JAFP-88-0020, Monthly Operating Rept for Dec 1987

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1987
ML20149F738
Person / Time
Site: FitzPatrick 
Issue date: 12/31/1987
From: Radford Converse, Jackie Cook
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
JAFP-88-0020, JAFP-88-20, NUDOCS 8801140319
Download: ML20149F738 (8)


Text

DOCKER NO: 50-333 UNIT NAME FITZPATRICK DATE January 4, 1987 CCMPLE1HD BY JOHN COOK TELEPHONE (315) 349-6569 OPERATING STATUS 1.

UNIT NAME:

FITZPATRICK NOITS 2.

REPORTING PERIOD: 871201 - 871231 3.

LICENSED THERMAL POWER QWI):

2436 4.

NAMEPLATE RATING (GROSS ME):

883 5.

DESIGN ELECTRICAL RATI..' (NET ME):

816 6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MG):

823 7.

MAXIMUM DEPENDABLE CAPACITY (NET ME):

794 6.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITDIS 3 - 7) SINCE IAST REPORT, GIVE REASONS:

9.

POWER LEVEL 10 kHICH RESTRICrED, IF ANY (NEP ME):

10.

REASONS FOR RESTRICTIONS, IF ANY:

THIS LONTH YR-TO-DATE CUMUIATIVE 11.

HOURS IN REPORTING PERIOD.

744 8760 108961 12.

NUMBER OF HOURS REACIOR WAS CRITICAL.

710.8 6161.3 79652.7 13.

REACIOR RESERVE SHUrDCLE HOURS.

0 0

0 14.

HOURS GENERATOR ON-LINE.

702.7 5894.8 77353.1 15.

UNIT RESERVE SHUrDOWN HOURS.

0 0

0 16.

GROSS THERMAL ENERGY GENERATED OkH).

1667112 13094154 167227276 17.

GROSS ELECTRICAL ENERGY GENERATED QLH).

565600 4346280 57169240 18.

NET ELECIRICAL ENERGY GENERATED OLU).

545995 4198340 54778470 19.

UNIT SERVICE FACIOR.

94.4 67.3 71.0 20.

UNIT AVAIIABILITY FACIOR.

94.4 67.3 71.0 21.

UNIT CAPACITY FACIOR (USING MDC NET).

92.4 60.4 64.7 22.

UNIT CAPACITY FACIOR (USING DER NET).

89.9 58.7 61.6 23.

UNIT FORCED OUTAGE RATE.

5.6 5.6 11.7 24.

SHUrDOWNS SCHEDULED OVER NEXT 6 lDNIES (TYPE, DATE AND DURATION OF EACH):

MAINTENANCE OUTAGE TO C@ FENCE 1/9/88 AND IAST APPROXIMATELY 10 DAYS.

25.

IF SHUR DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

26.

UN1TS IN TEST STATUS (PRIOR TO Caf4ERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECIRICITY OCMERCIAL OPERATION k

8801140319 871231

-f[

PDR ADOCK 05000333 R

DCD

~

D00GT No: 50-333 UNIT: FITZPATRICK DATE: January 4, 1988 COMPIEIED BY: J01N COOK TELEPHONE: (315)349-6569 l

FDNIM: DECD4BER 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL FWe NET MJe NET 1

798 17 791 2

799 18 798 3

798 19 800 4

794 20 799 5

797 21 799 6

798 22 799 7

798 23 799 8

798 24 800 9

307 25 798 10 0

26 799 11 438 27 799 12 660 28 799 13 747 29 799 14 792 30 800 15 649 31 SOL 16 798 l

SlWARY: h FitzPatrick plant operated at near full thermi power until 871209 whm the unit tripped while performing surveillance testing. The plant returned to service j

on 871211.

i

JAMES A FITZPATRICK NUCLEAR POWER PLANr UNIT SHUrDOWNS AND POLER REDUCTIONS DOCKER NO: 50-333 LNIT NAME: FITZPATRICK -

DATE: Jan. 4, 1988 REPORT FONIH: DEQMBER 1987 CCEPLETED BY: JOHN 000K TELEPHONE: (315)349-6569 D

C UH R

MEIHOD S

O RC E

OF YC MC' CAUSE AND CORRECTIVE ACTION AU A

SHUITING LICENSEE SO PO TO NO.

