Category:Emergency Preparedness-Emergency Plan Exercise Objectives and Scenario
[Table view] Category:Letter type:L
MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-040, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-03-28028 March 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-013, Submittal of Periodic Reports2024-03-28028 March 2024 Submittal of Periodic Reports L-2024-044, Revised Steam Generator Tube Inspection Reports2024-03-19019 March 2024 Revised Steam Generator Tube Inspection Reports L-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-014, 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 2023 Annual Radioactive Effluent Release Report L-2024-025, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-02-22022 February 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-008, Supplement to License Amendment Request 278. Incorporate Advanced Fuel Products. Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2024-02-0909 February 2024 Supplement to License Amendment Request 278. Incorporate Advanced Fuel Products. Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-007, Inservice Inspection Program Owners Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owners Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-115, Inservice Inspection Program Owners Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owners Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, And Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 And Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update 2024-09-25
[Table view] |
Text
i:::L Nov 21 2002 L-2002-231 10 CFR 50 Appendix E U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Emergency Exercise - February 2003 This letter forwards Florida Power & Light Company's scope and objectives for the 2003 Turkey Point annual emergency preparedness exercise. The objectives were developed in conjunction with state and local governments. The exercise is scheduled for February 19, 2003, and will involve participation by local emergency response agencies and state emergency response personnel.
If there are any questions or comments concerning the attached information, please contact Mr.
Milt Murray at (305) 246-6496.
Very truly yours, ohn P. Mc a Vice President Turkey Point Plant OIH Attachments cc: Regional Administrator, Region 11, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Chief, Operator Licensing and Human Performance Branch, Region 1I, USNRC an FPL Group company
L-2002-231 Attachment 1 Page 1 of 1 SCOPE To assure that the health and safety of the general public is protected in the event of an accident at Turkey Point Nuclear Plant, Florida Power & Light Company (FPL) conducts biennial emergency preparedness exercises. This is the 2003 Evaluated Exercise at the Turkey Point Nuclear Plant. This exercise involves mobilization, or simulated mobilization of FPL, Nuclear Regulatory Commission, State of Florida, Miami Dade County and Monroe County personnel and resources to respond to a simulated accident scenario. A Controller organization will control, observe, evaluate and critique the exercise to assess the emergency response capabilities of the utility and government agencies. A FPL Controller Organization will control, observe, evaluate, and critique the PTN portion of the exercise. The Nuclear Regulatory Commission will evaluate the FPL Emergency Response Organization (ERO) and Controller Organization. The State of Florida, Miami-Dade County, and Monroe County emergency response organizations will be evaluated by their own organizations and FEMA, as applicable.
Due to the compressed timeline of the exercise, minimal Juno Beach FPL ERO personnel may be pre positioned. All onsite Emergency Response Facilities will be activated in accordance with simulated conditions and appropriate emergency response procedures for the exercise. Exercise participants ("players")
will not have any prior knowledge of the simulated accident events, operational sequence, radiological effluents, or weather conditions.
The exercise incorporates the following sub-drills:
Radiological Monitoring Drill - both onsite and offsite teams will be dispatched during the exercise to obtain required air samples and measurements associated with a simulated offsite release of radioactivity, and communicate these results to the appropriate Emergency Response Facility. (Field monitoring teams protective clothing and respiratory protection will be simulated.)
Health Physics Drill - involves the response to, and analysis of, simulated elevated airborne activity or liquid samples; radiation exposure control; emergency dosimetry, and the use of protective equipment onsite.
Communications Drill - actual use of emergency response communications links and equipment to demonstrate their integrity.
Medical Drill - involves a simulated contaminated individual.
Fire Drill - involves the response to a simulated fire.
The preceding sub-drills are incorporated into the exercise scenario and will be demonstrated concurrently in the course of the exercise. The overall intent of the exercise is to demonstrate that the FPL ERO is adequately trained to perform in accordance with the Emergency Plan and its implementing procedures.
Additionally, the scenario assists the Nuclear Regulatory Commission, State and local government agencies in demonstrating that they are adequately trained to perform in accordance with their emergency plans and procedures.
L-2002-231 Attachment 2 Page 1 of 5 OBJECTIVES The Turkey Point Nuclear Plant (PTN) emergency preparedness exercise objectives are based upon Nuclear Regulatory Commission requirements provided in 10 CFR 50: a) 50.47, Emergency Plans;b)
Appendix E, Emergency Planningand Preparednessfor Productionand Utilization Facilities;and NRC Inspection Manual, Inspection Procedure 82302, Review of Exercise Objectives and Scenariosfor Power Reactors. Additional guidance provided in NUREG-0654, FEMA-REP-1, Revision 1, Criteriafor Preparationand Evaluationof RadiologicalEmergency Response Plans and Preparednessin Support of Nuclear Power Plants,was utilized in developing the objectives. The exercise will be conducted and evaluated using a realistic basis for activities.
The following objectives are consistent with the referenced planning documents:
A. Exercise Planning
- 1. Conduct an exercise of the PTN Emergency Plan.
- 2. Provide an opportunity for the State of Florida, Miami-Dade and Monroe Counties to participate in an exercise.
- 3. Prepare an exercise information package to include:
- a. The objectives of the exercise and appropriate evaluation criteria.
- b. The date, time period, place, and a list of participating organizations.
- c. The simulated sequence of events.
