MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 L-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-042, Periodic Update of Population Data within 10 and 50 Miles of the Plant2023-03-27027 March 2023 Periodic Update of Population Data within 10 and 50 Miles of the Plant L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-039, Cycle 27 Core Operating Limits Report2023-03-0707 March 2023 Cycle 27 Core Operating Limits Report L-2023-032, 2022 Annual Radioactive Effluent Release Report2023-02-28028 February 2023 2022 Annual Radioactive Effluent Release Report L-2023-038, 2022 Annual Operating Report2023-02-28028 February 2023 2022 Annual Operating Report L-2023-016, Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan2023-02-15015 February 2023 Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan L-2023-019, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20222023-02-15015 February 2023 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2022 L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report L-2022-188, Unusual or Important Environmental Event - Turtle Mortality2022-12-19019 December 2022 Unusual or Important Environmental Event - Turtle Mortality L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 2024-01-08
[Table view] |
Text
0 . Florida Power &Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 FLk September 2, 2011 L-2011-354 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Re: St. Lucie Plant Unit 1 Docket No. 50-335 Renewed Facility Operating License No. DPR-67 Response to Containment & Ventilation Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request
References:
(1) R. L. Anderson (FPL) to U.S. Nuclear Regulatory Commission (L-2010-259),
"License Amendment Request (LAR) for Extended Power Uprate," November 22, 2010, Accession No. ML103560419.
(2) Email from T. Orf (NRC) to C. Wasik (FPL), "St. Lucie 1 EPU followups from Containment and Ventilation (SCVB)," July 26, 2011.
By letter L-2010-259 dated November 22, 2010 [Reference 1], Florida Power & Light Company (FPL) requested to amend Renewed Facility Operating License No. DPR-67 and revise the St. Lucie Unit 1 Technical Specifications (TS). The proposed amendment will increase the unit's licensed core thermal power level from 2700 megawatts thermal (MWt) to 3020 MWt and revise the Renewed Facility Operating License and TS to support operation at this increased core thermal power level. This represents an approximate increase of 11.85% and is therefore considered an Extended Power Uprate (EPU).
By email from the NRC Project Manager dated July 26, 2011 [Reference 2], additional information was requested by the NRC staff in the Containment & Ventilation Branch (SCVB) to support their review of the EPU LAR. The request for additional information (RAI) identified two follow-up questions to a previous FPL RAI response and one new question. The response to these three RAIs is provided in Attachment 1 to this letter.
94&
an FPL Group company
L-2011-354 Page 2 of 2 In accordance with 10 CFR 50.91 (b)(1), a copy of this letter is being forwarded to the designated State of Florida official.
This submittal does not alter the significant hazards consideration or environmental assessment previously submitted by FPL letter L-2010-259 [Reference 1].
This submittal contains no new commitments and no revisions to existing commitments.
Should you have any questions regarding this submittal, please contact Mr. Christopher Wasik, St. Lucie Extended Power Uprate LAR Project Manager, at 772-467-7138.
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge.
Executed on o*a- 3e,, p wJoEr -&I0 1 Very truly yours, Richard L. Anderson Site Vice President St. Lucie Plant Attachment cc: Mr. William Passetti, Florida Department of Health
L-2011-354 Attachment 1 Page 1 of 3 Response to Request for Additional Information The following information is provided by Florida Power & Light (FPL) in response to the U. S. Nuclear Regulatory Commission's (NRC) Request for Additional Information (RAI).
This information was requested to support Extended Power Uprate (EPU) License Amendment Request (LAR) for St. Lucie Nuclear Plant Unit 1 that was submitted to the NRC by FPL via letter (L-2010-259) dated November 22, 2010, Accession Number ML103560419.
In an email dated April 22, 2011 from NRC (Tracy Orf) to FPL (Chris Wasik), "St. Lucie Unit 1 EPU - request for additional information (Containment and Ventilation),"
(Accession Number ML111120264), the NRC staff requested additional information regarding FPL's PSL1 EPU LAR. The RAI consisted of fifteen (15) questions from the NRC's Containment and Ventilation Branch (SCVB). The responses to the 15 RAI questions were submitted to the NRC via FPL letter (L-2011-187) dated May 18, 2011 Accession Number ML11145A087.
In an email dated July 26, 2011 from NRC (Tracy Orf) to FPL (Chris Wasik), "St. Lucie 1 EPU followups from Containment and Ventilation (SCVB)," the NRC's Containment &
Ventilation Branch requested additional information regarding FPL's PSL1 EPU LAR and the May 1 8 th RAI response. The July 2 6 th RAI consisted of two follow-up questions and one new question. With the agreement of the NRC Project Manager and to prevent confusion, the questions have been numbered as SCVB-16, SCVB-17, and SCVB-18.
