FENOC Beaver Valley Power Station P. 0. Box 4 Shippingport, PA 15077 L-03-077 May 6, 2003 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, Li6enseNo. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of April, 2003.

Respectfully,

-L.-W.-Pearce Vice-President BVPS DTJ/cmg Enclosures cc: NRC RegionalOffiee  ; * .:' - W

`- KingofPrussia,PA."` - - -;-- < - .

UNI; SH  : NI S I.  ; * ';!. ~ , .

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE May 1, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: April 2003 Date Type Duration Reason Method of Cause / Corrective Actions No. (Y/M/D) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments 2 030401 S 693.7 C 4 The Unit was shutdown for its planned 15 refueling outage on 3/8/03. The oiginally planned 37 day refueling outage was extended approximately 16 days in order to allow for

._____ _____ repair of minor surface cracks on four of 65

_control-rod rive-mechanism-nozzles-found during inspection of the reactor vessel head and nozzles, and to investigate a rub near the high pressure main unit turbine coupling found during startup of the turbine. The Unit completed its 15th refueling outage on 4/29/03.

(1)Reason (2)Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Tnp / Scram C - Refueling 3 - Automatic Trp / Scram D- Regulatory Restriction 4-Continuation E - Operator Training I License Examination 5 - Other (Explain)

F - Administrative G- Operatonal Error (Explain)

H- Other (Explain)

SUMMARY

The Unit began the report period shut down in Mode 6 during its planned 15 th refueling outage.

The originally planned 37 day refueling outage was extended in order to allow for repair of minor surface cracks on four of 65 control rod drive mechanism. nozzles found during inspection of the reactor-vessel head and nozzles. -Following the-aboVe-repairs,-Mode-5-was entered at 0725 hour§ on'417/03. The Unit began to heat up entering Mode 4 at 0619 hours0.00716 days <br />0.172 hours <br />0.00102 weeks <br />2.355295e-4 months <br /> on 4/24/03. Mode 3 was entered at 0825 hours0.00955 days <br />0.229 hours <br />0.00136 weeks <br />3.139125e-4 months <br /> on 4/25/03. Mode 2 was entered at 1340 hours0.0155 days <br />0.372 hours <br />0.00222 weeks <br />5.0987e-4 months <br /> and the reactor was taken critical at 1433 hours0.0166 days <br />0.398 hours <br />0.00237 weeks <br />5.452565e-4 months <br /> on 4/27/03. At 0213 hours0.00247 days <br />0.0592 hours <br />3.521825e-4 weeks <br />8.10465e-5 months <br /> on 4/28/03, the Unit was retumed to Mode 3 in order to investigate a rub near the high-pressure main unit turbine coupling found during startup of the turbine. Following resolution of this investigation, the Unit was returned to Mode 2 at 1205 hours0.0139 days <br />0.335 hours <br />0.00199 weeks <br />4.585025e-4 months <br /> on 4/29/03. The reactor was taken critical at 1243 hours0.0144 days <br />0.345 hours <br />0.00206 weeks <br />4.729615e-4 months <br /> with Mode 1 entered at 1343 hours0.0155 days <br />0.373 hours <br />0.00222 weeks <br />5.110115e-4 months <br /> on 4/29/03. The Unit was synchronized to the electrical grid at 2240 hours0.0259 days <br />0.622 hours <br />0.0037 weeks <br />8.5232e-4 months <br /> on 4/29/03 officially ending the 15 th refueling outage. Output was then escalated to approximately 29% for fuel preconditioning and to obtain core power distribution data for startup testing. The Unit remained at approximately 29% output through the remainder of the report period.

OPERATING DATA REPORT DOCKET NO.: 50-334 UNIT NAME: BVPS UNIT #1 REPORT DATE: 05/01/03 COMPLETED BY: DAVID T. JONES

. TELEPHONE: (724) 682-4962 la. REPORTING PERIOD: APRIL 2003

  • Notes: Rated thermal power at *
  • BVPS-1 was uprated from 2652 MWt*
1. _ DESIGN ELECTRICAL RATING_(Net MWe): _ 835
  • to 2689 MWt on 10/20/01. Net *

- - - - -*MDC as also-uprated-from -

2. MAX. DEPENDABLE CAPACITY (Net MWe): 821
  • 810 KWe to 821 MWe. *
  • * * * * * * *
  • s* * * * * * * *
  • THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 719.0 2879.0 236663.0
3. NO. OF HRS. REACTOR WAS CRITICAL: 47.0 1578.5 162170.0
4. SERVICE HOURS GENERATOR ON LINE: 25.3 1550.5 159662.5
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (WH): 0.0 1182118.0 119838125.0
7. GROSS ELECT. ENERGY GEN. (WH): 4238.0 1262656.0 127932246.0
8. GROSS THERMAL ENERGY GEN. (MWH): 22364.0 3836373.0 394107682.5
9. UNIT AVAILABILITY FACTOR (): 3.5 53.9 68.9
10. UNIT CAPACITY FACTOR (MDC) (): 0.0 50.0 64.3
11. UNIT FORCED OUTAGE RATE (%): 0.0 3.7 15.6

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE Mavl1,2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: AprIl2003 No. Date Type Duration Reason Method of Cause I Corrective Actions (Y/M/D) F: Forced (Hours) (1) Shutting

____ 5~~:

Scheduled _____Down (2) Comments NONE.

(1) Reason (2)Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip IScram C - Refueling 3 -Automaic Trip /Scram D - Regulatory Restriction 4 -Continuaion E - Operator Training I License Examination 5 -Other (Explain)

F -Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

I OPERATING DATA REPORT DOCKET NO.: 50-412 UNIT NAME: BVPS UNIT #2 REPORT DATE: 05/01/03 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962

  • Notes: Rated thermal power at
  • la. REPORTING PERIOD: APRIL 2003
  • BVPS-2 was uprated from 2652 MWt*

. ._ DESIGN ELECTRICAL.RATING (Net MWe):_ 836

  • to 2689 Mwt on 10/30/01. Net *
  • MDC was-also"uprated from *
2. MAX. DEPENDABLE CAPACITY (Net MWe): 831
  • 820 MWe to 831 Me.
  • THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 719.0 2879.0 135446.0
3. NO. OF ERS. REACTOR WAS CRITICAL: 719.0 2879.0 112434.1
4. SERVICE HOURS GENERATOR ON LINE: 719.0 2879.0 111705.5
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (WH): 606685.0 2433365.0 87615768.0
7. GROSS ELECT. ENERGY GEN. (MWH): 638007.0 2557330.0 92589375.0
8. GROSS THERMAL ENERGY GEN. (MWH): 1930985.0 7730716.0 282330327.0
9. UNIT AVAILABILITY FACTOR (): 100.0 100.0 82.5
10. UNIT CAPACITY FACTOR (MDC) (%): 101.5 101.7 77.8
11. UNIT FORCED OUTAGE RATE (): 0.0 0.0 9.5