (2)


Text

SAFEGUARDS INFORMATION DEC 1 3 2018 L-2018-197 10 CFR 50.4(b)(4) 10 CFR 50.54(p)(2) 10 CFR 73.22 A TIN: Document Control Desk, Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Re: Florida Power and Light Company St. Lucie Units, 1 and 2, DocketNos: 50-335, 50-389 Revision 19 to the Physical Security Plan, Training and Qualification Plan,

\

Safeguards Contingency Plan and ISFSI Security Plan for St. Lucie Units 1 and 2 In accordapce with 10 CFR 50.4(b)(4), "Security plan and related submissions," and 10 CFR 50.54(p)(2), "Conditions oflicenses," Florida Power and Light Company (FPL), the licensee for

~t. Lucie Nuclear Plant, Units 1 and 2, hereby submits Revision 19 to the FPL St. Lucie Units* I and 2 Physical Security Plan, Training and Qualificatic;m Plan, Safeguards Contingency Plan and ISFSI Security Plan.

Revision 19 to the FPL St. Lucie Units 1 and 2 Physical Security Plan, Training and

. Qualification Plan, Safeguards Contingency Plan, and ISFSI Security Pl.an revises the description of Perimeter Gates as pr~vided in the. Change Synopsis. _

One document containing Safeguards Information (SGI}is included in thi; submissi9n and must be protected from public disclosure as*required by 10 CFR 73.22, "Protection of Safeguards Information: Specific Requirements." Two documents are Security Related Information (SRI) requested to be withheld from public disclosure in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding."

1. FPL St Lucie Units 1 and 2 PSP Rev 19. SGI
2. Change Synopsis FPL St. Lucie PSP Rev 19. SRI
3. 50.54(p) Submittal FPL St Lucie Psr Rev 19. SRI Should you have any question regarded this submittal, please contact Orlando Hernandez (Orlando.hemandez@fpl.com), Security Manager, at(772) 467-7594. :Soo/
  • Js1/ol

/'Jf(:_

SAFEGUARDS INFORMATION NS!~

(Enclosure contains Safeguards Information. Upon separation this page is decontrolled.)

Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

SAFEGUARDS lNFORMATION L-2018-197 Page2 Sincerely, Daniel DeBoer Site Director

  • St. Lucie Plant

Enclosures:

1. FPL St Lucie Units 1 and 2 PSP Rev 19. SGI
2. Change Synopsis PSP Rev 19. SRI
3. 50.54(p) FPL St Lucie Units 1 and 2 PSP Rev 19. SRI Cc: Binoy Desai, Region II (With enclosures)

USNRC Project Manager, St. Lucie and Turkey Point (Without enclosures)

Senior Resident Inspector, USNRC, St. Lucie (Without enclosures)

SAFEGUARDS INFORMATION (Enclosure contains Safeguards Information. Upon separation this page is decontrolled.)