MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis L-2024-159, Core Operating Limits Report for Reload Cycle 242024-10-15015 October 2024 Core Operating Limits Report for Reload Cycle 24 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision 2024-09-09
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles ML24150A2192024-05-29029 May 2024 (E-Mail) St. Lucie, Unit 2 - License Amendment Request, Updated Spent Fuel Pool Criticality Analysis - Acceptance Review L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-038, To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24005A2772024-02-20020 February 2024 Issuance of Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-008, Supplement to License Amendment Request 278. Incorporate Advanced Fuel Products. Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2024-02-0909 February 2024 Supplement to License Amendment Request 278. Incorporate Advanced Fuel Products. Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23275A1142023-10-0202 October 2023 Improved Technical Specifications Conversion, Chapter 2.0, Safety Limits, Revision 1 - Volume 4 L-2023-126, Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal2023-10-0202 October 2023 Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal ML23275A1262023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 5.0, Administrative Controls, Revision 2 - Volume 16 ML23275A1252023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 4.0, Design Features, Revision 2 - Volume 15 ML23275A1242023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.9, Refueling Operations, Revision 2 - Volume 14 ML23275A1232023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.8, Electrical Systems, Revision 2 - Volume 13 ML23275A1222023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 - Volume 12 ML23275A1212023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.6, Containment Systems, Revision 2 - Volume 11 ML23275A1202023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.5, Emergency Core Cooling Systems, Revision 2 - Volume 10 ML23275A1192023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.4, Reactor Coolant System, Revision 2 - Volume 9 ML23275A1182023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.3, Instrumentation, Revision 2 - Volume 8 ML23275A1172023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.2, Power Distribution Limits, Revision 2 - Volume 7 ML23275A1162023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.1, Reactivity Control Systems, Revision 2 - Volume 6 ML23275A1152023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.0, LCO and SR Applicability, Revision 2 - Volume 5 ML23275A1122023-10-0202 October 2023 Improved Technical Specifications Conversion License Amendment Request Self-Identified Administrative Changes - Volume 2 ML23275A1112023-10-0202 October 2023 Improved Technical Specifications (ITS) Revision 2 Submittal Volumes 1 Through 16 ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-05-11011 May 2023 License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves ML23095A0072023-04-0404 April 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1431 Revision 5 L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-03-15015 March 2023 License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis L-2023-004, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results2023-01-17017 January 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results L-2022-176, License Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements2022-12-0909 December 2022 License Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements L-2022-175, Application to Adopt 10 CPR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-154, Subsequent License Renewal Application Revision 1, Supplement 42022-09-22022 September 2022 Subsequent License Renewal Application Revision 1, Supplement 4 L-2022-110, License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary)2022-08-26026 August 2022 License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) ML22243A1622022-08-26026 August 2022 Submittal of License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML22200A1082022-07-19019 July 2022 Acceptance Review for TSTF-577 Amendment L-2022-046, Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal2022-04-13013 April 2022 Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal L-2022-043, Subsequent License Renewal Application Revision 1 - Supplement 12022-04-0707 April 2022 Subsequent License Renewal Application Revision 1 - Supplement 1 ML22033A0802022-02-0202 February 2022 Supplement to License Amendment Request (TSCR-188): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition ML22010A0962022-01-0505 January 2022 Trp 010 St Lucie SLRA - Boricacidcorrbreakoutq - Makar 2024-09-27
[Table view] |
Text
I 0 Florida Power & Light Company, 700 Universe Boulevard, P.O. Box 14000, Juno Beach, FL 33408-0420 F=PL DEC 1 12006 U.S. Nuclear Regulatory Commission L-2006-256 Document Control Desk 10 CFR 20.1003 Washington, DC 20555-0001 RE: Florida Power and Light Company St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 FPL Energy Seabrook, LLC Seabrook Station Docket No. 50-443 FPL Energy Duane Arnold, LLC Duane Arnold Energy Center Docket No. 50-331 Application to Use Weighting Factors for External Exposure Pursuant to footnote 2 to the "Organ Dose Weighting Factors" table in 10 CFR Part 20.1003, Florida Power & Light Company (FPL), the licensee for the St. Lucie Nuclear Plant, Units 1 and 2, and the Turkey Point Nuclear Plant, Units 3 and 4, FPL Energy Seabrook, LLC (FPL Energy Seabrook), the licensee for Seabrook Station, and FPL Energy Duane Arnold, LLC, the licensee for Duane Arnold Energy Center, collectively FPL, hereby request Nuclear Regulatory Commission (NRC) approval to use weighting factors for calculating external whole body dose. The application is provided as an enclosure to this letter.
Specifically, FPL requests approval to apply the weighting factors specified in the consensus technical standard, American National Standards Institute, HPS N13.41-1997, "Criteria for Performing Multiple Dosimetry" to assign Total Effective Dose Equivalent from external sources of radiation.
As described in the application, approval would improve assessment of occupational dose to individuals from exposure to highly non-uniform radiation fields.
