JPN-93-042, Forwards Application for Amend to License DPR-59,requesting Addition of Remote Shutdown Panel LCOs & Surveillance Requirements,Per GL 81-12, Fire Protection Rule

From kanterella
(Redirected from JPN-93-042)
Jump to navigation Jump to search
Forwards Application for Amend to License DPR-59,requesting Addition of Remote Shutdown Panel LCOs & Surveillance Requirements,Per GL 81-12, Fire Protection Rule
ML20045D079
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/17/1993
From: Ralph Beedle
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045D080 List:
References
GL-81-12, JPN-93-042, JPN-93-42, NUDOCS 9306250308
Download: ML20045D079 (2)


Text

w 123 Main Street White Plains, NewYork 10601 914 681.6846 A NewYorkPower ea,,n e. a...,,

& Authority exeevi~e v'ce eres>oemt Nuclear Generation June 17,1993 JPN-93-042 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, D.C. 20555 1

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Change to the Technical Specification Addition of Remote Shutdown Panel LCOs and Surveillance Recuirements (JPTS-92-004) l

REFERENCES:

1. NYPA letter, J.P. Bayne to NRC, dated July 13,1982 l

(JPN-82-061) " Reassessment of Fire Protection Features for Conformance to Appendix R to 10 CFR 50."

l

2. NRC Safety Guide 1.22, dated February 17,1972

" Periodic Testing of Protection System Actuation Functions."

3. NRC Inspection 50-333/92-80, dated April 15,1992 ([[::JAF-92-110|JAF-92-110]]) " March 6-201992 - Special Safety Team inspection of Fire Protection Program."
4. NRC Generic Letter 81-12, " Fire Protection Rule," dated February 20,1981.
5. NRC NUREG-1433 " Standard Technical Specifications in General Electric Boiling Water Reactors (BWR/4),"

Revision 0, dated September 1992.

Dear Sir,

The Authority committed to prepare and submit Technical Specifications (i.e., LCOs, Surveillance Requirements, and Bases sections) for the remote / alternate shutdown equipment (Reference 1). The new surveillance testing intervals were to be consistent with Regulatory Guide 1.22 (Reference 2) guidelines as applied to FitzPatrick. Furthermore, the Authority committed (Reference 3) to develop a periodic surveillance test procedure for the remote / alternate shutdown panels in conformance with the requirements of Generic Letter 81-12 (Reference 4).

2400??

This proposed Technical Specification change fulfills these commitments.

The proposed Technical Specification sections, and the associated bases, are

.(

based on the improved Standard Technical Specifications (Reference 5).

}

9306250309 930617 PDR ADOCK 05000333 l

p-PDR

e*

The signed original of the Application for Amendment to Operating License is enclosed for filing. Attachments I and ll to this application contain the proposed changes to the Technical Specifications and the associated Safety Evaluation.

A copy of this application and the associated attachments are being i

provided to the designated New York State officialin accordance with i

10 CFR 50.91.

If you have any questions, please contact Mr. J. A. Gray, Jr.

1 Very trul yours, N

RaiphE.l3ee'dle E

att: as stated cc: Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road l

King of Prussia, PA 19406 l

Office of the Resident inspector U.S.- Nuclear Regulatory Commission l

. P.O. Box 136

' Lycoming, NY 13093 Mr. Brian C. McCabe

.)

Project Directorate 1-1 Division of Reactor Projects - 1/11 U.S. Nuclear Regulatory Commission Mail Stop 14 B2 Washington, DC 20555 l

i Ms. Donna Ross New York State Energy Office 2 Empire State Plaza 16* Floor Albany, NY 12223