Monthly Operating Rept for Dec 1984
ML20112H003
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/31/1984
From: Jackie Cook, Glovier H
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
JAFP-85-0024, JAFP-85-24, NUDOCS 8501160597
Download: ML20112H003 (11)


Text

4 OPERATING DATA REPORT DOCKET NO. 50-333 DATE JAN. 1985 COMPLETED BY J. Cook TELEPHONE (315)342-3840 OPERATING STATUS

1. Unit Name: James A. FitzPatrick  : Notes  :
2. Reporting Period: 841201 - 841231  :  :
3. Licensed Thermal Power (MWt): 2436  :  :
4. Nameplate Rating (Gross MWe): 883  :  :
5. Design Electrical Rating (Net MWe): 821  :  :
6. Maximum Dependable Capacity (Gross MWe): 830  :  :
7. Maximum Dependable Capacity (Net MWe): 810
8. If Changes Occur in Capacity Ratings (Items 3 Through 7) Since Last Report,Give Reasons:

NONE

9. Power Level To Which Restricted, If Any (Net MWe): NONE
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 744 8784 82681
12. Number Of Hours Reactor Was Critical 651 7087.2 59616
13. Reactor Reserve Shutdown Hours 0 0 0 14 Hours Generator On-Line 614.9 . 6747.7 5/y4/.J
15. Unit Resecve Shutdown Hours 0 0 u
16. Cross Thermal Energy Generated (MWH) 1330944 15199368 122933934
17. Gross Electrical Energy Generated (MWH)- 451330 5061090 42280250
18. Net Electrical Energy Generated (MWH) 437415 4899375 40395013
19. Unit Service Factor 82.6% 76.8% IU.II
20. Unit Availability Factor 82.6% 76.8% /0.1%
21. Unit Capacity Factor (Using MDC Net) 72.6% 68.9% 63.6%
22. Unit Capacity Factor (Using DER Net) 71.6% 67.9% 59.5%
23. Unit Forced Outage Rate 0% 4.6% 13.5%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling outage scheduled for February 16, 1985 to last approximately 60 days.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY ~

COMMERCIAL OPERATION h

__ f

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT FitzPatrick
DATE Jan. 1985

) COMPLETED BY J. Cook i

TELEPHONE (315)342-3840 MONTH December 1984 I

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL-(MWe-Net) (MWe-Net) 1 0 17 570 2 0 18 675 3 0 19 584

$ 4 19 20 725 5' 361- 21 803 ,

6 650 22 678 7 749 23 671 8 679 24 799

j. 9 77a 25 805

! 10 804 26- 803 4

11 ana 27 799 I 12 aos 28 775 13 ano 29 695 I i

14 6ag 30 786 15- 11 31 803 16 106

SUMMARY

r The Fit: Patrick plant started up on 841204 and operated at near full

, thermal power for this reporting period with one unit shutdown on 841215 to repair a Core Spray valve.

o_______________.________ >

1 i

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-333 UNIT NAME FitzPatrick l DATE Januarv. 1984 REPORTMONTH D ecember 84 COMPLETED BY L cnnk TELEPilONE n1O la?-3R40 e.

c 4 uE Llansee c

l Date 1 kI 5 ?yy 5*. . Cause & Corrective

$*l 5 g oc Event 5,3 4 32 0 Action to i

o= x 3my Report se een u

}'u Prevent Recurrence d

l 15 841129 S 92.6 B 1 N/A SD HX Shutdown for Feedwater heater l maintenance (cumulative hrs

, 123.5) 16 841215 S 36.5 B N/A N/A BM ISV Shutdown to repair Core Spray minimum flow valve. Reinstalled valve seat and returned to service.

l l

l l 2 3 4 F: Forced Reason:

Method:

S: Scheduled A Equiprnent Failure (Emplain) Exhibit G Instructions 14tanual for Preparation of Data B-Maintenance of Test 2 Manual Scram- Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

D-Regulatory Restriction Event Report (LER) File (NUREG-40ther (Emplain) 0161)

E-Operator Training & License Emandnation F-Administrative 5 GOperational Errur (Emplain)

,- IIOther (Emplain) Exhibit I Same Source 1 -

l-

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DECEMBER 1984 Start up of the FitzPatrick plant was commenced on 841204 following a maintenance outage for repairs to the Feedwater Heaters. The unit operated at near full thermal power until 841215 when the plant shutdown to repair a loose seat on a Core Spray minimum flow valve. Repairs were completed and the plant returned to full power operations.

At the end of the reporting period the FitzPatrick plant is operating at approximately 803 Mw, .

