Letter Sequence Response to RAI |
---|
|
|
|
|
---|
Category:Letter type:L
MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 L-2024-013, Submittal of Periodic Reports2024-03-28028 March 2024 Submittal of Periodic Reports L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-040, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-03-28028 March 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-044, Revised Steam Generator Tube Inspection Reports2024-03-19019 March 2024 Revised Steam Generator Tube Inspection Reports L-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-014, 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 2023 Annual Radioactive Effluent Release Report L-2024-025, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-02-22022 February 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-008, Supplement to License Amendment Request 278. Incorporate Advanced Fuel Products. Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2024-02-0909 February 2024 Supplement to License Amendment Request 278. Incorporate Advanced Fuel Products. Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-007, Inservice Inspection Program Owners Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owners Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-115, Inservice Inspection Program Owners Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owners Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, And Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 And Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update 2024-09-25
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARL-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-098, And Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 And Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-05-31031 May 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23151A4362023-05-24024 May 2023 License Amendment Request Revision 3 for the Technical Specifications Conversion to NUREG - 1431 Revision 5 ML23151A4372023-05-24024 May 2023 Attachment 3: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database ML23095A0082023-04-0404 April 2023 Attachment 2 - Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database L-2023-040, Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application2023-03-0303 March 2023 Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application L-2022-181, Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 52022-12-0101 December 2022 Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement2022-10-0505 October 2022 Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement L-2022-136, Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report2022-08-12012 August 2022 Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report L-2022-051, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II, Supplement Information and Response to Request for Additional Information2022-03-29029 March 2022 Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II, Supplement Information and Response to Request for Additional Information L-2021-213, Response to Request for Additional Information Regarding License Amendment Request 273, Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum LOCA Methodology2021-11-19019 November 2021 Response to Request for Additional Information Regarding License Amendment Request 273, Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum LOCA Methodology L-2021-207, Response to Request for Additional Information for ISI Relief Request No. 102021-10-25025 October 2021 Response to Request for Additional Information for ISI Relief Request No. 10 L-2021-197, Response to Request for Additional Information for ISI Relief Request No. 102021-10-15015 October 2021 Response to Request for Additional Information for ISI Relief Request No. 10 ML21258A3792021-09-14014 September 2021 Response to Request for Additional Information, Relief Requests 8 and 9 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1), Extension of Inspection Interval for Turkey Point Unit 3 and Unit 4 Reactor. L-2020-111, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report2020-06-24024 June 2020 Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report L-2020-081, Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor2020-06-0808 June 2020 Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor L-2020-083, Supplemental Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Re2020-05-21021 May 2020 Supplemental Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Re L-2020-071, Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Requirements2020-04-16016 April 2020 Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Requirements L-2020-064, Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information2020-04-0909 April 2020 Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information ML20098F3412020-04-0707 April 2020 Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information L-2019-135, Response to Request for Additional Information Regarding License Amendment Request 266, Clarify Requirements When One Unit Is Outside the Applicability of Certain Technical Specifications2019-07-22022 July 2019 Response to Request for Additional Information Regarding License Amendment Request 266, Clarify Requirements When One Unit Is Outside