JAFP-86-0208, Monthly Operating Rept for Feb 1986
| ML20141N538 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 02/28/1986 |
| From: | Radford Converse, Jackie Cook POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| JAFP-86-0208, JAFP-86-208, NUDOCS 8603140475 | |
| Download: ML20141N538 (9) | |
Text
'
'~
JAMES A. F"TZPATRICK NUCMAR 70WER FIANT OPERATING MTA REPORT DOCKER NO.
50-333 LNIT NAME e m rAIRICK DATE MARG 1986 OCMPLETED BY JOHN WOK TELEPIENE (315)342-3840 (PERATING STATUS J
1.
INIT NAME: _
FITZPATRICK
- 2...
REPORTING PERIOD: 860201-860228 3.
LICENSED THERMAL FUWER OWI):
2436 4..
NAPEPIATE RATING (GtOSS WE):
553 5.
DESIQi EECIRICAL RATING Qer NWE):
816 6.
MAXMM DEPENDABLE CAPACITY (GtOSS WE):
823 7.
MAXMM DEPEEABM CAPACITY (NEr WE):
796 8.
.IF CHANGES OCCUR IN CAPACITY RATINGS (nuts 3 - 7) S Desian Electrical Rating, MDC Gross and MDC Net have been revised to reflect current flant conditions 9.
ruWER IEV:L IU WIm temIUlm, IF ANY (re;r NE):
- NUtt, 10.
REASONS FOR RESTRICTIONS, IF ANY:
THIS }0NIH YR-TU-DATE CLNUIATIVE 11.
HOURS IN REPORTING PERIOD:
672
-1416 92857 12.
NtNBER OF }0URS REACIOR WAS CRITICALi 672 1416 66831.6 13.
REACIOR RESERVE SIMFDOWN HOURS:
0 0
0 J14..
}0URS GENERATOR ON-LINE:
67z 1416 64942.1 15.
UNIT RESERVE SHUIDOWN HOURS:
0 0
0
'16.
GROSS THERMAL ENERGY GENERATED (WH):
1632264 34z/360 139141234 17.
GtOSS ELECTRICAL ENERGY GENERATED (ER):
335490 1172770 47763980 i
18..
NET E2CIRICAL ENERGY GENERATED (ER):
539705 1132565 45697090 19.
UNIT SERVICE FACIOR:
100 100 69.9 l
20.
INIT AVAIIABILITY FACIOR:
100 100 69.9 i
' 21.
UNIT CAPACITY FACIOR (USING MDC NET):
101 100 63.6 22.
UNIT CAPACITY FACIOR (USING DER NET):
98.4 98.0 60.3 23..
INIT FORCED OUTAGE RATE:
0 0
12.9 24.
SHUIDOWS SCHEDULED OVER NEXT 610NIHS (TYPE, DATE AND DURATION OF EACH):
Planned maintenance outage connencing March 13 to last approximately 2 weeks 25.
IF SHUR DOWN AT END OF REPORT PERIOD, ESTIMATED DA'IE OF STARTUP:
-26.
INITS IN TEST STATUS (PRIOR TO 00BNERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL E2CrdICITY l
03NERCIAL OPERATION
JAMES A, FITZPATRICK NUCLEAR POWER FIANT AVERAGE DAILY UNIT POWER IEVEL DOCKET NO.
50-333 UNIT nT uAIRICK MTE MARCH 1986 OCEPLEIED BY 'JQIN 000K TELEPIENE (315)342-3840 10NIH FEBRUARY 1986 MY AVERAGE MILY POWER LEVEL MY AVERAGE DAILY POWER LEVEL 1
804 17 804 2
802 18 803 3
803 19 803 4
803 20 802 5
808 21 801 6
810 22 803 7
798 23 803 8
803 24 803 9
803 25 803 10 804 26 803 11 804 27 804 12 803 28 801 13 804 29 14 802 30 15 803 31 16 804 SGNARY: The FitzPatrick plant operated at near full thermal power for this entire reporting period.
JAMES A. FITZPATRICK NUCLEAR POWER PLANT UNIT SHUTDOWNS AND POWER REDUCTIONS
- 1 DOCKET NO.
50-333 UNIT NAME FITZPATRICK DATE MARCH 1986 REPORT MONTH FEBRUARY 1986 COMPLETED BY JOHN COOK TELEPHONE (315)342-3840 D
C UH R
METHOD S
O R0 E
OF YC MC CAUSE AND CORRECTIVE ACTION AU A
SHUTTING LICENSEE SO PO TO NO.