NEWY0itK POWEll AUTil0lllIY-1AMES A.TITZPATillCK NUCLEAll POWER PLANT PAINIENAtlCE sun 1h1ARY DECFMBER. 1984 W0ll![ REQUESTNO. Il0YI CAUSE OF RESULTS OF AClION TAKEli REl' AIR DATE SYSTEA1 DETECTED R1ALIUNCf10N A1ALFUNCT10N yCIPE 1 8

- CDP.1Put!ENI HU. , 0b1ER 841205 02 027905 OPS ZERO DRIFT (LOW) FLOW TRANSMITTER CAL'D AS PER 7.5 FT-110-G DUE TO TIME READING LOW ISP-63-1 841205 02 027894 OPS NEEDED ADJUSTMEhT FLOW TRANSMITTER PERF. APPLICABLE 8.0 FT-110H DUE TO TIME VERY LOW OUTPUT SEC. OF ISP-63-1 841130 02-3 027846 OPS DEFECTIVE DRIVE RX VESSEL TEMP REPLACED GEAR AND 4.5 TR-89 CEAR RECORDER FAILED SHAFT ASSEMBLY 841202 02 023051 I&C AGE RIGHT HAND DRAIN REPLACED VALVE 2.0 DPIS-119C VALVE LEAKS 841203 02-1 027864 OPS BAD U-9 GATE RSCS DOES NOT REPLACED RELAY 20.0 RSCS PERFORM PROPERLY K56 & U-9 CATE 841213 02-3 017426 I&C WEAR OF "O" BARTON 288A SMOOTH COUCE AND 16.0 LIS-101D RINGS, COUGES LEAKY HOUSING CLEANED "O" RINGS 841212 02-3 034280 OPS UNABLE TO TRIP LCHT LIT, PERF. ISP-5, 1.5 TU-278C DETERMINE WILL NOT RESET WORKING PROPERLY LOCALLY 841219 02-3 034345 OPS FAILED FILTER ALARM TRIP REPLACED 50000 uf 8.0 TU-278A&C CAPACITOR LED LIT CAP. ON PVR SPLY 841108 03 034180 OPS LOOSE LICHT DOES NOT IND. CORRECTED LIGHT 1.0 10-11 BULB IN DISPLAY FULL OUT OUT RSCS BULB 841203 07 034262 OPS DEFECTIVE NO RESPONSE TO REPAIRED INPUT 8.0 NM-33A CONNECTOR (WORN) PWR LVL CHANGES CONNECTR TO PREAMP 841202 07 028708 OPS RECORDER OUT OF RECORD READER 5% CAL'D USING IMP 4.0

. PR-46D CALIBRATION LESS THAN MTR 7.28 841129 07 028782 OPS TRIP CKT OUT OF 'A' RBM TRIPPING ADJ R21 AND R18 1.0

. NM-82A ADJUSTMENT INOP CIRCUIT AND TESTED

. =e * *E=

t M

NEWYORit POWER AUIll0RITY-JAMES A.FITZPATRICit NUCLEAR POWER PLANT

_ MAINTENANCE

SUMMARY

DECEMBER. 1984 W0ltK REQUEST NO. Il0YI CAUSE OF RESULTS OF ACIl0N TAKEN REl' AIR

' 8E DATE SYSTEM COMPUMENT llo. DETECTED MALFUNCTION MALFUNCTION yCIP If0 I 841217 07 027898 OPS UNKNOWN-UNABLE TO COES INOP WITH SATIS. OPER. AT 2.0 RBM-A DUPLICATE PROBLEM TOO FEW INPUTS STARTUP 841220 09 023021 JIC PROBLEM IN RELAY COMP. PT. F207 CHANGE COMP. CARD- 24.0 F207 IN COMPUTER IS OFF FOUND PROBLEM 841207 10 027867 OPS IMPROPER ADJUSTMNT B CONT. SPRAY ADJUSTED GAIN AS 2.0 LS-103 DUE TO TIME DOESN'T IND. WET NEEDED 841204 16 029678 OPS INK DRYING UP RECORDER PNL 9-4 REPLACED INK PAD, 16.0 DPR-200 DUE TO AGE NEEDS INK PAD PRINT BELTS 841206 17 028771 OPS WEAR, LOOSE CONTROL RM RAD REPLACED WIPER 6.0 RR-459 WIRES MON.RECRDR UPSCALE TIGHTEN WIRES, CAL 841204 17 034148 OPS CHECK SOURCE CH. A CHECK SOURCE REPLACEMENT OF RE-431A DRIVE DEFECTIVE WON'T DRIVE IN CHECK SOURCE 841212 17 023042 IEC ACE FAULTY PREREGULATR REPLACED CARD WITH RM-50A VR-27 NEW FROM STOCK 541201 11 02i545 OPS HI VOLTAGE POWER RWB RAD MON AND REPLACED WITH NEW 6.0 RIS-458B SUPPLY DEFECTIVE RECRDR READ DWNSCL POWER SUPPLY 841217 17 017414 JIC TRANSISTOR WORN OUT OF PROCEDURAL REPLACD TRANSISTOR 22.0 RIS-452A TOLERANCE 2N3638 840514 23 025136 OPS FOR TESTING TEMP INST TEST INSTALLED GUAGE 3.0 HPI-202 .(USE JUMPER LOG) GAUGE 0-300 PSI AND TUBING 841212 27 029231 OPS DETECTOR FAILURE METER READS DNWSCL SENT OUT FOR 2.0 RM-103B ON PANEL 4-2 REPAIR (VICTOREEN) 841130 30 034917 OPS DRIVE MOTOR RECORDER CHART CLEANED, CAL'D, 30.0 RM-103A LOCKED UP (AGE) NOT ADVANCING ADJ. ZEROS

. . _ . ~ ~

w _

R IE g AA 0

  • P19 E 4 R 2 N N E O I

K I, T2 A C2 T E0 T E R3 N'I R2 N 0 P O/

w A 1 c C7 L 1j C P 2

P A} ME UE R PS E

W M O Y P A

  • F N L
  • R E A OI O R e E T N

L S C I C T L N 0 U U U G N S L F N{

I E

K R A DM AO C Y_ M EO I

R RR R A T

A M P M Z U . .

