0 0 PL L-2009-268 FPL.
November 13, 2009 POWERING TODAY.
EMPOWERING TOMORROW.
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington D.C. 20555-0001 Re:
Turkey Point Unit 3 Docket No. 50-250 License Amendment No. 234 for Turkey Point Unit 3 Notice of Inability to Implement
References:
- 1. Letter from Michael Kiley (FPL) to USNRC, "Implementation Date Change for License Amendments 234 and 229," L-2009-200, September 1, 2009.
- 2.
Letter from B. L. Mozafari (USNRC) to J. A. Stall (FPL), "Turkey Point Plant Units 3 and 4 -
Issuance of Amendments Regarding Spent Fuel Boraflex Remedy (TAC No. MC9740 and MC974 1)," July 17, 2007.
- 3.
Letter from Michael Kiley (FPL) to USNRC, "Withdrawal of License Amendment Request No.
201 for Turkey Point Unit 3" L-2009-260, November 9, 2009.
- 4. Letter from Michael Kiley (FPL) to USNRC, "Issuance of Amendment Regarding Spent Fuel Pool Boraflex Remedy, Supplement 3 to Request for a Change in Implementation Date," L-2009-249, October 31, 2009.
Florida Power and Light Company (FPL) submitted an application for amendment of the Turkey Point Unit 3 and 4 licenses in Reference 1. The application concerned a revision to the implementation dates for the license amendments issued by the NRC staff in Reference 2. FPL withdrew the Reference 1 application for Unit 3 in Reference 3. The purpose of this letter is to inform the NRC that FPL will not be able to implement Amendment No. 234 to Renewed Facility Operating License No. DPR-31 for Turkey Point Unit 3 prior to the end of Turkey Point Unit 4 Cycle 24 as defined in Reference 4 and specified in Reference 1. FPL is unable to implement Turkey Point Unit 3 License Amendment No. 234 due to a vendor's inability to provide a sufficient number of Metamic inserts for the Unit 3 spent fuel pool. As indicated in Reference 3, FPL will submit a license amendment application to update the licensing bases of the Unit 3 spent fuel pool.
If you have any questions or require additional information, please contact Robert Tomonto at 305-246-7327.
Very truly yours, Michael Kiley Vice President Turkey Point Nuclear Plant cc:
Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant USNRC Project Manager for Turkey Point Mr. William Passetti, Florida Department of Health AJ/2 (
an FPL Group company