MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0009, Monthly Operating Rept for Dec 1997 for Ja FitzPatrick Nuclear Power Plant1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0474, Monthly Operating Rept for Nov 1997 for Ja FitzPatrick Nuclear Power Plant1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0435, Monthly Operating Rept for Oct 1997 for Ja FitzPatrick Nuclear Power Plant1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0375, Monthly Operating Rept for Sept 1997 for Ja FitzPatrick Nuclear Plant1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Ja FitzPatrick Nuclear Plant JAFP-97-0341, Monthly Operating Rept for Aug 1997 for Jfnpp1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Jfnpp JAFP-97-0297, Monthly Operating Rept for Jul 1997 for Ja FitzPatrick Nuclear Power Plant1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0242, Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant1997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0203, Monthly Operating Rept for May 1997 for Ja FitzPatrick Npp1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Ja FitzPatrick Npp JAFP-97-0178, Monthly Operating Rept for Apr 1997 for Ja FitzPatrick Nuclear Power Plant1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0126, Monthly Operating Rept for Mar 1997 for JAFNPP1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for JAFNPP JAFP-97-0093, Monthly Operating Rept for Feb 1997 for James A. FitzPatrick Nuclear Power Plant1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for James A. FitzPatrick Nuclear Power Plant JAFP-97-0056, Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0012, Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0476, Monthly Operating Rept for Nov 1996 for James A. FitzPatrick Nuclear Power Plant1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for James A. FitzPatrick Nuclear Power Plant JAFP-96-0448, Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0401, Monthly Operating Rept for Sept 1996 for Jfnpp1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Jfnpp JAFP-96-0352, Monthly Operating Rept for Aug 1996 for Ja FitzPatrick Nuclear Power Plant1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0300, Monthly Operating Rept for Jul 1996 for Ja FitzPatrick Nuclear Power Plant1996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0275, Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0240, Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0196, Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant1996-04-30030 April 1996 Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0156, Monthly Operating Rept for Mar 1996 for Ja FitzPatrick Nuclear Power Plant1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0113, Monthly Operating Rept for Feb 1996 for Ja FitzPatrick Nuclear Power Plant1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0066, Monthly Operating Rept for Jan 1996 for JAFNPP1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for JAFNPP JAFP-96-0023, Monthly Operating Rept for Dec 1995 for Ja Fitzpatrick Nuclear Power Plant1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Ja Fitzpatrick Nuclear Power Plant JAFP-95-0535, Monthly Operating Rept for Nov 1995 for Jafnpp1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Jafnpp JAFP-95-0486, Monthly Operating Rept for Oct 1995 for Ja FitzPatrick Nuclear Plant1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Ja FitzPatrick Nuclear Plant JAFP-95-0444, Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant JAFP-95-0413, Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant JAFP-95-0372, Monthly Operating Rept for July 1995 for Ja FitzPatrick Nuclear Power Plant1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with ML20216D9541999-07-28028 July 1999 Safety Evaluation Authorizing Proposed Alternatives for Second 10-year Interval Pursuant to 10CFR50.55a(a)(3)(ii) ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0175, Annual Summary of Changes,Tests & Experiments for 1997/1998. with1999-06-0202 June 1999 Annual Summary of Changes,Tests & Experiments for 1997/1998. with JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With ML20207E9311999-02-26026 February 1999 Part 21 Rept Re Sprague Model TE1302 Aluminum Electrolytic Capacitors with Date Code of 9322H.Caused by Aluminum Electrolytic Capacitors.Affected Capacitors Replaced ML20202J0891999-02-0303 February 1999 Safety Evaluation Accepting Rev 2 of Third Interval Inservice Testing Program for Pumps & Valves for James a FitzPatrick Nuclear Power Plant ML20199M0891999-01-22022 January 1999 Part 21 Rept Re Failure of Square Root Converters.Caused by Failed Aluminum Electrolytic Capacitory Spargue Electric Co (Model Number TE1302 with Mfg Date Code 9322H).Sent Square Root Converters Back to Mfg,Barker Microfarads,Inc JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20198F9991998-12-0404 December 1998 Assessment of Licensing Basis for Use of Containment Overpressure Credit for Net Positive Suction Head Analyses Power Authority of State of New York,James a Fitzpatrick Nuclear Power Plant ML20196J3501998-12-0404 December 1998 SER Accepting License Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with