DATE TYPE TR S
DOWN EVENT TD-0D PREVENT RECURRENCE IS 0
THE REPORT EE NE O
N REACTOR M
E N
N T
NONE 1
1 2
3 4
F: FORCED REASON:
METHOD:
EXHIBIT C.- INSTRUCTIONS S: SCHEDULED A. EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL FOR PREPARATION OF DATA B. MAINTENANCE OF TEST 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C. REFUELING 3-AUTOMATIC SCRAM EVENT REPORT (LER) FILE D. RECULATORY RESTRICTION 4-0THER (EXPLAIN)
(NUREG-0161) j' E. OPERATOR TRAINING AND LICENSE EXAMINATION F. ADMINISTRATIVE G. OPERATIONAL ERROR (EXPLAIN)
H. OTHER (EXPLAIN) i
NARRATIVE SGt4ARY OF OPERATING EXIERIENCE FEBRUARY 1986 he FitzPatrick plant operated at near full thermal power for this entire i
reputi.ing period. Plant nodifications have caused changes to Design Electrical Rating (Line 5), Maxinun Dependable Capacity Gross (Line 6) pnd Maximan Dependable Capacity Net (Line 7). The new figures nore accurately reflect current plant conditions.
i At the end of the reporting period the Unit is operating at appruimately 801 We.
s
- e
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
FEBRUARY 1986 ACTION TAKEN REPAIR WORK REQUEST NO.
HOW CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT NO.
DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 860213 00 032095 OPS SHIPPING PACKAGE PERFORM P/N 164C5150P236157 11 ATIET.'lf.
DAMAGED OPERABILITY CHCK (QC CAGE) 860208 02-3 039862 OPS BAD TRANSMITIER INDICATOR AT MIU REPIACED DEFECTIVE 19 i
LT-72A READS UPSCALE TRANSMITTER i
860213 16 039882 OPS DEAD BATIERY REOORDER FAILS TO REPLACED BATIERY 13 DPR-200 STAMP CHART l
860205 1,
037991 OPS DRIFT METER NUT AGEE AIUUSTED ZERO AND SPAN 1
l RM/RR-434A WITH REOORDER ISP-25-1 860206 17 037992 OPS DRIFT MEiER NUT AGREE ADJUSTED ZERO AND SPAN 1
RM/RR-434B bTIH REOORDER ISP-25-1 l
860212 17 039675 OPS LIMIT SWIICH CAMS CHECK SOURCE NUT ADJUST LIMIT SWITCH 7
RIS-458A OUr-OF-SPAN MNE CAMS i
851216 23 041031 OPS BROKEN STA-KON GAVE DIV.II REPLACE STA-KON AND 19 RIC-117B AIARM/ISOIATION MIU-217B 860220 27 032859 I&C DRIFT (IMPUTER PI E027 AIUUSIED OM' UTER 40 s
RM-104B OUr-OF-SPECS
)
I I
-. _, ~
1 NEW YORK POWER AUTHORITT JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
FEBRUARY 1986 ACTION TAKEN REPAIR WORK REQUEST NO.
HOW CAUSE OF-RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT NO.
DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 860219 70 038559 OPS IMPROPER INSTRINNIS REINSTAIIED 00RRECILY -
28 F-11A&B INSTAIIATION INSTAILED IN00RRFLTIX 860212 72 03 % 76 OPS REAY FAULTY AttHICIATOR REPUCE AttDICIATOR 18 FN-31B INICAIES REAY 2D RLM 860206 76 038603 OPS BAD REAYS, CLEAR AIARM BY REPUCED REAYS APO 64 SD-342/343 S0WER JOINT INENSELVES RESOLDERED 1
i t
15M WRK PWER Alm 0RITY JAMES A. FITZPAIRICK NUCUAR PWER PUNT SAFE 1Y RE1ATED EECTRICAL & MECHANICAL PRINIDIANCE SLMERY FEBRUARY 1986-MrzAIR MRK REQUEST f TDE DATE SYSIDi CmPONENT HOW DE'IECIED CADSE OF MAIJUNCTION ACTION TAKEN 10 PRECUIE RECURRENCE H0lRS 2/3/
76 39719 OPS Packing worn.
Adjusted packing.
-3 P1
_____._______________________________________________________________________________________________________________________c 2/6 76 38626 OPS Valve seat leakage.
Replaced valve.
10 FPS-148 2/5 93 39856 0S Overspeed trip limit Adjusted limit switch.
21 EDG-C switch.
__________________________________________________________________a 2/14 71 39780 OPS Broken lead to grour.d Replaced lead.
14 BC-IA relay.
--____________________________________________________________________c 2/10 76 39803 OPS Relief valve leak.
Replaced relief valve.
4 IK-5
______________________________________x
James A. Fit: Patrick Nuclear Power Plant Po. Bon 41 Lycoming, New York 13093 315 342.3840 Radford J. Converse
- > NewYorkPbwer 4# Authority March 10, 1986 JAFP 86- 0208 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 ATTENTION:
DOCUMENT CONTROL DESK
REFERENCE:
DOCKET NO. 50-333
Dear Sir:
Enclosed please find the J. A.
FitzPatrick Operating Status Report for the month of February 1986.
Rs. fueling information remains the same as previously submitted.
If there are any questions concerning this report, please contact John Cook at (315) 342-3840, Ext. 439.
4MCW RADFORD J. CONVERSE RESIDENT MANAGER RJC:JPC:mac Enclosures cc: