L-2005-030, Response to Request for Additional Information on SL2-15 Steam Generator Inspection Reports

From kanterella
Jump to navigation Jump to search

Response to Request for Additional Information on SL2-15 Steam Generator Inspection Reports
ML062490426
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/29/2006
From: Johnston G
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2005-030, L-2006-199
Download: ML062490426 (8)


Text

t 0

Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 August 29, 2006 FPL L-2006-199 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: St. Lucie Unit 2 Docket No. 50-389 Response to Request for Additional Information on SL2-15 Steam Generator Inspection Reports Via FPL letters L-2005-030 dated February 11, 2005, and L-2005-237 dated November 28, 2005, FPL submitted the St. Lucie Unit 2 Technical Specification Special Reports for the refueling outage SL2-15 steam generator tube inservice inspection results and steam generator tube plugging results. Subsequent interactions with the Staff resulted in a Request for Additional Information (RAI) via the NRC letter from Brendan T. Moroney to J. A. Stall dated June 16, 2006, titled "St. Lucie Unit 2 - Request for Additional Information 2005 Steam Generator Tube Inspections (TAC No. MC9192)."

This letter forwards the responses to the RAI.

Please contact Ken Frehafer at (772) 467-7748 if there are any questions about this submittal.

Very truly yours, GLJ/KWF Attachment

&4--7 an FPL Group company

St. Lucie Unit 2 L-2006-199 Docket No. 50-389 Attachment Response to Request for Additional Information on Page 1 of 7 SL2-15 Steam Generator Inspection Report

1. Duringthe 2005 steam generatortube inspections a number of indicationswere coded as retestfor clarification (RCL) because they were identified with a rotatingprobe as it was being removedfrom the tube at a rate greaterthan the rate at which the probe is qualified. The indicationsin question had not been identifiedduring bobbin coil inspection. The Nuclear Regulatory Commission staff discussed these indicationswith representativesfrom St. Lucie during conference calls at the time of the outage. Duringthe call the staffmade several observationsconcerning the disposition of these flaws (refer to pages 5 and 6 ofthe conference call summary dated, April 8, 2005 (ML50730197)). In light of these observations,summarize your basisfor the approach taken to dispositionthe RCLs duringyour 2005 inspections.

[The NRC staff's observations as summarized in their conference call summary dated, April 8, 2005 (ML50730197) are repeated below]

Observation a. - The RCL indicationswere attributedto probabilityof detection associatedwith the bobbin coil. Rather than comparing the outcome of the multicycle computer algorithm to the depth/voltage of the RCLs in making this determination,a more direct comparisonmay be to look at the bobbin voltage associatedwith the 2005 RCLs and compare it to the 2003 bobbin voltage associatedwith the 2005 confirmed DSIs. The distributionsshould be similar.Since the bobbin data is used to determine the growth rates (based on look-back analysis) such an analysis should be consistent with the growth rate methodology.

Reply to Observation a. - Comparison of voltages for 2005 RCL bobbin coil indications and 2003 bobbin coil associated with 2005 confirmed DSI indications are shown in the following 2 figures. Note that the bobbin coil voltages for the 2005 RCL indications fall to the left of the look back bobbin coil voltages (i.e., 2003 voltage) for the confirmed DSI indications identified in 2005. The smaller voltages for the RCLs supports the probability of detection used in the OPCON model for axial ODSCC eggcrate degradation.

St. Lucie Unit 2 L-2006-199 Docket No. 50-389 Attachment Response to Request for Additional Information on Page 2 of 7 SL2-15 Steam Generator Inspection Report PSL2 SGA Bobbin Coil Voltages 1.0 0.9 0.8 0.7 0.6 U.

