L-02-000, December 2001 Monthly Operating Report for Joseph M. Farley, Units 1 and 2
| ML020440474 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 01/14/2002 |
| From: | Dennis Morey Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NEL-02-0005 | |
| Download: ML020440474 (6) | |
Text
Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 January 14, 2002 Docket Nos.:
50-348 50-364 SOUTHERN COMPANY Energy to Serve Your World" NEL-02-0005 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
Enclosed are the December 2001 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 5.6.4 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted, Dave Morey RWC:mor
Enclosures:
- 1. December Monthly Operating Report for Plant Farley Unit 1
- 2. December Monthly Operating Report for Plant Farley Unit 2 1
W /L[
Dave Morey Vice President Farley Project
Page 2 U. S. Nuclear Regulatory Commission cc:
Southern Nuclear Operating Company Mr. L. M. Stinson, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.
Mr. F. Rinaldi, Licensing Project Manager - Farley U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley
OPERATING DATA REPORT DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - Unit I DATE:
January 7, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 RATING STATUS Reporting Period:
DECEMBER 2001 Design Electrical Rating (Net MWe):
854 Maximum Dependable Capacity (Net MWe):
833 This Month Year to Date Cumulative Number Of Hours Reactor Was Critical:
Hours Generator On-line:
Unit Reserve Shutdown Hours:
Net Electrical Energy Generated (MWH):
744.0 710.5 0.0 587,206.0 7,808.2 172,245.9 7,737.0 169,968.2 0.0 0.0 6,392,529.0 134,352,946.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.
Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
El-i
UNIT SHUTDOWNS REPORTING PERIOD: DECEMBER 2001 DOCKET NO.:
50-348 UNIT NAME: J. M. Farley - Unit I DATE:
January 7, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns during the month.
(1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT At 0000 on 011201 the unit was at 64% power and in the process of ramping down to take the unit off line for a turbine balance move. The ramp down was completed and the unit was taken off line at 1245 on 011201. The balance move was completed and the generator was connected to the grid at 2218 on 011202. The unit was ramped up and achieved 100% power at 1246 on 011203.
E1-2
OPERATING DATA REPORT DOCKET NO.:
50-364 UNIT NAME:
J. M. Farley - Unit 2 DATE:
January 7, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 RATING STATUS Reporting Period:
Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Net MWe):
DECEMBER 2001 855 842 This Month Number Of Hours Reactor Was Critical:
Hours Generator On-line:
Unit Reserve Shutdown Hours:
Net Electrical Energy Generated (MWH):
744.0 744.0 0.0 637,634.0 Year to Date Cumulative 6,976.1 155,485.6 6,921.8 153,545.8 0.0 0.0 5,766,993.0 122,582,079.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.
Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
E2-1
UNIT SHUTDOWNS REPORTING PERIOD: DECEMBER 2001 DOCKET NO.:
50-364 UNIT NAME: J. M. Farley - Unit 2 DATE:
January 7, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns during the month.
(1) REASON:
(2) METHOD:
A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT There were no significant power reductions this period.
E2-2