These three RAI questions and the FPL responses are documented below.
RAI SCVB-16 rComment on response to RAI # SCVB-51 The first paragraph of the response is in conflict with the last paragraph. The first paragraph states: "EPU has no effect that needs to be addressed to resolve the concerns of GSI-191--. The last paragraph states: "As part of the resolution of GSI-191, the sump strainer head losses will be re-evaluated to include consideration of changes resulting from EPU as well as potential changes in the strainer debris loading." Please clarify which statement is correct.
RAI SCVB-17 [Comment on response to RAI # SCVB-61 Refer to statement in response to SCVB 5: "As part of the resolution of GSI-191, the sump strainer head losses will be re-evaluated to include consideration of changes resulting from EPU as well as potential changes in the strainer debris loading." This statement implies that Table 2 "NPSH Calculation Recirculation Mode Design Case" of the SCVB-6 response does not provide the EPU results because the sump screen head loss may be higher thus lowering the NPSH margin.
L-2011-354 Attachment 1 Page 2 of 3 Response to SCVB-16 & SCVB-17 A single response to these two draft RAls is provided since both draft RAls are related to clarification of GSI-191 statements made in FPL's response to RAI SCVB-5 [FPL Letter L-2011-187, dated May 18, 2011, ML11145A087].
The response to RAI SCVB-5 was intended to note that EPU does not significantly impact the St. Lucie GSI-191 resolution effort. The confusing statement in the SCVB-5 response states: "As part of the resolution of GSI-191, the sump strainer head losses will be re-evaluated to include consideration of changes resulting from EPU as well as potential changes in strainer debris loading." This statement was not intended to reflect the need for a GSI-1 91 re-analysis in order to address EPU; rather, it was intended to recognize the on-going nature of the GSI-1 91 resolution and that any future GS-1 91 analyses will include EPU conditions.
The NPSH values provided in the FPL response to SCVB-6 reflect the integration of EPU conditions with the current GSI-191 resolution effort and are considered final.
RAI SCVB-18 Section 2.6.1.2.2 states: "The blowdown is limited to one SG due to reverse flow check valve which prevents flow from unaffected side SG." Please explain why the case of considering failure of the reverse flow check valve which would allow the steam header volume to participate in the blowdown was not analyzed as one of the single failure cases.
Please note that similar case described in Section 2.6.1.2.2 of St. Lucie Unit 2 LR was analyzed as stated in the Section: "Failure of one MSIV to close would allow the steam header volume to participate in the blowdown. This failure is considered in the analysis as one of the potential single failures."
Response to SCVB-1 8 For Unit 1, the main steam isolation check valve (MSCV) prevents reverse steam flow and is credited to prevent any blowdown of the steam header and intact steam generator (SG) immediately following a MSLB. This is in agreement with the current Unit 1 UFSAR, which in Section 6.2.1.3.2.B.2.A states:
Backflow for the St. Lucie design is essentially zero since the check valve downstream of the isolation valve of the faulted steam generatorwould close immediately on flow reversal,thereby terminatingthe reverse steam flow. The operationof the reverseflow check valve has been credited in the analysis.
In accordance with SECY-77-439 (Section 2.D), failure of a check valve to close is considered a passive failure. Standard Review Plan Section 6.2.1.4 (Mass and Energy Release Analysis for Postulated Secondary System Pipe Ruptures) states: "steam and feedwater line break analyses should assume a single active failure in the steam or
L-2011-354 Attachment 1 Page 3 of 3 feedwater line isolations provisions." As such, the passive failure of the MSCV does not need to be considered in the Unit 1 MSLB analysis.
The MSIVs in Unit 2 are of a different design, they are one valve, not back to back check valves like the Unit 1 design. The header and intact SG are isolated upon MSIV closure.
Therefore, blowdown of the header and intact SG is considered for Unit 2 in containment MSLB analyses until MSIV closure. In addition, since the MSIV is actuated electrically, failure of the MSIV in Unit 2 is an active failure and is analyzed accordingly.
Nevertheless, a sensitivity study for Unit 1 analyzing the MSCV failure was conducted.
Peak containment pressure for the sensitivity study with a single failure of the MSCV, crediting the containment fan coolers, crediting the containment liner as a heat sink and modeling the MSIV closure as a linear ramp is determined to be lower than the limiting case in the EPU MSLB analysis.