the Applicability of Certain Technical Specifications ML19158A5032019-06-0707 June 2019 NRC to NMFS, NRC Responses to NMFS Requests for Additional Information for Turkey Point ESA Section 7 Consultation L-2019-114, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 10, RAI No. B.2.3.28-1b Updated Response2019-06-0404 June 2019 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 10, RAI No. B.2.3.28-1b Updated Response L-2019-048, Response to Request for Additional Information (Rai), Subsequent License Renewal Application Safety Review Revision 1, Second Submittal Set 82019-03-15015 March 2019 Response to Request for Additional Information (Rai), Subsequent License Renewal Application Safety Review Revision 1, Second Submittal Set 8 L-2019-037, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 9 Responses2019-03-0606 March 2019 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 9 Responses L-2019-033, Response to Requests for Additional Information Subsequent License Renewal Application Safety Review Revision 1, Set 8 First Submittal Responses2019-03-0101 March 2019 Response to Requests for Additional Information Subsequent License Renewal Application Safety Review Revision 1, Set 8 First Submittal Responses ML19056A1252019-02-25025 February 2019 Turky Point SLRA RAIs 1 2 3 4 5 6 7 8 9 11 - Set 8 Rev 1 Irradiated Concrete-Steel Responses L-2019-012, Response to Follow-on NRC RAI No. B.2.3.9-1 a2019-02-13013 February 2019 Response to Follow-on NRC RAI No. B.2.3.9-1 a L-2019-023, Response to Request for Additional Information Regarding License Amendment Request 265, Revise NFPA-805 License Condition for Reactor Coolant Pump Seals2019-01-31031 January 2019 Response to Request for Additional Information Regarding License Amendment Request 265, Revise NFPA-805 License Condition for Reactor Coolant Pump Seals L-2018-234, Subsequent License Renewal Application Safety Review Request for Additional Information (RAI) Set 5 Response 4.3.5-2 Revision2018-12-21021 December 2018 Subsequent License Renewal Application Safety Review Request for Additional Information (RAI) Set 5 Response 4.3.5-2 Revision L-2018-223, Subsequent License Renewal Application Safety Review - November 15, 2018 Public Meeting Action Item Responses2018-12-14014 December 2018 Subsequent License Renewal Application Safety Review - November 15, 2018 Public Meeting Action Item Responses L-2018-222, Subsequent License Renewal Application Safety Review - November 13, 2018 Public Meeting Discussion Topic Responses2018-12-12012 December 2018 Subsequent License Renewal Application Safety Review - November 13, 2018 Public Meeting Discussion Topic Responses L-2018-218, Supplemental Response to Request for Additional Information (RAI) Set 1, Subsequent License Renewal Application Environmental Review2018-11-28028 November 2018 Supplemental Response to Request for Additional Information (RAI) Set 1, Subsequent License Renewal Application Environmental Review L-2018-191, Supplemental Responses Requests for Additional Information (RAI) Set 7 Subsequent License Renewal Application Safety Review2018-11-28028 November 2018 Supplemental Responses Requests for Additional Information (RAI) Set 7 Subsequent License Renewal Application Safety Review L-2018-193, Set 6 Responses to Request for Additional Information (RAI) on Subsequent License Renewal Application Safety Review2018-11-0202 November 2018 Set 6 Responses to Request for Additional Information (RAI) on Subsequent License Renewal Application Safety Review L-2018-166, WCAP-15355-NP, Revision 0, a Demonstration of Applicability of ASME Code Case N-481 to the Primary Loop Pump Casings.2018-10-31031 October 2018 WCAP-15355-NP, Revision 0, a Demonstration of Applicability of ASME Code Case N-481 to the Primary Loop Pump Casings. ML18299A1142018-10-24024 October 2018 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 4 Responses L-2018-175, Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses2018-10-17017 October 2018 Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses L-2018-176, Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items2018-10-17017 October 2018 Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items ML18296A0242018-10-16016 October 2018 Set 3 Response to Request for Additional Information to Subsequent License Renewal Application Safety Review ML18299A1162018-10-15015 October 2018 Structural Integrity Associates Engineering Report No. 1700109.401P, Revision 7 - Redacted, Evaluation of Environmentally-Assisted Fatigue for Turkey Point Units 3 and 4 for Subsequent License Renewal 2024-09-24
[Table view] |
Text
March 25, 2016 L-2016-056 10 CFR 50.90 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Re: Turkey Point Nuclear Plant, Units 3 and 4 Docket Nos. 50-250 and 50-251 Response to Request for Additional Information Regarding License Amendment Request 240, Conditional Exemption from End-of-Life Moderator Temperature Coefficient Measurement
References:
- 1. Florida Power & Light letter L-2015-189 "License Amendment Request 240, Conditional Exemption from End-of-Life Moderator Temperature Coefficient Measurement," October 6, 2015(ML15301A261).
- 2. NRC E-mail from A Klett to M. Guth "Request for Additional Information re. Turkey Point Unit 3 and 4 LAR 240 (CACs MF6783 and MF6784)," March 4, 2016.
