0 0

FPL.

PL L-2009-268 November 13, 2009 POWERING TODAY.

EMPOWERING TOMORROW.

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington D.C. 20555-0001 Re: Turkey Point Unit 3 Docket No. 50-250 License Amendment No. 234 for Turkey Point Unit 3 Notice of Inability to Implement

References:

1. Letter from Michael Kiley (FPL) to USNRC, "Implementation Date Change for License Amendments 234 and 229," L-2009-200, September 1, 2009.
2. Letter from B. L. Mozafari (USNRC) to J. A. Stall (FPL), "Turkey Point Plant Units 3 and 4 -

Issuance of Amendments Regarding Spent Fuel Boraflex Remedy (TAC No. MC9740 and MC974 1)," July 17, 2007.

3. Letter from Michael Kiley (FPL) to USNRC, "Withdrawal of License Amendment Request No.

201 for Turkey Point Unit 3" L-2009-260, November 9, 2009.

4. Letter from Michael Kiley (FPL) to USNRC, "Issuance of Amendment Regarding Spent Fuel Pool Boraflex Remedy, Supplement 3 to Request for a Change in Implementation Date," L-2009-249, October 31, 2009.

Florida Power and Light Company (FPL) submitted an application for amendment of the Turkey Point Unit 3 and 4 licenses in Reference 1. The application concerned a revision to the implementation dates for the license amendments issued by the NRC staff in Reference 2. FPL withdrew the Reference 1 application for Unit 3 in Reference 3. The purpose of this letter is to inform the NRC that FPL will not be able to implement Amendment No. 234 to Renewed Facility Operating License No. DPR-31 for Turkey Point Unit 3 prior to the end of Turkey Point Unit 4 Cycle 24 as defined in Reference 4 and specified in Reference 1. FPL is unable to implement Turkey Point Unit 3 License Amendment No. 234 due to a vendor's inability to provide a sufficient number of Metamic inserts for the Unit 3 spent fuel pool. As indicated in Reference 3, FPL will submit a license amendment application to update the licensing bases of the Unit 3 spent fuel pool.

If you have any questions or require additional information, please contact Robert Tomonto at 305-246-7327.

Very truly yours, Michael Kiley Vice President Turkey Point Nuclear Plant cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant USNRC Project Manager for Turkey Point Mr. William Passetti, Florida Department of Health AJ/2 (