DATE TYPE TR S

DOWN EVENT TD 0D PREVENT RECURRENCE IS O

THE REPORT EE NE O

N REACIOR M-E l

N N

T 11 871209 F

41.3 B

3 87-20 N/A N/A REACIOR' SCRAM ON FALSE IDW LEVEL DUE TO PERSONNEL ERROR WHIII CONDUCTING SURVEILIANCE TEST.

i 1

2 3

4 F: FORCED RFASON:

MEIHOD:

EXHIBIT G.- INSIRUCTIOtE S: SCHEDULED A. EQUIPMENT FAILURE (EXPLAIN)

'1-MANUAL IUR PREPARATION OF IKTA B. MAIhTENANCE OR TEST 2-MAhTIAL' SCRAM ENIRY SHEETS IUR LICENSEE C. REFUELING 3-AUIG RTIC SCRAM EVENT REPORT (LER) FILE D. REGUIATORY RESTRICTION 4-00NTINUED (NUREG-0161)

E. OPERATOR TRAINING AND LICENE EXAMINATION 5-REDUCED IDAD F. AININISTRATIVE 9-OrHER G. OPERATIONAL ERROR (EXPIAIN)

H. GIEER (EXPIAIN) 1

.A

.i '

f

?

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE-.

i i

DECEMBER 1987; The FitzPatrick plant. operated 'at -neai full thermal power' during this reporting period. 'On December 19, 1987 the.

l unit' tripped'on;a false low, level signal-generated during surveillance testing.

.The plant' returned to seevic.e on.

December-11, 1987.

1 i

At the end of the reporting period, the plant is operating'

{

at approximately~.800 MW '

e i

f i

m i

~i

)

r t

f l

l

{

)i i

i l

t t

i i

i L

i

l NEW YORK POWER AUITORITY JAMES A. FITZPATRICK NUCEAR POWER FIANT MAINTENANCE SG MARY l

D00TP NO: 50-333 I

UNIT NAME: FITZPATRICK*.

I DATE: Jan 6, 1988 COMPETED BY: JOHN COOK TELEPHONE: (315) 349-6569 FOR THE FONTH OF: DECEMBER 1987 l

WORK REQUEST NO.

IKM CAUSE OF RESULTS OF ACTION TAKFN TO REPAIR DATE SYSTEM COMPONENT NO.

Deal;nD MALFUNCTION MALFUNCTION PRECLUDE RECURRENCE TIME.

HOURS 870804 03 059557 OPS NEEDLE VALVE VALVE FAILED TO CLEARED VALVE BY 6

AOV-36 CIDGGED SHUR TAPPING ON LINE 871209 07 056495 OPS BROKEN SLIDEWIRE RED PEN STICKING REPLACED SLIDEWIRE 4

R-45 UPSCALE 871209 07 056497 JIC NEEDS CALIBRATION VOLTAGE OUT OF ADJUSTED OUFPUr 4

IIFI T AND N1JUSTMENT TOLERANCE 871203 07 059022 OPS NONE-kORKS READS HIGH leN A CALIBRATION 8

PR-46D SATISFACIORILY CHFfK 871204 07 059044 OPS NO APPARENT FAILED DOWNSCALE REPIACED LPRM 20 PN-12-21G PROBLENS FOUND AMPLIFIER CARD 871208 07 059045 OPS BURNED RESISTORS BIACK PEN IUr RFPIACED RESISTORS 17 PR-46D AND BROKEN WIRE RESPONDING R18 871203 12 052308 OPS FDD M1-87-054 REPLACE T E P IND REPLACFD TIS-89B,99 52 TIS-89,99 871125 17 056021 OPS NONE FOUND CHECK SOURCE FONTIOR READING 22 RIS-432 MorIOR IUr WORKING 100 CPM 871208 17 059096 OPS FDISTURE IN FDNTIOR IS DEIECIOR RFlOVED AND 10 RM-53B 00NNECIOPS READING 100 HIGH DRIED OUT 871125 27 045386 OPS WORN PART DRIVE SPRING IS REPIACED CHART DRIVE 4

R-101 BROKEN PARES I

i

WEW W)RK POWER AUIMORIlY

~

JAMES A. FITZPATRICK NUCLEAR POWER PIRT MAINTENANCE SIINARY DOCRET ND: 50-333 UNIT NAME: FITZPATRICK.

DATE: Jan 6, 1988 O WPLETED BY: JOHN 000K TEEPHONE: (315) 349-6569 EDR THE M)NIH OF: DECDIBER 1987 M)RK REQUEST NO.

HOW CAUSE OF RESULTS OF ACTION TAKEN TO REPi1R IRTE SYSTEM G NPONENT ND.

DETECIED MAIRINCTION MALFUNCITON PRECLUDE RECWRENCE TIME.

HOWS 871209 27 055603 JIC UNKNOWN M)NIIOR PEGGED RDOVED & REINSTALLED 8

RM-102B UPSCAIE CARD 871216 31 055367 OPS II)0P POWER SUPPLY NEEDS 70 BE REPIACED RESISIOR 32 PI-1A DEFECTIVE CALIBRATED 871203 31 059081 JIC SIIM RESPONSE AND CHECK' OPERATION ADJUSTED GAIN AND 6

PCV-103 0FESEr OF CX)NIRLER VALVE RESET 871209 71 064492 OPS BAD THERK)COUPIE O N PUTER PT READS REPIACED THERM)OOUPLE 58 bu AC T085 700 IIM' 871123 93 059014 OPS NONE-READ READS 12 IIM NONE TAKEN 2

LI-101A CORRECILY

NEW YORK POWER AUlEORITY JldES Ao FITZPATRICK NUCLEAR POWER PIANT SAFEfY REIJtTED ELECTRICAL & MECHANIOL MAINTENANCE

SUMMARY

DECEMBER 1987 REPAIR KORK REQUEST f TIME DATE SYSTEM C mPONENT HOW DETECTED CAUSE OF MAIELTUTION ACTION TAKEN 'IO PRECLUDE RECURRENCE HOURS 12/11 71 52239 MAINr Nonml Aging Replace 15 Flame Arrestors 6.5 EXT 3A 12/11 72 55648 OPS Failed Bearings Replaced bearings & Belts 16 78U 10B 12/21 70 59965 TECH. SVCS Design Problem Installed pipe caps on drain valves 4

CR Ventilation 12/21 66 53939 MAINr Broken Reset Buttons Replaced reset buttons 2

B IPCI 12/18 76 55651 OPS Oil Dipstick Broken Replaced Dipstick 1

P-1 12/17 76 37964 MAINT Nonnal Wear Replaced valve 12 FPS 7000 12/28 76 56479 OPS Lamp Burned Out Replaced imp 2

ED3T

Jtm:s A. Fitr9ttrick Nucleer*Powir Pl:nt P O &n 41 Lycoming, New York 13093 31% 342 3640 Radford J. Converse

  1. > NewYorkPower 4# Authority January 8, 1988 JAFP-88-0020 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 ATTENTION:

DOCUMENT CONTROL DESK

REFERENCE:

DOCKET NO. 50-333

Dear Sir:

Enclosed please find the J. A. FitzPatrick Nuclear Power Plant Operating Status Report for the month of December, 1987.

Refueling information remains the same as previously submitted.

If there are any questions concerning this report, please contact John Cook at (315) 349-6569.

-(..c v i

RA FORD J.

CONVERSE ENCLOSURES RJC:JPC:mac cc:

Distribution k

I I