In Reference 1, Florida Power & Light Company (FPL) submitted a license amendment request (LAR) to revise the technical specifications (TS) for Turkey Point Units 3 and 4. The proposed change revises the end-of-life moderator temperature coefficient (MTC) surveillance requirement by placing a set of conditions on reactor core operation, which if met, would allow exemption from the required MTC measurement.
In Reference 2, the NRC staff requested additional information to support its review of the lAR.
The enclosure to this letter provides FPL's response to the request for additional information. to the enclosure provides a markup of the TS showing proposed changes to TS 6.9.1. 7, Core Operating Limits Report (COLR). Retyped pages containing the proposed changes are included in Attachment 2. Attachment 3 to the enclosure, which is provided for information only and supersedes Attachment 3 in Reference 1, shows changes to the COLR.
This response to the request for additional information does not alter the conclusions in Reference 1 that the proposed change does not involve a significant hazards consideration and there are no significant environmental impacts associated with the change.
In accordance with 10 CFR 50.91 (b)(1), a copy of this letter is being forwarded to the designee of the State of Florida. I
_Fl_or_id_a_Po_w_er_&_L_ig_ht_c_o_mp_a_ny~~~~~~~~~~~~~~~~~~~~~~~~~-/r"~~f-9760 SW 344 St Homestead, FL 33035 / \J
L-2016-056 Page 2 of 2 No new or revised commitments are included in this submittal.
Should you have any questions regarding this submittal, please contact Mr. Mitch Guth, Licensing Manager, at 305-246-6698.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on March 25, 2016 Sincerely, Thomas Summers .
Site Vice President Turkey Point Nuclear Plant Enclosure Attachments cc: NRG Regional Administrator, Region II NRG Senior Resident Inspector NRG Project Manager Ms. Cindy Becker, Florida Department of Health
L-2016-056 Enclosure ENCLOSURE Response to Request for Additional Information Regarding License Amendment Request 240, Conditional Exemption from End-of-Life Moderator Temperature Coefficient Measurement
- L-2016-056 Enclosure Page 1of2 Response to Request for Additional Information (RAI)
By application dated October 6, 2015 (Agentywide Documents Access and Management System (ADAMS) Accession No. ML15301A261), Florida Power & Light Company (FPL, the licensee) submitted License Amendment Request (LAR) No. 240 for Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point). NRC's Reactor Systems Branch (SRXB) staff reviewed the application and identified areas where it needs additional information to support its review. The request for additional information (RAI) is provided below.
SRXB-RAl-1 In Section 4.2 of the LAR, it is stated that the request varies from the precedents in that it does not add a reference to WCAP-13749-P-A in Technical Specification (TS) 6.9.1.7, "Core Operating Limits Report [COLR]," and cites that the TS example changes provided in
- WCAP-137 49-P-A do not include a revision to the TS requirements for the COLR. However, per the Note in Appendix B of WCAP-137 49-P-A, and taking into consideration Section 2.3.3 of Appendix B, it is stated that WCAP-13749-P-A must be included in the TS COLR section.
Additionally, the staff reviewed other recent similar precedents and found that in all those precedents, WCAP-13749-P-A was included in the TS COLR section. Please supplement the LAR to meet the requirements in WCAP-13749-P-A for inclusion of it in the TS COLR section and to be consistent with the precedents.
Response to SRXB-RAI-~
FPL is supplementing the LAR to include WCAP-137 49-P-A, "Safety Evaluation Supporting the Conditional Exemption of the Most Negative Moderator Temperature Coefficient Measurement," March 1997, in TS 6.9.1.7, Core Operating Limits Report. Attachment 1 provides a markup of the TS showing the proposed change.
SRXB-RAl-2 In Section 3.0 of the LAR, the licensee stated that the PHOENIX-P code is currently used for Turkey Point and that the cross section generation may eventually transition to the PARAGON lattice code and NEXUS methodology. In the LAR, Attachment 5, response to Farley and Vogtle RAI Question 2, it is stated that Turkey Point does not propose to add PHOENIX-P, PARAGON, or NEXUS to the listed COLR references in the TSs and cites .
