JAFP-86-0580, Monthly Operating Rept for June 1986
| ML20202G297 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 06/30/1986 |
| From: | Radford Converse, Jackie Cook POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| JAFP-86-0580, JAFP-86-580, NUDOCS 8607150362 | |
| Download: ML20202G297 (9) | |
Text
,
s JAMES A. FITZPATRICK NUCLEAR POER PLANT OPERATING DATA REPORT DOCKER No.
50-333 UNIT NAME F m FATRICK DATE 34*dtR:Y 1986 COMPLETED BY JOHN COOK TELEPHONE (315)342-3840 OPERATING STATUS 1.
UNIT NAME:
FITZPATRICK NOTES 2.
REPORTING PERIOD: 860601-860630 3.
LICENSED THERMAL POWER (NTT):
2436 4.
NAMEPIATE RATING (GROSS MWE):
883 5.
DESIGN ELECTRICAL RATING (NET MWE):
816 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
823 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
796 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEbS 3 - 7) SINCE IAST REPORT, GIVE REASONS:
NONE 9.
POWER LEVEL 10 WHICH REs1KIUltD, IF ANY (NEr MWE):
NONE 10.
REASONS FDR RESTRICTIONS, IF ANY:
THIS FDNTH YR-10-DATE CUMULATIVE 11.
HOURS IN REPORTING PERIOD:
720 4343 95784 12.
NUMBER OF HOURS REACIOR WAS CRITICAL:
720 3937.2 69352.8 13.
REACIOR RESERVE SHUIDOWN HOURS:
0 0
0 14.
HOURS GENERAIOR ON-LINE:
720 3825.6 67351.7 15.
UNIT RESERVE SHUTDOWN HOURS:
0 0
0 16.
GROSS THERMAL ENERGY GENERATED (NWH):
1738896 9081384 144795058 17.
GROSS ELECIRICAL ENERGY GENERATED (&M):
592180 3095850 49689060 18.
NET ELECTRICAL ENERGY GENERATED (MWH):
572240 2990755 47555280 19.
UNIT SERVICE FACIOR:
100%
88.1%
70.3%
20.
UNIT AVAIIABILITY FACIOR:
100%
88.1%
70.3%
21.
UNIT CAPACITY FACIOR (USING MDC NET):
99.8%
86.5%
64.2%
22.
UNIT CAPACITY FACIOR (USING DER NET):
97.4%
84.4%
60.8%
23.
UNIT FORCED OUTAGE RATE:
0%
2.7%
12.7%
24.
SHUIDOWNS SCHEDULED OVER NEXT 6 FDNIHS (TYPE, DATE AND DURATION OF EACH):
Planned maintenance outage lasting approximately 10 days to cmmence late September 1986 25.
IF SHUR DOWN AT END OF REPOKE PERIOD, ESTIMATED DATE OF STARTUP:
26.
UNITS IN TEST STATUS (PRIOR 10 C0bHERCIAL OPERATION):
FDRECAST ADIIEVED INITIAL CRITICALITY INITIAL ELECIRICITY COENERCIAL OPERATION 8607150362 860630 DR ADOCK 0500 3
N$
JAMES A. FITZPATRICK NUCLEAR POWER PLANT AVERAGE DAILY UNIT POWER LEVEL DOCKET No.
50-333 UNIT FJ.IZPATRICK DATEau*%bY 1986 004PLETED BY JOHN COOK TELEPHONE (315)342-3840 M)NIH JUNE 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1
802 17 800 2
801 18 800 3
803 19 800 4
801 20 799 5
801 21 799 6
798 22 800 7
803 23 799 8
802 24 798 9
801 25 796 10 801 26 799 11 800 27 799 12 801 28 675 13 801 29 766 14 801 30 796 15 800 31 16 800 SlM4ARY: The FitzPatrick plant operated at near full thermal power for this entire reporting period.
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE JUNE 1986 The FitzPatrick plant operated at near full thermal power.
for this entire reporting-period.
At the end of the period the unit is. operating at approximately 796 MW,.
C
JAMES A. FITZPATRICK NUCLEAR POWER PLANT UNIT SHUIDOWNS AND POWER REDUCITONS DOCKER NO.
50-333 UNIT NAME N DNIE JULY 1986 REPOKr 10NIH JUNE 1986 COMPIEEED BY JOHN 00(E TELEPHONE (315)342-3840 D
C UH R
METHOD S
O RO E
OF YC MC CAUSE AND 00Rh.frIVE ACTION AU A
SHUITING LICENSEE SO PO TO NO.
