L-02-011, Transmittal of Joseph M. Farley Nuclear Plant Version 16 of Fnp Security Plan. Without Enclosures

From kanterella
Jump to navigation Jump to search
Transmittal of Joseph M. Farley Nuclear Plant Version 16 of Fnp Security Plan. Without Enclosures
ML021500515
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/28/2002
From: Dennis Morey
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NEL-02-0119
Download: ML021500515 (2)


Text

Dave Morey Southern Nuclear SAFEGUARDS INFORMATION Vice President Operating Company, Inc. (THIS PAGE IS DECONTROLLED IF Farley Project Post Office Box 1295 Birmingham, Alabama 35201 DETACHED FROM SGI PAGES IN ATTACHMENT 1)

Tel 205.992.5131 SOUTHERNXa May 28, 2002 COMPANY Energy to Serve Your World"'

Docket Nos.: 50-348 NEL-02-0119 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Version 16 of the FNP Security Plan Ladies and Gentlemen:

In accordance with 10 CFR 50.54(p), Southern Nuclear Operating Company (SNC) hereby submits version 16 of the FNP Security Plan, FNP-0-M-99. SNC has reviewed the changes made for version 16 and has determined that this version does not decrease the safeguards effectiveness of the FNP Security Plan. In accordance with 10 CFR 50.4(b)(4), the signed original and three copies of the FNP Security Plan are being sent to the Document Control Desk, and two copies are being sent to the Region II office.

Attachment 1 provides a summary of the version 16 changes and the amended pages, while Attachment 2 provides the page removal and insertion instructions. Attachment 1 contains safeguards information and should be withheld from public disclosure in accordance with 10 CFR 73.21. Attachment 2 does not contain safeguards information.

This letter contains no NRC commitments. If you have any questions, please advise.

Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY Dave Morey DWD/sdl: secplan verl 6.doc Attachments:

Attachment 1 - FNP Security Plan Version 16, Change Summary and Amended Pages (NOTE: ContainsSafeguardsInformation)

Attachment 2 - Page Removal and Insertion Instructions for Attachment 1 SAFEGUARDS INFORMATION (THIS PAGE IS DECONTROLLED IF DETACHED FROM SGI PAGES IN ATTACHMENT 1)

SiA.

,/q

SAFEGUARDS INFORMATION (THIS PAGE IS DECONTROLLED IF DETACHED FROM SGI PAGES IN ATTACHMENT 1)

Page 2 U. S. Nuclear Regulatory Commission cc: Southern Nuclear Operating Company Mr. D. E. Grissette, General Manager - Farley (letter only)

U. S. Nuclear Regulatory Commission, Washington, DC Mr. F. Rinaldi, Licensing Project Manager - Farley (letter only)

Document Control Desk (original and 3 copies) (NOTE: ContainsSafeguards Information)

U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator (2 copies) (NOTE: ContainsSafeguards Information)

Mr. T. P. Johnson, Senior Resident Inspector - Farley (letter only)

SAFEGUARDS INFORMATION (THIS PAGE IS DECONTROLLED IF DETACHED FROM SGI PAGES IN ATTACHMENT 1)