L-2004-151, Regulatory Issue Summary 2004-10 Preparation & Scheduling of Operator Licensing Examinations

From kanterella
(Redirected from L-2004-151)
Jump to navigation Jump to search
Regulatory Issue Summary 2004-10 Preparation & Scheduling of Operator Licensing Examinations
ML041970646
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 07/14/2004
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2004-151
Download: ML041970646 (2)


Text

Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 0 July 14, 2004 FPL L-2004-151 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Regulatory Issue Summary 2004-10 Preparation & Scheduling of Operator Licensing Examinations On June 14, 2004, NRC issued Regulatory Issue Summary (RIS) 2004-10, Preparation and Scheduling of OperatorLicensing Examinations. RIS 2004-10 requested licensees to submit, on a voluntary basis, information pertaining to their proposed site-specific operator licensing examination schedule and the estimated number of applicants planning to take those examinations as well as the NRC generic fundamentals examinations (GFE). The NRC stated that this information would help the NRC plan the use of its resources. A response was requested within 30 days of receipt of RIS 2004-10.

Attached please find the completed NRC Form 536, Operator Licensing Examination Data, for St. Lucie Units I and 2.

Please contact us if there are any questions regarding this submittal.

William Jef~fsi Vice President St. Lucie Plant WJ/spt Attachment an FPL Group company KACA6

I .

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 071311005 (5-200) Estimated burden per response to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection Is used lo plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Record Management Branch (T-6 E5). U.S. Nucler Regulatory OPERATOR LICENSING Commission. Washington, DC 20555-0001, or by Internet a-mail to EXAMINATION DATA Infocoli Rgltryctsenrc.gov, and to the (3150-0131).

AfarNEO8-110202, Desk Officer,Office OfficeofofManagement Information and and Buge, Washingbn, DC 20503. If a means used to Impose an Information collecion does not display a wrrentiy valid OMB control number, to NRC may not conduct or sponsor, and a person Is not required to respond to, the informiation collection.

FACiITY 14RCREGION St. Lucie Plant 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 05 cl 06 cy 07 Cy 08 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXCAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 05 CY 06 Cy 07 Cy 08 NUMBER OF REACTOR OPERATORS 0 0 10 0 NUMBER OF SENIOR REACTOR OPERATORS - NSTANT 12 0 5 0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 0 7 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/31/05 NA 11/2007 NA ALTERNATE DATE 11/30/05 NA 12/2007 NA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED Cy 05 Cv 06 NUMBER MARCH JUNE SEPTEMBE DECEMBER MARCH JUNE SEPTEMBEj DECEMBER ESTIMAE CANDIDATES[ 0 0 0 15 0 0 0 0 CNRCDIDATE-20)PiNE N EYLE AE NRC FORM MI 5362Ac PRINTED ON RECYCLED PAPER