DATE TYPE TR S
DOWN EVENT TD 0D PREVENT RECURRENCE IS O
THE REPORT EE NE O
N REACIDR M
E N
N T
NONE 1
2 3
4 F: FORCED REASON:
MEIHOD:
EXHIBIT G.- INSTRUCTIONS S: SCHEDULED A. EQUIPMENT FAILURE (EXPIAIN) 1-MANUAL FOR PREPARATION OF DATA
-B. MAINIENANCE OR TEST 2-MANUAL SCRAM ENIRY SHEETS FOR LICENSEE C. REFUELING 3-AUID RTIC SCRAM EVENT REPOKE (IER) FILE D. REGUIATORY RESTRICTION 4-0IHER (EXPIAIN)
E. OPERATOR TRAINING AND LICENSE EXAMINATION F. AIMINISTRATIVE G. OPERATIONAL ERROR (EXPIAIN)
H. 01HER (EXPIAIN)
NEW YORK POWER AUITORITY JAMES A. FITZPATRICK NUCLEAR POWER PIANT MAINTENANCE Subt4ARY JUNE 1986 AUn0N TAKEN REPAIR WORK REQUEST NO.
HOW CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM C WPONENT NO.
Dr;1u;1tv MALFUNCTION MALFUNCTION RECURRENCE HOURS 860605 02 041612 OPS AGE CHANNEL A CLEANED, LUBED, CAL, 10 TR-165 FLUCIUATES/ DRIFTS TC REPLACED l
l 860612 07 041506 OPS DIRTY, GENERAL Y-AXIS PEN CLEANED, SERVICED 37 R-131 MAINTENANCE F0VEMENT PER ICSO-12 l
NEEDED NOT SB00TH 860624 07 041583 OPS FAULTY AND/OR TIP MACH FAIL 10 CLEANED C SW; ORDER 10 NM-131C/D DIRTY SWITCHES SEE LIMITS NEW D SWITCH 860517 07 041830 OPS AGE AIUUSTING VALVE REPIACED ROTAMETER 6
FIJ0W Mt;1tK NUT PJRJIATING 860606 07 042429 OPS INSTRINENT DRIFT APRM, RBM ROD CALIBRATED 07-FT-110 64 FU-14C FIDJ UNIT C BIJ0CKS cme G AND H; SEE ICSO-12 5% OFF PRD4ATURELY 860530 07 042813 OPS DIRTY AND IDOSE SPURIOUS UPSCALE; CLEANED, TIGRTENED 25 PN-40D CONNECTIONS HI/HI TRIPS HI VOLTAGE CONNECT.
860603 07 043143 JIC PREAMP CONNECIOR IRM F SPIKES WHILE NEW Dt;1u;10K CONNECT 50 IRM F F0VING RODS AT PREAMP INPUT 860530 10 042408 OPS AGE LEVEL SWITCH WON'T REPIACED BAD SENSOR; 10 1s-103 RESET FOR WEr IND.
SEE ICS0-12 I
I I
- -~.
NEW YORK POWER AUIHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE St1HARY 1+'
JUNE 1986 AUn0N TAleN IUTAIR WORK REQUEST NO.
HOW CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMtueNE ND.
DEFECTED MALFUNCTION MAIRNCTION RECURRENCE HOURS 1
860625 15 042439 OPS DIAPHRA W AREA H o LEAKED OUT REPIACED SWITCH; 35 t
'FS-122A CORRODED TUP 00VER;ISP-23 PERFORMED IS-E-02 1
4 i
860602 16-1 041657 OPS DIRT DRYWELL PRESSURE REINSTALLED, REPAIRED 16 t
}^
DPIT-101 MENSOR STICKING MENSOR; CALIBRATE i-ISP-35 i
l i -
360610 16-1 042474 OPS ZERO REFERENCE NOM MV OUTPUT NOT AIUUSTED ZERO 10 10 DPIT-102 AIUUSTED PROPERLY CALIBRATED TO sYm m CATIONS 860609 17 032837-OPS SWITG CONTACTS REFUEL FIDOR REPIACED BULB AND 13 RIS-456B BAD EXHAUST M)NTIOR SWIIG NUr FUNCTIONING 1
I 860609 17 042466 OPS GAIN MAIAIUUSTED M)NITOR OPERATING ADJUSTED GAIN; IMP G-12 5
i RR-433-ERRATICALLY ICSO-12 I
860609 17 042467 OPS WDRN OUT AND F-ST-1G/ RAD REPIACED BAD CONNECIU
'6 l
RM-251A FRAYED WIRE M)NITOR FAILED
[
DOWNSCALE
)
i 860530 17 042824 OPS MAIAIMUSTED RECutu2K/ METER RESET MECH SIOP, AIU.