ML20196F9251998-11-25025 November 1998 Safety Evaluation Re Thrid 10-year Interval Inservice Insp Program Relief Requests for Plant ML20195J7521998-11-18018 November 1998 Rev 7 to Jaf Colr ML20195K4211998-11-17017 November 1998 Safety Evaluation Authorizing Proposed Alternative in Relief Request VRR-05 Per 10CFR50.55a(a)(3)(i) & PRR-01,PRR-02R1, PRR-03,PRR-04,VRR-02,VRR-03 & VRR-04 Per 10CFR50.55a(a)(3)(ii) ML20195E1051998-11-13013 November 1998 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves, Issued 950817 ML20197G6221998-11-0606 November 1998 Non-proprietary Rev 7 to HI-971661, Licensing Rept for Reracking of Ja FitzPatrick Sfp ML20155H5321998-11-0303 November 1998 Safety Evaluation Authorizing Alternative to ASME Code Requirements for CRD Bolting ML20155H5801998-11-0303 November 1998 Safety Evaluation Authorizing Postponement of Beginning of Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) Re ASME Code,Section XI JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20155C2821998-10-30030 October 1998 Non-proprietary Rev 0 to GENE-187-30-1598 Np, CRD Bolting Flaw Evaluation for Ja FitzPatrick Nuclear Power Plant ML20154L6591998-10-14014 October 1998 Safety Evaluation Accepting Licensee Proposed Alternative to Snubber Visual Inservice Exam Intervals & Sampling Rates Requirements Contained in ASME Code,Section Xi,Subsection Iwf,Article IWF-5000 JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20153D2591998-09-21021 September 1998 SER Accepting Proposed Alternative Testing of Containment Following ECCS Suction Strainer Replacement ML20153B5611998-09-0101 September 1998 Rev 1 to JAF-SE-98-013, RHR & Core Spray Suppression Pool Suction Strainer Replacement ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant ML20237E8361998-08-25025 August 1998 Rev 6 to Colr ML20237E9471998-08-0808 August 1998 Rev 6 to Colr JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant ML20236X5881998-07-29029 July 1998 Safety Evaluation Supporting Amend 245 to License DPR-59 ML20236V8181998-07-29029 July 1998 Safety Evaluation Accepting Request for Relief from Implementation of Requirements of 10CFR50.55a Related to Containment Repair & Replacement Activities for James a FitzPatrick Nuclear Power Plant ML20153B5781998-07-28028 July 1998 Rev 0 to JAF-SE-98-025, HPCI & RCIC Suppression Pool Suction Strainer Replacement ML20236X3831998-07-14014 July 1998 Rev 2 to JAF-RPT-MULTI-02671, Summary of Detailed Evaluation for NRC Generic Ltr 96-06 ML20154L9201998-07-10010 July 1998 SER Accepting Rev to Reactor Vessel Surveillance Capsule Withdrawal Schedule for James a Fitzpatrick Nuclear Power Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant ML20217A4631998-03-23023 March 1998 Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP ML20202G9081998-02-0606 February 1998 Safety Evaluation Re Amend to License DPR-59 to Revise TS Tables 3.2-2 & 4.2-2 JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] |
Text
4 OPERATING DATA REPORT DOCKET NO. 50-333 DATE JAN. 1985 COMPLETED BY J. Cook TELEPHONE (315)342-3840 OPERATING STATUS
- 1. Unit Name: James A. FitzPatrick : Notes :
- 2. Reporting Period: 841201 - 841231 : :
- 3. Licensed Thermal Power (MWt): 2436 : :
- 4. Nameplate Rating (Gross MWe): 883 : :
- 5. Design Electrical Rating (Net MWe): 821 : :
- 6. Maximum Dependable Capacity (Gross MWe): 830 : :
- 7. Maximum Dependable Capacity (Net MWe): 810
- 8. If Changes Occur in Capacity Ratings (Items 3 Through 7) Since Last Report,Give Reasons:
NONE
- 9. Power Level To Which Restricted, If Any (Net MWe): NONE
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744 8784 82681
- 12. Number Of Hours Reactor Was Critical 651 7087.2 59616
- 13. Reactor Reserve Shutdown Hours 0 0 0 14 Hours Generator On-Line 614.9 . 6747.7 5/y4/.J
- 15. Unit Resecve Shutdown Hours 0 0 u
- 16. Cross Thermal Energy Generated (MWH) 1330944 15199368 122933934
- 17. Gross Electrical Energy Generated (MWH)- 451330 5061090 42280250
- 18. Net Electrical Energy Generated (MWH) 437415 4899375 40395013
- 19. Unit Service Factor 82.6% 76.8% IU.II
- 20. Unit Availability Factor 82.6% 76.8% /0.1%
- 21. Unit Capacity Factor (Using MDC Net) 72.6% 68.9% 63.6%
- 22. Unit Capacity Factor (Using DER Net) 71.6% 67.9% 59.5%
- 23. Unit Forced Outage Rate 0% 4.6% 13.5%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling outage scheduled for February 16, 1985 to last approximately 60 days.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY ~
COMMERCIAL OPERATION h
__ f
- AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT FitzPatrick
- DATE Jan. 1985
) COMPLETED BY J. Cook i
TELEPHONE (315)342-3840 MONTH December 1984 I
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL-(MWe-Net) (MWe-Net) 1 0 17 570 2 0 18 675 3 0 19 584
$ 4 19 20 725 5' 361- 21 803 ,
6 650 22 678 7 749 23 671 8 679 24 799
- j. 9 77a 25 805
! 10 804 26- 803 4
11 ana 27 799 I 12 aos 28 775 13 ano 29 695 I i
14 6ag 30 786 15- 11 31 803 16 106
SUMMARY
r The Fit: Patrick plant started up on 841204 and operated at near full
, thermal power for this reporting period with one unit shutdown on 841215 to repair a Core Spray valve.