0.5 0.4 0.3 0.2 0.1 0.0 0 0.5 1 1.5 2 2.5 P1 Voltage o 2003 P1 DSI .2005 P1 RCL PSL2 SGB Bobbin Coil Voltages 1.0 0.9 0.8 0.7 0.6 0 0.5 0.4 0.3 0.2 0.1 0.0 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 P1 Voltage a 2003 P1 DSI

  • 2005 P1 RCL

I St. Lucie Unit 2 L-2006-199 Docket No. 50-389 Attachment Response to Request for Additional Information on Page 3 of 7 SL2-15 Steam Generator Inspection Report Observation b. - Forprobabilisticanalysis, both the number of indicationsand the size of the indicationsare important. The number of RCLs/DSIs should also be consistent with your models.

If the number of RCLs is larger than expected (i.e., the undetectedpopulation is underpredicted),

additionalinspections may be needed in 2005 to ensure condition monitoring limits are met in 2005 andforjustifying afull cycle of operation.

Reply to Observation b. - A comparison between observed RCL's and OPCON model predictions for the 2005 outage is shown in the figure below. The depth distribution for RCL's predicted by OPCON agrees well with the data, particularly in the more critical upper region. The estimated number of RCL's predicted by the model is approximately 220. This is somewhat conservative by comparison with the 200 observed in the 2005 outage for SG-B. The 220 flaws predicted by the model are based on a limited inspection corresponding to the number of 2005 DSI pull-out scans.

COMPARISON OF OPCON RCL PREDICTIONS WITH DATA - SGB-RC L's 1.1 I- 0.9 k- 0.8 0.7 0.6 0.5 0 0.4 0.3 Ia. 0.2 - Model 0.1 SGB DATA[

0 0 10 20 30 40 50 60 70 80 DMAX - MAXIMUM %/oTW

St. Lucie Unit 2 L-2006-199 Docket No. 50-389 Attachment Response to Request for Additional Information on Page 4 of 7 SL2-15 Steam Generator Inspection Report Observation c. - A few of the indicationsare greaterthan 2-inches in length. It would be useful to assess how many, ifany, of the indicationsare growing outside the eggcratesupport.

Reply to Observation c. - A review of detailed profile sizing results for the end of cycle 15 inspection shows approximately eight indications with a length greater than 2.0 inches. The longest profile length in SG A and B was sized at 2.17 and 2.07 inches respectively. The length sizing for rotating probe examinations, however, is considered to be slightly conservative due to the eddy current field extension around the test coil. In any event, no credit is taken for the presence of the eggcrate support in the tube integrity assessment work. Therefore, there is no impact from considering the potential for some indications to extend slightly beyond the support. Further, freespan cracking has not been widely observed at St. Lucie Unit 2.

Observation d. - It would be useful to evaluate all chemical excursionsfor the prioroperating cycle to ascertainwhether this could have resulted in the increasedamounts (number and severity) of indications.

Reply to Observation d. - FPL has evaluated plant response to chemical excursions in the recent past to determine if improvements in the chemistry program are appropriate. The results of these evaluations have shown that the St. Lucie Unit 2 chemistry program has performed well with respect to maintaining impurity levels low and responding to excursions to protect SG health. The St. Lucie Unit 2 chemistry program implements the EPRI water chemistry guidelines, including all action level and shutdown requirements associated with impurity level increases. The St. Lucie Unit 2 SGs are scheduled for replacement after the next cycle of operation.

St. Lucie Unit 2 L-2006-199 Docket No. 50-389 Attachment Response to Request for Additional Information on Page 5 of 7 SL2-15 Steam Generator Inspection Report Observation e. - To confirm the adequacy of the screening criteriafor determining when RCLs should be inspected with a qualifiedtechnique, it would be useful to look at the burstpressures associatedwith the RCLs to see if they support the 0.35 volt screening criteria (i.e., do any of the lower voltage RCLs have low burst pressures).

Reply to Observation e. - Computed burst pressures for lower voltage RCL's are shown in the following figure. It can be clearly seen from the figure that RCL's with voltages less than 0.35 volts do not challenge the structural limit.