Vogtle as a precedent. However, the NRC staff has reviewed the Vogtle COLR references in its TSs and has found that Vogtle included PARAGON and NEXUS in the TS COLR references. Additionally, the staff reviewed other recent similar precedents and found that the neutronics methods are included in the TS COLR section. Therefore, the staff requests that the neutronics methods used to confirm moderator temperature coefficient (MTC) reload parameters be included in the TS COLR section to be consistent with the previous prec'edents and that future COLRs identify the neutronics methods used with WCAP-13749-P-A for the current cycle.
L-2016-056 Enclosure Page 2 of 2 Response to SRXB-RAl-2 FPL is supplementing the LAR to include in TS 6.9.1.7, Core Operating Limits Report, the neutronics methods used with WCAP-13729-P-A. Attachment 1 provides a markup of the TS showing the proposed change.
The Core Operating Limits Report provided to the NRC in accordance with TS 6.9.1. 7 will identify the neutronics methods used with WCAP-137 49-P-A for the current cycle.
SRXB-RAl-3 In the LAR, Attachment 3, "Changes to COLR," the units used in the Revised Predicted MTC equation are inconsistent with those in the COLR, Section 2.6 (PCM/degree F vs. b.k/k/°F, respectively). In order for the comparison of the Revised Predicted MTC to the Surveillance Requirement (SR) 4.1.1.3,b surveillance limit to be valid, the staff requests the licensee to modify this inconsistency in the MTC units.
Response to SRXB-RAl-3 Section 2.6 of the COLR provides the MTC surveillance limit for SR 4.1.1.3.b. This value will be provided in units of PCM for consistency when comparing the limit to the revised predicted MTC, which is specified in units of PCM. Attachment 3, which is provided for information only, shows the proposed changes to the COLR.
L-2016-056 Attachment 1 Attachment 1 Markup of Technical Specification Page
ADMINISTRATIVE CONTROLS
- 3. WCAP-10054-P-A, Addendum 2, Revision 1 (proprietary), "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection into the Broken Loop and COSI Condensation Model ," July 1997.
- 4. WCAP-16009-P-A, "Realistic Large-break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)", January 2005.
- 5. USN RC Safety Evaluation Report, Letter from R. C. Jones (USNRC) to N. J. Liparulo CYYJ .
"Acceptance for Referencing of the Topical Report WCAP-12945(P) 'Westinghouse Code Qualification Document for Best Estimate Loss of Coolant Analysis,' " June 28, 1996.**
- 6. Letter dated June 13, 1996, from N. J. Liparulo ('l::!J to Frank R. Orr (USNRC) , "Re-Analysis Work Plans Using Final Best Estimate Methodology."**
- 7. WCAP-12610-P-A, "VANTAGE+ Fuel Assembly Reference Core Report, S. L. Davidson and T. L. Ryan , April 1995.
- 8. WCAP-12610-P-A & CENPD-404-P-A, Addendum 1-A, "Optimized ZIRLO' , July 2006.
The analytical methods used to determine Overtemperature t... T and Overpower t... T shall be those previously reviewed and approved by the NRC in:
- 1. WCAP-87 45-P-A, "Design Basis for the Thermal Overtemperature t... T and Overpower t... T Trip Functions, " September 1986
- 2. WCAP-9272-P-A, " Westinghouse Reload Safety Evaluation Methodology, July 1985 The analytical methods used to determine Safety Limits, Shutdown Margin - Tavg > 200°F, Shutdown Margin -
Tavg .'.: _ 200°F, Moderator Temperature Coefficient, DNB Parameters, Rod Bank Insertion Limits and the All Rods Out position shall be those previously reviewed and approved by the NRC in:
~
i:;-- 1. WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology, July 1985.
The ability to calculate the COLR nuclear design parameters are demonstrated in :
- 1. Florida Power & Light Company Topical Report NF-TR-95-01 , "Nuclear Physics Methodology for Reload Design of Turkey Point & St. Lucie Nuclear Plants. "
Topical Report NF-TR-95-01 was approved by the NRC for use by Florida Power & Light Company in:
- 1. Safety Evaluation by the Office of Nuclear Reactor Regulations Related to Amendment No. 174 to Facility Operating License DPR-31 and Amendment No. 168 to Facility Operating License DPR-41 , Florida Power & Light Company Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251 .
The AFD , F0 (Z), F,..H, K(Z), Safety Limits, Overtemperature t...T, Overpower t...T, Shutdown Margin - Tavg > 200°F, Shutdown Margin -Tavg .'.: _ 200°F, Moderator Temperature Coefficient, DNB Parameters, and Rod Bank Insertion Limits shall be determined such that all applicable limits of the safety analyses are met. The CORE OPERATING LIMITS REPORT, including any mid-cycle revisions or supplements thereto, shall be provided upon issuance, for each reload cycle, to the NRC Document Control Desk with copies to the Regional Administrator and Resident Inspector, unless otherwise approved by the Commission.
- As evaluated in NRC Safety Evaluation dated December 20, 1997.
TURKEY POINT - UNITS 3 & 4 6-19 AMENDMENT NOS. ~AND ~ I
INSERT The analytical methods used to support the suspension of the measurement of the Moderator Temperature Coefficient in accordance with Surveillance Requirement 4.1.1.3.b shall be those previously reviewed and approved by the NRC in:
- 1. WCAP-137 49-P-A, "Safety Evaluation Supporting the Conditional Exemption of the Most Negative EOL Moderator Temperature Coefficient Measurement," March 1997.
- 2. WCAP-11596-P-A, "Qualification of the Phoenix-P/ANC Nuclear Design System for Pressurized Water Reactor Cores," June 1988.
- 3. WCAP-16045-P-A, ;'Qualification of the Two-Dimensional Transport Code PARAGON," August 2004.
- 4. WCAP-16045-P-A, Addendum 1-A, "Qualification of the NEXUS Nuclear Data Methodology," August 2007.
L-2016-056 Attachment 2 Attachment 2 Clean Revised Technical Specification Page
ADMINISTRATIVE CONTROLS
- 3. WCAP-10054-P-A, Addendum 2, Revision 1 (proprietary), "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection into the Broken Loop and COSI Condensation Model," July 1997.
- 4. WCAP-16009-P-A, "Realistic Large-break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)", January 2005.
- 5. USNRC Safety Evaluation Report, Letter from R. C. Jones (USNRC) to N. J. Liparulo (W'J, "Acceptance for Referencing of the Topical Report WCAP-12945(P) 'Westinghouse Code Qualification Document for Best Estimate Loss of Coolant Analysis,' " June 28, 1996. **
- 6. Letter dated June 13, 1996, from N. J. Liparulo (W'J to Frank R. Orr (USNRC), "Re-Analysis Work Plans Using Final Best Estimate Methodology."**
- 7. WCAP-12610-P-A, "VANTAGE+ Fuel Assembly Reference Core Report," S. L. Davidson and T. L. Ryan, April 1995.
- 8. WCAP-12610-P-A & CENPD-404-P-A, Addendum 1-A, "Optimized ZIRLO'," July 2006.
The analytical methods used to determine Overtemperature !!:,.T and Overpower~ T shall be those previously reviewed and approved by the NRC in:
- 1. WCAP-8745-P-A, "Design Basis for the Thermal Overtemperature !!:,.T and Overpower!!:,.T Trip Functions, " September 1986
- 2. WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 The analytical methods used to determine Safety Limits, Shutdown Margin - Tavg > 200°F, Shutdown Margin -
Tavg ~ 200°F, Moderator Temperature Coefficient, DNB Parameters, Rod Bank Insertion Limits and the All Rods Out position shall be those previously reviewed and approved by the NRC in:
- 1. WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
The analytical methods used to support the suspension of the measurement of the Moderator Temperature Coefficient in accordance with Surveillance Requirement 4.1.1.3.b shall be those previously reviewed and approved by the NRC in:
- 1. WCAP-13749-P-A, "Safety Evaluation Supporting the Conditional Exemption of the Most Negative EOL Moderator Temperature Coefficient Measurement," March 1997.
