L-02-030, Request for Extension of Time to Submit an Answer and Request a Hearing

From kanterella
(Redirected from L-02-030)
Jump to navigation Jump to search
Request for Extension of Time to Submit an Answer and Request a Hearing
ML020810021
Person / Time
Site: Beaver Valley
Issue date: 03/15/2002
From: Myers L
FirstEnergy Nuclear Operating Co
To: Collins S
Office of Nuclear Reactor Regulation
References
L-02-030
Download: ML020810021 (2)


Text

FENOC Beaver Valley Power Station Route 168 RO. Box 4 FirstEnergy Nuclear Operating Company Shippingport, PA 15077-0004 Lew W. Myers 724-682-5234 Senior Vice President Fax: 724-643-8069 March 15, 2002 L-02-030 Mr. Samuel J. Collins Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. I and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Request for Extension of Time to Submit an Answer and Request a Hearing

Dear Mr. Collins:

Section IV of the NRC's February 25, 2002, Order Modifying Licensee ("Order") states that, in accordance with 10 CFR 2.202, a Licensee must submit an answer to the Order and may request an extension of time in which to submit an answer or to request a hearing on the Order within 20 days of the date of the Order. In addition, the Order states "[w]here good cause is shown, consideration will be given to extending the time to request a hearing."

For the following reasons, FirstEnergy Nuclear Operating Company (FENOC) hereby requests an extension of time until June 6, 2002 to supplement the Beaver Valley Power Station (BVPS) answer to the Order being submitted by March 18, 2002, and an equal extension of time in which to request a hearing.

As required by the Order, BVPS is submitting a response under separate cover that identifies specific actions to be taken to comply with the applicable requirements and provides a schedule for implementation. As detailed in our answer to the Order, we are unable to complete the necessary evaluations to determine what actions are appropriate and what an appropriate schedule for implementation would be for Interim Compensatory Measure B.2.a. within the required response time.

hi'

Beaver Valley Power Station, Unit No. 1 and No. 2 Request for Extension of Time to Submit an Answer and Request a Hearing L-02-030 Page 2 Because of the unique nature of the situation that precipitated issuance of the Order, pursuant to Section IV of the Order, BVPS requests an extension of time until June 6, 2002 to file an answer for Interim Compensatory Measure B.2.a. BVPS also requests that an equal extension of time be granted to file a request for hearing, if necessary, for this answer.

Sincerely, Lew s

c:

Mr. D. S. Collins, Project Manager Mr. D. M. Kern, Sr. Resident Inspector Mr. H. J. Miller, NRC Region I Administrator Mr. Glenn Tracey, Chief, Reactor Safeguards Document Control Desk