T S 4 H DS I 8 F0 NO 9

O il UP F >E 1 O A C N E C FY B

R S N WD S A E N F U U SN R A I A ME T M T

C LA ET GS A N J I

(

F M N AN A 1 RI

- M T Y

T I

D R E I

Y TC 0

l i 0 E l

C T I T I E J U

A D

_ R E .

O .

W N O O T N P S E T K U N 3 1

0 R QL 2 1 O E N 4 -

Y R O 7 Z P 1 A W

E K M R

0 H N O O C W

M E

T 7 S 2 Y

S 7

1 E 2 .

T 1 A 4 D 8

. .- ' . JAMES A. FITZPATRICK NUCLEAR POWER PLANT - MONTHLY

SUMMARY

REPORT DECEMBER 1985 II. M AI NT E NA NC E .

A. Major Equipment Overhaul Non e B. Major Equipment In & Out of Service

1. "B" ESW pump was out o f service fo r three (3) daya due to breaker failure.
2. "B" LPCI battery was out of service fo r four (4) days during battery cell replacement and testing.
3. Plan t was shutd own fo r one (1) day to repair seat on 14MOV-58.

C. Majo r Equipmen t Problems None

.- J

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM "00NF0ENT HOW # DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T E HOURS 11/2 70 33583 Compressor High refrigerant Repaired on WRED No. O RMC-2A Tripped pressure trip when '

operating 12/18 14 34348 Surveil- Breake r to 14MOV-11A Tested breaker SAT tested. 2 MOV-11 A lance tripped when valve Controller & motor - both Testing was cycled. SAT. Could not duplicate problen.

12/13 14 34284 Su r v e il- Valve will not shut Te sted motor ope rator - SA T. 26 MO V- 5 B lance off fl ow . Discovered Disassembled val v e. Ta ck Testing Seat ring detached fran welded seat ring in place, valve body.

12/18 71 23792 N/A Due to an accidental Placed 30 affected cells on 24 N/A short circuit of equalizing charge for 24 hrs battery cells. Affected for evaluation by Exide Co.

cells rcqtare an equalizing chame.

12/21 76 27925 Al a rm Smoke detector zone Re pl aced detector. 4 Smoke in Alarm with no Detector pmoke present. Smoke S D-2 4 7 cetector failed.

e e

S

~

POWER AUTHORITY OF=THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM 76 "N(( HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE

,12/10 27886 Visual CO2 Normal L igh t Re pl ac ed lamp, restored 5 CO2-PNL- br oke n in. ~so eke t. syatem.

4 12/26 46 34344 Sur v e il- " B ESW Pump Breaker Te s t ed Motor - SAI. Adjusted 115 P-2B lance failed to auto-start trip devices to re flect

'Ibsting when "B" & "0" actual motor starting F-ST-9B diesels started. current .

'12/22 '46 34350 Surveillance "B" ESW Pump l' ailed to Work ccrpleted ,n WR #34344 0 F-2B Testing auto start'during F-ST-9D 12/22 34373 Drywell Packing leakage Electrically backseated 2 13MOV-15 Floor 13MOV-15 & 23H0V-15 2 3MOV-15 leakage ,

12/22 46 20244 N/A Inspection- o f pipe Remo ve d insulation f rom 2 11/29 P F SK-2 4 hanger attachments pipe to pe r fo rm inspection 14 Pipe and re-installed.

Hanger i

12/15 71 22836 Visual Deterioration of Re pl ac e "B" L PCI Ba t t e ry BAT-3B Inspection positive battery string (186 cells) post s due t o cont am-ination with copper.

12/26 10 22811 Su r v e i l- High Vibration Inspect ed pump. Re-ran St. 8 P-1C lance Re test Sat.

e T

  • James A. Fit: Patrick Nuclear Power Plant PO Bcx 41 Lycoming. New York 13093 315 342.3840 Harold A.Glovier
  1. > NewYorkPbwer (sf Authority January 10, 1985 JAFP 85-0024 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION: DOCUMENT CONTROL DESK

REFERENCE:

DOCKET NO. 50-333

Dear Sir:

Enclosed please find the J. A. FitzPatrick Operating Status Report for the month of December, 1984. Refueling information remains the same as previously submitted.

If there are any questions concerning this report, please contact John Cook at (315) 342-3840. Ext. 439.

HAROLD A. GLOVIER HAC :mac cc: Internal Distribution Enclosures q

i a

J