o_______________.________ >
1 i
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-333 UNIT NAME FitzPatrick l DATE Januarv. 1984 REPORTMONTH D ecember 84 COMPLETED BY L cnnk TELEPilONE n1O la?-3R40 e.
c 4 uE Llansee c
l Date 1 kI 5 ?yy 5*. . Cause & Corrective
$*l 5 g oc Event 5,3 4 32 0 Action to i
o= x 3my Report se een u
}'u Prevent Recurrence d
l 15 841129 S 92.6 B 1 N/A SD HX Shutdown for Feedwater heater l maintenance (cumulative hrs
, 123.5) 16 841215 S 36.5 B N/A N/A BM ISV Shutdown to repair Core Spray minimum flow valve. Reinstalled valve seat and returned to service.
l l
l l 2 3 4 F: Forced Reason:
Method:
S: Scheduled A Equiprnent Failure (Emplain) Exhibit G Instructions 14tanual for Preparation of Data B-Maintenance of Test 2 Manual Scram- Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
D-Regulatory Restriction Event Report (LER) File (NUREG-40ther (Emplain) 0161)
E-Operator Training & License Emandnation F-Administrative 5 GOperational Errur (Emplain)
,- IIOther (Emplain) Exhibit I Same Source 1 -
l-
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DECEMBER 1984 Start up of the FitzPatrick plant was commenced on 841204 following a maintenance outage for repairs to the Feedwater Heaters. The unit operated at near full thermal power until 841215 when the plant shutdown to repair a loose seat on a Core Spray minimum flow valve. Repairs were completed and the plant returned to full power operations.
At the end of the reporting period the FitzPatrick plant is operating at approximately 803 Mw, .
NEWY0itK POWEll AUTil0lllIY-1AMES A.TITZPATillCK NUCLEAll POWER PLANT PAINIENAtlCE sun 1h1ARY DECFMBER. 1984 W0ll![ REQUESTNO. Il0YI CAUSE OF RESULTS OF AClION TAKEli REl' AIR DATE SYSTEA1 DETECTED R1ALIUNCf10N A1ALFUNCT10N yCIPE 1 8
- CDP.1Put!ENI HU. , 0b1ER 841205 02 027905 OPS ZERO DRIFT (LOW) FLOW TRANSMITTER CAL'D AS PER 7.5 FT-110-G DUE TO TIME READING LOW ISP-63-1 841205 02 027894 OPS NEEDED ADJUSTMEhT FLOW TRANSMITTER PERF. APPLICABLE 8.0 FT-110H DUE TO TIME VERY LOW OUTPUT SEC. OF ISP-63-1 841130 02-3 027846 OPS DEFECTIVE DRIVE RX VESSEL TEMP REPLACED GEAR AND 4.5 TR-89 CEAR RECORDER FAILED SHAFT ASSEMBLY 841202 02 023051 I&C AGE RIGHT HAND DRAIN REPLACED VALVE 2.0 DPIS-119C VALVE LEAKS 841203 02-1 027864 OPS BAD U-9 GATE RSCS DOES NOT REPLACED RELAY 20.0 RSCS PERFORM PROPERLY K56 & U-9 CATE 841213 02-3 017426 I&C WEAR OF "O" BARTON 288A SMOOTH COUCE AND 16.0 LIS-101D RINGS, COUGES LEAKY HOUSING CLEANED "O" RINGS 841212 02-3 034280 OPS UNABLE TO TRIP LCHT LIT, PERF. ISP-5, 1.5 TU-278C DETERMINE WILL NOT RESET WORKING PROPERLY LOCALLY 841219 02-3 034345 OPS FAILED FILTER ALARM TRIP REPLACED 50000 uf 8.0 TU-278A&C CAPACITOR LED LIT CAP. ON PVR SPLY 841108 03 034180 OPS LOOSE LICHT DOES NOT IND. CORRECTED LIGHT 1.0 10-11 BULB IN DISPLAY FULL OUT OUT RSCS BULB 841203 07 034262 OPS DEFECTIVE NO RESPONSE TO REPAIRED INPUT 8.0 NM-33A CONNECTOR (WORN) PWR LVL CHANGES CONNECTR TO PREAMP 841202 07 028708 OPS RECORDER OUT OF RECORD READER 5% CAL'D USING IMP 4.0
. PR-46D CALIBRATION LESS THAN MTR 7.28 841129 07 028782 OPS TRIP CKT OUT OF 'A' RBM TRIPPING ADJ R21 AND R18 1.0
. NM-82A ADJUSTMENT INOP CIRCUIT AND TESTED
. =e * *E=
t M
NEWYORit POWER AUIll0RITY-JAMES A.FITZPATRICit NUCLEAR POWER PLANT
_ MAINTENANCE
SUMMARY
DECEMBER. 1984 W0ltK REQUEST NO. Il0YI CAUSE OF RESULTS OF ACIl0N TAKEN REl' AIR
' 8E DATE SYSTEM COMPUMENT llo. DETECTED MALFUNCTION MALFUNCTION yCIP If0 I 841217 07 027898 OPS UNKNOWN-UNABLE TO COES INOP WITH SATIS. OPER. AT 2.0 RBM-A DUPLICATE PROBLEM TOO FEW INPUTS STARTUP 841220 09 023021 JIC PROBLEM IN RELAY COMP. PT. F207 CHANGE COMP. CARD- 24.0 F207 IN COMPUTER IS OFF FOUND PROBLEM 841207 10 027867 OPS IMPROPER ADJUSTMNT B CONT. SPRAY ADJUSTED GAIN AS 2.0 LS-103 DUE TO TIME DOESN'T IND. WET NEEDED 841204 16 029678 OPS INK DRYING UP RECORDER PNL 9-4 REPLACED INK PAD, 16.0 DPR-200 DUE TO AGE NEEDS INK PAD PRINT BELTS 841206 17 028771 OPS WEAR, LOOSE CONTROL RM RAD REPLACED WIPER 6.0 RR-459 WIRES MON.RECRDR UPSCALE TIGHTEN WIRES, CAL 841204 17 034148 OPS CHECK SOURCE CH. A CHECK SOURCE REPLACEMENT OF RE-431A DRIVE DEFECTIVE WON'T DRIVE IN CHECK SOURCE 841212 17 023042 IEC ACE FAULTY PREREGULATR REPLACED CARD WITH RM-50A VR-27 NEW FROM STOCK 541201 11 02i545 OPS HI VOLTAGE POWER RWB RAD MON AND REPLACED WITH NEW 6.0 RIS-458B SUPPLY DEFECTIVE RECRDR READ DWNSCL POWER SUPPLY 841217 17 017414 JIC TRANSISTOR WORN OUT OF PROCEDURAL REPLACD TRANSISTOR 22.0 RIS-452A TOLERANCE 2N3638 840514 23 025136 OPS FOR TESTING TEMP INST TEST INSTALLED GUAGE 3.0 HPI-202 .(USE JUMPER LOG) GAUGE 0-300 PSI AND TUBING 841212 27 029231 OPS DETECTOR FAILURE METER READS DNWSCL SENT OUT FOR 2.0 RM-103B ON PANEL 4-2 REPAIR (VICTOREEN) 841130 30 034917 OPS DRIVE MOTOR RECORDER CHART CLEANED, CAL'D, 30.0 RM-103A LOCKED UP (AGE) NOT ADVANCING ADJ. ZEROS
. . _ . ~ ~
w _
R IE g AA 0
K I, T2 A C2 T E0 T E R3 N'I R2 N 0 P O/
w A 1 c C7 L 1j C P 2
P A} ME UE R PS E
W M O Y P A
L S C I C T L N 0 U U U G N S L F N{
I E
K R A DM AO C Y_ M EO I
R RR R A T
A M P M Z U . .
T S 4 H DS I 8 F0 NO 9
O il UP F >E 1 O A C N E C FY B
R S N WD S A E N F U U SN R A I A ME T M T
C LA ET GS A N J I
(
F M N AN A 1 RI
- M T Y
T I
D R E I
Y TC 0
l i 0 E l
C T I T I E J U
A D
_ R E .
O .
W N O O T N P S E T K U N 3 1
0 R QL 2 1 O E N 4 -
Y R O 7 Z P 1 A W
E K M R
0 H N O O C W
M E
T 7 S 2 Y
S 7
1 E 2 .
T 1 A 4 D 8
. .- ' . JAMES A. FITZPATRICK NUCLEAR POWER PLANT - MONTHLY
SUMMARY
REPORT DECEMBER 1985 II. M AI NT E NA NC E .
A. Major Equipment Overhaul Non e B. Major Equipment In & Out of Service
- 1. "B" ESW pump was out o f service fo r three (3) daya due to breaker failure.
- 2. "B" LPCI battery was out of service fo r four (4) days during battery cell replacement and testing.
- 3. Plan t was shutd own fo r one (1) day to repair seat on 14MOV-58.
C. Majo r Equipmen t Problems None
.- J
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
DATE SYSTEM "00NF0ENT HOW # DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T E HOURS 11/2 70 33583 Compressor High refrigerant Repaired on WRED No. O RMC-2A Tripped pressure trip when '
operating 12/18 14 34348 Surveil- Breake r to 14MOV-11A Tested breaker SAT tested. 2 MOV-11 A lance tripped when valve Controller & motor - both Testing was cycled. SAT. Could not duplicate problen.
12/13 14 34284 Su r v e il- Valve will not shut Te sted motor ope rator - SA T. 26 MO V- 5 B lance off fl ow . Discovered Disassembled val v e. Ta ck Testing Seat ring detached fran welded seat ring in place, valve body.
12/18 71 23792 N/A Due to an accidental Placed 30 affected cells on 24 N/A short circuit of equalizing charge for 24 hrs battery cells. Affected for evaluation by Exide Co.
cells rcqtare an equalizing chame.
12/21 76 27925 Al a rm Smoke detector zone Re pl aced detector. 4 Smoke in Alarm with no Detector pmoke present. Smoke S D-2 4 7 cetector failed.
e e
S
~
POWER AUTHORITY OF=THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
DATE SYSTEM 76 "N(( HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE
,12/10 27886 Visual CO2 Normal L igh t Re pl ac ed lamp, restored 5 CO2-PNL- br oke n in. ~so eke t. syatem.
4 12/26 46 34344 Sur v e il- " B ESW Pump Breaker Te s t ed Motor - SAI. Adjusted 115 P-2B lance failed to auto-start trip devices to re flect
'Ibsting when "B" & "0" actual motor starting F-ST-9B diesels started. current .
'12/22 '46 34350 Surveillance "B" ESW Pump l' ailed to Work ccrpleted ,n WR #34344 0 F-2B Testing auto start'during F-ST-9D 12/22 34373 Drywell Packing leakage Electrically backseated 2 13MOV-15 Floor 13MOV-15 & 23H0V-15 2 3MOV-15 leakage ,
12/22 46 20244 N/A Inspection- o f pipe Remo ve d insulation f rom 2 11/29 P F SK-2 4 hanger attachments pipe to pe r fo rm inspection 14 Pipe and re-installed.
Hanger i
12/15 71 22836 Visual Deterioration of Re pl ac e "B" L PCI Ba t t e ry BAT-3B Inspection positive battery string (186 cells) post s due t o cont am-ination with copper.
12/26 10 22811 Su r v e i l- High Vibration Inspect ed pump. Re-ran St. 8 P-1C lance Re test Sat.
e T
- James A. Fit: Patrick Nuclear Power Plant PO Bcx 41 Lycoming. New York 13093 315 342.3840 Harold A.Glovier
- > NewYorkPbwer (sf Authority January 10, 1985 JAFP 85-0024 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION: DOCUMENT CONTROL DESK
REFERENCE:
DOCKET NO. 50-333
Dear Sir:
Enclosed please find the J. A. FitzPatrick Operating Status Report for the month of December, 1984. Refueling information remains the same as previously submitted.
If there are any questions concerning this report, please contact John Cook at (315) 342-3840. Ext. 439.
HAROLD A. GLOVIER HAC :mac cc: Internal Distribution Enclosures q