16 RIS-431 EQUIPMENT READINGS DIFFER AIMUSTED AMP GAIN,EIC j
860611 23 042476 OPS PROCESS LINES ON HPCI TURBINE /PtNP VENTED PROCESS LINES 10 TU-2 23-Fr-82 OSCILIATING j
1 1
e
~
NEW YORK POWER AUIHORITY JAMES A. FITZPATRICK NUCLFAR POWER PIANT MAINTENANCE SUtEARY JUNE 1986 NORK REQUEST NO.
HOW CAUSE OF RESULTS OF ID PRECLUDE TIME DATE SYSTEM CCEPONENT ND.
DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 860610 27 024128 OPS BAD M7IOR ON INSUFFICIENT REPIACED M7IDR OPERA 101L 16 RM-102A M7IOR OPERATOR PARTICULATE PUMP VALVE / CALIBRATED VALVE FI N 860609 27 043384 OPS AGE SOUDI DRYWELL REPIACED METER 32 RM-101 WNST.10NITOR NOT WORKING 860530 76 041597 OPS RJSE BIDWN FIRE DOOR AND FUSE F3 REPIACED WITH 16 CP-SRP DAMPER PANEL 1 AMP RISE INOPERABLE 860528 76 042864 OPS ZH-30 W DULE ZONE 1 FUSES JtNPED TERMINAIS 10 ZONE 1 WIRED WRONG NEED REPEATED 2-3 ON ZH-30 REPIACEMENT I
I I
I
..m m
v
NEW YORK POWER ALTINORITY JAMES A. FITZPATRICK NUrrFAR POWER PLANT SAFE 1Y REIATED ELECIRICAL & MECHANICAL MAINIENANCE SLPHARY JUNE 1986 I
KIEAR TDRK REQUEST /
TDE DATE SYST&1
,_ *PONENT HOR DETECIED CAUSE OF MALFUNCTION ACTION TAKEN 10 PRECLUDE RECURRENCE HOURS 6/12 27 424/9 OPS Wom gasket Replaced gasket.
3 F-61
._ __------------------------------------------==-_____=---------------------------- --- -------------===_____-------.
t' 6/10 27 43151 OPF Wom diaphragm and Replaced diaphragm and 0-rings.
24
-P-11A 0-rings 6/6 73 42514 OPS Worn belts Replaced belts.
2 FN-2A
.---==_=_
6/3 01-125 42544 PM Torque switch binding Replaced torque switch.
4 B0V-100A
===-
_===------------------==__ __.. --------===--------------------- =_-_____=----------------_====__===___===_==-
6/2 01-125 31218 PM
' Cracked torque switch Replaced torque switch.
4 bOV-13A
_==. - - - - - = = = - - - - - - - - - - - - - - - - - - - - _ _ _ _ = - _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
6/24 24 42489 OPS Bent actuator Straightened switch actuator.
7 EOD-1
__ =___
=-----========_--_ -----------------------------------------------------------------------------------------
6/26 76 39846 OPS Seat leakage Replaced valves.
16 Valves 4
- _ - - - - - - - - _ = = = = - - - - - - - - - - -
_ _ = - - - - - - - - - - - - - - - - -. - = _ = - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ _ = = _ - - - -
6/26 10 42554 PM Worn locknut Replaced locknut.
30
}0V-66A
===- _===- =-----------=--.
=__ _ - =---------------------
i i
^
l
x-3 J:mes A. FitzP: trick
'Nuclxt Pow:r Plant PO Box 41 Lycoming NewYork 13093 315 342.3840 Radford J. Converse
- > NewYorkPower 4# Authority July 10, 1986 JAFP-86-0 580 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION:
DOCUMENT CONTROL DESK
REFERENCE:
DOCKET NO. 50-333
Dear Sir:
Enclosed please find the J.
A.
FitzPatrick Operating Status Report for the month of June, 1986.
Refueling information remains the same as previously submitted.
If there are any questions concerning this report, please contact John Cook at (315) 342-3840, Ext. 439.
w RADFORD J. CONVERSE RESIDENT MANAGER RJC:JPC:mac Enclosures cc:
Distribution
.rE1Y
-