BURST PRESSURES (95/50) FOR LOW VOLTAGE RCL FLAWS 9000 8500 8000 7500 wn 7000 6500 0, 6000 5500 5000 4500 I- 4000 3500 3000 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 RCL VOLTS

St. Lucie Unit 2 L-2006-199 Docket No. 50-389 Attachment Response to Request for Additional Information on Page 6 of 7 SL2-15 Steam Generator Inspection Report Observationf - If the RCLs are a result of the probability of bobbin coil detection, then it should be confirmed that the distribution of RCL indicationsat various tube support elevations are consistent with the distributionof DSIs.

Reply to Observation f. - The frequency of occurrence of DSI and RCL per elevation are shown in the following figure. Note that the distributions are quite similar, reinforcing the impact of the Probability of Detection function.

Comparison of Observations of DSI and RCL 0.45 0.40 0.35

  • " 0.30 0.25 0

0.20 0 0.15 S0.10 0.05 0.00 1 2 3 4 5 6 7 8 Elevation n SGA DSl n SGA RCL EiSGB DSI o SGB RCL

2. A freespan axial indicationwas identified in the square bend region of steam generatorB (R44C130). Hasfreespan crackingbeen identifiedin areas other than the square bend? If so, discuss the locations of the indications and the number of tubes affected.

Reply to RAI #2 - One additional tube (SG A, R45 C65) was identified by the bobbin probe during end of cycle 13 inspections (4/03) with a freespan crack approximately 4" above the first hot leg support. Rotating probe inspection characterized the indication at 0.49" in axial length, 0.23 volts and a maximum depth of 31% through-wall, which is well below the screening threshold for in situ pressure testing. Additional analysis determined that the indication faced toward an adjacent carbon steel tie rod. This condition is indicative of a crevice condition that can result in concentration of contaminants. A full length inspection of the hot leg straight section of this tube was completed with the rotating probe and no additional indications were detected. Further, no other tubes located adjacent to tie rods contained any similar indications.

St. Lucie Unit 2 L-2006-199 Docket No. 50-389 Attachment Response to Request for Additional Information on Page 7 of 7 SL2-15 Steam Generator Inspection Report

3. Pleasediscuss whether any crack-like indicationswere identified in the u-bend region of the low row tubes. Ifso, discuss the location and orientationof the indicationsand the basisfor not expanding the scope of the inspection.

Reply to RAI #3 - There have been no crack-like indications reported in the u-bend region of the low row tubes.

4. Please discuss whether any crack-like indicationswere identifiedin dents or dings? Ifso, discuss the size, location, andorientation of the flaw and the voltage amplitude of the dent/ding.

Reply to RAI #4 - One crack-like indication was identified in a ding in the January 2005 inspection. The ding was 0.89 inches above the hot leg tubesheet in a periphery tube (SG 2B R137 C67) and was 5.01 volts in amplitude. A single axial indication (SAI) was present in the ding and was 0.21 inches in length and 0.68 volts in amplitude. The depth of the indication was not quantifiable due to the influence from the ding. This indication was in situ pressure tested to 4950 psi and passed without leakage or burst. This tube was plugged after in situ testing.

5. It is the staff's understandingthat axialcracks have been identified in wearscars at St. Lucie 2. Pleasediscuss whether there are any trends associatedwith the development of these cracks. Forexample, are the cracks more prevalent in the hot-leg or cold-leg side of the steam generator? Are the cracks associatedwith deeper wear scars?

Reply to RAI #5 - No axial cracks have been identified in wear scars (i.e., coincident with) at St. Lucie 2.

6. Pleasediscuss whether any crack-like indicationswere identified on the cold-leg side of the steam generatorother than those identified at the eggcrate support and the diagonalstrap.

Reply to RAI #6 - No crack-like indications have been identified on the cold-leg side of the steam generator other than those identified at the eggcrate support and the diagonal strap.