The technical basis for this application is the consensus technical standard approved by the American National Standards Institute - Accredited HPS N13 Committee. The an FPL Group company i§565 )
St. Lucie Units 1 and 2, Docket Nos. 50-335 and 50-389 Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251 Seabrook Station, Docket No. 50-443 Duane Arnold Energy Center, Docket No. 50-331 L-2006-256, Page 2 of 2 Standard is practical and consistent with the organ or tissue weighting factors in 10 CFR Part 20.1003.
By letter dated December 20, 2004, as supplemented by letter dated February 23, 2005, Southern California Edison (SCE) requested approval to use weighting factors for calculating external whole body dose as described above. By letter dated May 10, 2005 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML051320194), the NRC staff concluded that authorization of this request was acceptable, and within the provisions of Title 10 of the Code of Federal Regulations, Part 20.
Florida Power & Light Company would like to begin using weighting factors for external exposures during the April 2007, St. Lucie Unit 1 refueling outage. Therefore, FPL is requesting the subject authorization by March 1, 2007.
Should there be any questions, please contact Joe Danek at (561) 694-4213.
Sincerely yours, J.A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer
Enclosure:
Application to Use Weighting Factors for External Exposure cc: Regional Administrator, Region I w/enclosure Regional Administrator, Region II Regional Administrator, Region III of USNRC Project Manager, St. Lucie and Turkey Point Senior Resident Inspector, USNRC, St. Lucie Senior Resident Inspector, USNRC, Turkey Point If USNRC Project Manager, Seabrook Station it Senior Resident Inspector, USNRC, Seabrook Station USNRC Project Manager, Duane Arnold Energy Center Senior Resident Inspector, USNRC, Duane Arnold Energy Center
ENCLOSURE APPLICATION TO USE WEIGHTING FACTORS FOR EXTERNAL EXPOSURE
St. Lucie Units 1 and 2, Docket Nos. 50-335 and 50-389 Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251 Seabrook Station, Docket No. 50-443 Duane Arnold Energy Center, Docket No. 50-331 L-2006-256, Enclosure, Page 1 of 5 APPLICATION TO USE WEIGHTING FACTORS FOR EXTERNAL EXPOSURE 1.0 INT R O DUC T IO N ................................................................................................... 2 1.1 P UR P O S E ................................................................................................. . .2
1.2 REGULATORY EVALUATION
................................................................. 2 2.0 TECHNICA L JUSTIFICATIO N ........................................................................... 2 2.1 IMPROVED ASSESSMENT OF DOSE ...................................................... 2 2.2 COM PARTM ENT FACTORS ..................................................................... 3 2.3 C HEST C O MPA RTM ENT ........................................................................... 4 2.4 DOSIMETER SELECTION AND PLACEMENT .......................................... 4 2.5 D O S E A S S IG NMEN T ................................................................................. 4 2.6 ADDITIONAL CONSIDERATIONS .................................................... 4 2 .7 C O NC LU S IO N ........................................................................................... 5
St. Lucie Units 1 and 2, Docket Nos. 50-335 and 50-389 Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251 Seabrook Station, Docket No. 50-443 Duane Arnold Energy Center, Docket No. 50-331 L-2006-256, Enclosure, Page 2 of 5
1.0 INTRODUCTION
1.1 PURPOSE Pursuant to footnote 2 to the "Organ Dose Weighting Factors" table in 10 CFR Part 20.1003, FPL requests approval to use weighting factors for calculating external whole body dose.
Specifically, FPL requests approval to use weighting factors specified in American National Standards Institute technical standard HPS N13.41 (HPS N13.41-1997, "Criteria for Performing Multiple Dosimetry", approved December 1996) for assessing effective dose equivalent (EDE) based on direct measurement of external exposures using personnel dosimeters. The assigned EDE is the sum of each dosimeter measurement modified by its appropriate weighting factor.
1.2 REGULATORY EVALUATION
Dose limits in 10 CFR Part 20 are specified in the dose quantity total effective dose equivalent (TEDE). TEDE is defined in 20.1003 as the sum of the external dose quantity called deep dose equivalent (DDE) plus the internal dose quantity called committed effective dose equivalent.
Footnote 2, in the "Organ Dose Weighting Factors" table in 10 CFR 20.1003, permits the use of weighting factors for external exposure with prior NRC approval. FPL seeks NRC approval to use weighting factors to calculate the external exposure quantity EDE and to use EDE in place of DDE in the calculation of TEDE.
2.0 TECHNICAL JUSTIFICATION 2.1 IMPROVED ASSESSMENT OF DOSE In uniform radiation fields, the dosimeter used to measure whole body dose is worn on the chest. The dosimeter measures radiation exposure using an operational dose quantity called DDE.
When the radiation field is highly non-uniform, either the chest dosimeter is moved to the part of the whole body expected to receive the highest dose or additional dosimeters are worn so that the highest whole body dose can be measured.
Difficulties: arise because the annual occupational dose limit is based on the stochastic risk from whole body exposure, which is related to the dose quantity EDE. While the use of DDE as a surrogate quantity to approximate EDE works well in uniform radiation
St. Lucie Units 1 and 2, Docket Nos. 50-335 and 50-389 Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251 Seabrook Station, Docket No. 50-443 Duane Arnold Energy Center, Docket No. 50-331 L-2006-256, Enclosure, Page 3 of 5 fields, in highly non-uniform radiation fields, a more accurate estimate of EDE is needed to improve the assessment of occupational dose.
2.2 COMPARTMENT FACTORS HPS N13.41 provides a method for assessing EDE based on measurements of DDE at specific areas of the body called "compartments" and applying appropriate weighting factors called "compartment factors". A compartment factor "relates the fractional risk to the organs underlying the measurement location to the total risk from uniform irradiation of the whole body."
HPS N13.41, Appendix A describes how the 10 CFR Part 20 organ or tissue weighting factors are apportioned to each "compartment" based on the associated underlying organs and tissues. The resulting compartment factors used to calculate EDE are listed below:
HPS N13.41 COMPARTMENT FACTORS Compartment Name Compartment Factor Head and neck 0.10 Thorax, above the diaphragm 0.38 Abdomen, including the pelvis 0.50 Upper right arm 0.005 Upper left arm 0.005 Right thigh 0.005 Left thigh 0.005
St. Lucie Units 1 and 2, Docket Nos. 50-335 and 50-389 Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251 Seabrook Station, Docket No. 50-443 Duane Arnold Energy Center, Docket No. 50-331 L-2006-256, Enclosure, Page 4 of 5 2.3 CHEST COMPARTMENT Consistent with FPL's current practice, a single chest dosimeter will measure the dose to both the thorax and abdomen compartments. The combined compartments will be called the chest compartment.
2.4 DOSIMETER SELECTION AND PLACEMENT NRC Inspection Procedure 71121.01, "Access Control To Radiologically Significant Areas" issue date 03/06/02, Section 03.04(c) "Dosimeter selection and placement criteria," will be used to provide adequate criteria for monitoring the part of the body expected to receive the highest dose.
2.5 DOSE ASSIGNMENT The DDE for each compartment will be determined from dosimeters worn at that location. When no dosimeter is worn at a particular compartment, DDE will be determined from the dosimeter positioned where the exposure is judged to be similar.
The assigned EDE will be the sum of each DDE measurement multiplied by its appropriate compartment factor.
The assigned lens dose equivalent (LDE) will be the higher of the head or chest dosimeters. The assigned shallow dose equivalent (SDE) will be the highest of any whole body dosimeter.
2.6 ADDITIONAL CONSIDERATIONS The following provisions are included to address NRC Request for Additional Information associated with San Onofre's submittal; (1) FPL's application seeks approval to calculate the external dose quantity EDE using the compartments, compartment factors, and method of summation specified in HPS/ANSI N13.41. EDE will be used in place of DDE in the calculation of TEDE.
FPL's application does not seek approval to use the ANSI Standard's Section 4, "Criteria for When to Use Multiple Dosimeters" or Section 5.5 "Alternatives to the Use of Multiple Dosimeters".
(2) FPL will monitor the part of the whole body within each compartment (and/or composite compartment) that receives the highest dose. FPL will use the criteria in our current procedures addressing dosimeter selection and placement. These procedures use criteria consistent with guidance found in NRC Inspection Procedure 71121.01, issue date 03/06/02.
St. Lucie Units 1 and 2, Docket Nos. 50-335 and 50-389 Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251 Seabrook Station, Docket No. 50-443 Duane Arnold Energy Center, Docket No. 50-331 L-2006-256, Enclosure, Page 5 of 5 (3) The same National Voluntary Laboratory Accreditation Program (NVLAP) accredited dosimeters will be worn at the same whole body locations after the application is approved as they are today. Because we will continue to monitor the part of the body expected to receive the highest dose, the dosimeter orientation toward the source will not change. Therefore, there are no new challenges to the dosimeter's angular response characteristics resulting from approval of this application.
2.7 CONCLUSION
Accurate assessment of occupational dose from external sources of radiation in highly non-uniform radiation fields requires a method for assessing EDE. NRC approval of this application will improve the accuracy of licensee assessment of occupational dose.
FPL will assess EDE based on the consensus technical standard, HPS N1 3.41. This standard was approved by the American National Standards Institute - Accredited HPS N13 Committee on 20 June 1996. At the time of balloting, the HPS N13 Committee membership included representatives from the Nuclear Regulatory Commission and the National Council on Radiation Protection and Measurements.
The HPS N13.41 consensus technical standard has previously been approved for use by the NRC for evaluating occupational dose to medical personnel wearing lead aprons in Regulatory Issue Summary 2002-06, "Evaluation Occupational Dose for Individuals Exposed to NRC-Licensed Material and Medical X-Rays," dated April 16, 2002.
The proposed method will monitor the part of the whole body expected to receive the highest dose using the criteria for dosimeter selection and placement found in current NRC inspection procedures.