- d. The narrative summary.
- 4. Conduct a critique of the exercise and prepare an evaluation report.
- 5. Demonstrate that corrective actions are tracked until completion.
L-2002-231 Attachment 2 Page 2 of 5 B. Emergency Organizations, Support, and Resource
- 1. Demonstrate the prompt activation, adequacy of the staffing and set up, as appropriate, of emergency response facilities, as follows:
- Control Room
- Technical Support Center (TSC)
- Operations Support Center (OSC)
- Emergency Operations Facility (EOF)
- Emergency News Center (ENC)
- 2. Demonstrate the capability of the FPL Emergency Response Organization to implement their Emergency Plan Implementing Procedures.
- 3. Demonstrate the ability of the Emergency Response Facility Managers and Supervisors to provide overall direction, including "command and control" by initiating, coordinating, and implementing timely and effective decisions during a radiological emergency.
- 4. Demonstrate the ability to effectively transfer command and control of emergency response functions from the Control Room to the TSC/EOF.
- 5. Demonstrate the provisions for continuous staffing of the emergency facilities.
- 6. Demonstrate the interface capability between the FPL Emergency Response Organization and the State of Florida and Miami-Dade and Monroe Counties for effective response coordination to a radiological emergency and adequate protection of the health and safety of the public.
- 7. Demonstrate the ability to control access to emergency facilities.
- 8. Demonstrate the ability to provide a liaison at each participating offsite governmental emergency operations center (EOC).
- 9. Demonstrate adequacy of designated facilities and equipment to support emergency operations.
- 10. Demonstrate, as necessary, the availability of outside support agencies and organizations that may be requested to provide assistance in an emergency.
- 11. Demonstrate, as appropriate, the ability to identify the need for, notify, and request assistance from Federal Agencies.
L-2002-231 Attachment 2 Page 3 of 5 C. Accident Assessment and Classification
- 1. Demonstrate the availability of methods, equipment, and expertise to make rapid assessments of the consequences of any radiological hazards, including the dispatch and coordination of Field Monitoring Teams.
- 2. Demonstrate the ability to recognize emergency action levels (EALs) and properly classify emergencies in accordance with the Turkey Point Emergency Plan Implementing Procedures.
D. Notification and Communication
- 1. Demonstrate the ability to notify the State Warning Point within approximately fifteen minutes of each emergency classification.
- 2. Demonstrate the ability to notify the NRC of any emergency classification within approximately one-hour of the declaration.
- 3. Demonstrate the ability to notify FPL Emergency Response Organization personnel.
- 4. Demonstrate the ability to develop and send timely information to State and local authorities, as required by the Emergency Plan.
- 5. Demonstrate the ability to communicate among the Control Room, TSC, OSC, EOF, and ENC, as appropriate.
- 6. Demonstrate that adequate communication capabilities exist between FPL, and the State and local Emergency Operations Centers (EOCs).
- 7. Demonstrate the adequacy of communications capabilities between the Emergency Response facilities and the offsite radiation monitoring teams.
- 8. Demonstrate the ability to communicate among the Control Room, TSC, EOF, and NRC Operations Center.
E. Radiological Consequence Assessment
- 1. Demonstrate methods and techniques for determining the source term of releases or potential releases of radioactive material.
- 2. Demonstrate the adequacy of methods and techniques for determining the magnitude of the releases of radioactive materials based on plant system parameters and effluent monitors.
L-2002-231 Attachment 2 Page 4 of 5
- 3. Demonstrate the ability to estimate integrated dose from projected or actual dose rates and to formulate Protective Action Recommendations (PARs).
- 4. Demonstrate the ability to monitor and control emergency worker radiation exposure and implement exposure guidelines, as appropriate.
- 5. Demonstrate the availability of respiratory protection, and protective clothing for onsite emergency response personnel.
- 6. Demonstrate the availability of a procedural mechanism to expeditiously evaluate risks and authorize emergency workers to receive doses in excess of 10 CFR 20 limits, as appropriate.
- 7. Demonstrate the capability for onsite contamination control.
- 8. Demonstrate the ability to decontaminate onsite personnel, as appropriate.
- 9. Demonstrate the capability to prepare a contaminated injured person for offsite transport.
- 10. Demonstrate the capability for onsite and offsite radiological monitoring, to include collection, and analysis of sample media (e.g., air) and provisions for communications and record keeping.
- 11. Demonstrate the capability to collect and prepare for shipment simulated elevated airborne or liquid samples, as required.
F. Protective Action
- 1. Demonstrate the ability to recommend protective actions to appropriate offsite authorities.
- 2. Demonstrate the ability to advise individuals, onsite or in owner controlled areas, of emergency conditions.
- 3. Demonstrate the ability to conduct search and rescue procedures for persons identified as missing during accountability procedures.
G. Public Information
- 1. Demonstrate the operations of the ENC and the availability of space for the media.
L-2002-231 Attachment 2 Page 5 of 5 H. Exemptions Areas of the PTN Emergency Plan that will NOT be demonstrated during this exercise include:
- 1. Site evacuation and relocation of non-essential personnel will not be demonstrated.
- 2. Real time activation of the EOF by Juno Beach responders, or State and County participants will not be demonstrated.
- 3. Onsite personnel accountability will not be demonstrated. Security will demonstrate accountability through the use of simulated personnel rosters.