- 2. WCAP-11596-P-A, "Qualification of the Phoenix-P/ANC Nuclear Design System for Pressurized Water Reactor Cores," June 1988.
- 3. WCAP-16045-P-A, "Qualification of the Two-Dimensional Transport Code PARAGON," August 2004. .
- 4. WCAP-16045-P-A, Addendum 1-A, "Qualification of the NEXUS Nuclear Data Methodology,"
August 2007.
- As evaluated in NRC Safety Evaluation dated December 20, 1997.
TURKEY POINT - UNITS 3 & 4 6-19 AMENDMENTNOS. AND
ADMINISTRATIVE CONTROLS The ability to calculate the COLR nuclear design parameters are demonstrated in:
- 1. Florida Power & Light Company Topical Report NF-TR-95-01, "Nuclear Physics Methodology for Reload Design of Turkey Point & St. Lucie Nuclear Plants."
Topical Report NF-TR-95-01 was approved by the NRG for use by Florida Power & Light Company in:
- 1. Safety Evaluation by the Office of Nuclear Reactor Regulations Related to Amendment No. 174 to Facility Operating License DPR-31 and Amendment No. 168 to Facility Operating License DPR-41, Florida Power & Light Company Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251.
The AFD, Fa(Z), FaH, K(Z), Safety Limits, Overtemperature b..T, Overpower b..T, Shutdown Margin - Tavg > 200°F, Shutdown Margin -Tavg ~ 200°F, Moderator Temperature Coefficient, DNB Parameters, and Rod Bank Insertion Limits shall be determined such that all applicable limits of the safety analyses are met. The CORE OPERATING LIMITS REPORT, including any mid-cycle revisions or supplements thereto, shall be provided upon issuance, for each reload cycle, to the NRG Document Control Desk with copies to the Regional Administrator and Resident Inspector, unless otherwise approved by the Commission.
TURKEY POINT - UNITS 3 & 4 6-19A AMENDMENT NOS. AND I
L-2016-056 Attachment 3 Attachment 3 Change to Core Operating Limits Report (Information Only)
EC 279407 PTN-3FJF-13-080 Rev. 0 2.5 Moderator temperature coefficient (MTC) (TS 3.1.1.3) s + 5.0 x 10-5 Aklk/°F BOL, HZP, ARO and, from HZP to 70% Rated Thermal Power (RTP)
From 70% RTP to 100% RTP the MTC decreasing linearly from s + 5.0 x 10*5 Ak/k/°F to s 0.0 x 10- Aklk/°F 5
5 Less negative than - 41.0 x 10- Aklk/°F EOL, RTP, ARO 2.6 Moderator temperature coefficient (MTC) Surveillance at 300 ppm (TS 4.1.1.3) 5 Less negative than - 35.0 x 10" Ak/k/°F Within 7 EFPD of reaching equilibrium boron concentration of
~(-----11! nsert 1 I 300 ppm.
(-35 PCM/° F)
- 2. 7 Analog Rod Position Indication System (TS 3.1.3.2)
Figure A3 (page 14A-A9) The All Rods Out (ARO) position for all shutdown Banks and Control Banks is defined to be 230 steps withdrawn.
2.8 Control Rod Insertion Limits (TS 3.1.3.6)
Figure A3 (page 14A-A9) The control rod banks shall be limited in physical insertion as specified in Figure A3 for ARO = 230 steps withdrawn.
2.9 Axial Flux Difference (TS 3.2.1)
Figure A4 (page 14A-A10) 2.10 Heat Flux Hot Channel Factor Fa(Z) (TS 3.2.2)
[Fa]L =2.30 K(z) =1.0 For O' s z s 12' where z is core height in ft 14A-A5
J
- Insert 1 The Revised Predicted near - EOL 300 ppm MTC shall be calculated using the algorithm contained in WCAP-13749-P-A:
Revised Predicted MTC = Predicted MTC + AFD Correction - 3 PCM/degree F If the Revised Predicted MTC is less negative than the SR 4.1.1.3.b 300 ppm surveillance limit and all the benchmark data contained in the surveillance procedure are met, then an MTC measurement in accordance with SR 4.1.1.3.b is not required to be performed.