OPERATING DATA REPORT DOCKET NO.
50-333 DATE July 1984 COMPLETED BY J Cook TELEPHONE (319) 1A2-3840 OPERATING STATUS James A FitzPatrick Notes
- 1. Unit Name:
- 2. Reporting Period:
840701 - 840731
- 3. Licensed Thermal Power (MWt):
2436
- 4. Nameplate Rating (Gross MWe):
883 821
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
810
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
None
- 9. Power Level To Which Restricted,1f Any (Net MWe):
None
- 10. Reasons For Restrictions,if Any:
This Month Yr. to-Date Cumulative
- 11. Hours in Reporting Period 744 5111 70008
- 12. Number Of Hours Reactor Was Critical 744 4726.6 57255.4
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 744 4619.4 55819
- 15. Unit Reserve Shutdown Hours 0
0 o
- 16. Gross Thermal Energy Generated (MWH) 1715976 10659120 118395706
- 17. Gross Electrical Energy Generated (MWH) 564190 3564280 40783470
- 18. Net Electrical Energy Generated (MWH) 546405 3451100 38949740
- 19. Unit Service Factor 100%
90.4%
70.6%
- 20. Unit Availability Factor 1007.
90.4%
70.6%
- 21. Unit Capacity Factor (Using MDC Net) 90.7%
83.4%
64.3%
- 22. Unit Capacity Factor (Using DER Net).
A4 W A? 9w A n n't
- 23. Unit Forced Outage Rate 0%
3.0%
11.7%
- 24. Shuidowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
Maintenance Outace to commence on or about 840914 to inne approximately thirty (30) days.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup.
)
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8408160311 840731 i
PDR ADOCK 05000333 R
\\g L
c-AVERACE DAll.Y UNIT POWER LEVEL DOCKET NO.
50-333 FitzPatricit UNIT July 1984 DATE J Cook COMPLETED BY _
TELEPHONE (315) 342-3640 July 1984
.MO m DAY AVERAGE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe-Net) ggwe. Net)
I 706 756 37,
742-773 2
3 745 774 g,
566 768 4
20 5
711 21 760 6
768 763 3
7 777 767 23 3
77R 24 751 778 754 to 780 756 26 779 767 27 12 779 23 776 13 774 762 29 776 741 14 3,
15
'534 727 3
681 16
SUMMARY
The FitzPatrick Plant ooerated at near full thermal power for this reporting neriod with one nower reduction for rod pattern adjustment and one nower reduction to repair a main condenser tube leak.
9 e
N1#-*M y
UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO '
'50-333 UNIT NAME - Fi tzPatri cic -
DATE Juiv 1954
_ J Cook COMPLETED gy (315)
REPORT MONTit JULY 1984 TELEFilONE 342-3840.
'L
.!E 3
Y I.lcensee Eg k
Cause & Currective b' '
Date k
3g 5
,g g &
Event u1 Action su.
g3 E E
j15g Report
- A0 Psevent Recurrence c5 9
840704 S
H 4
N/A N/A
.N/A Reduced power for rod pattbrn adjustment.
10 840715 S
0 H
4 N7A SD COND Reduced nower to repair a main condenser tube leak.
1 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructiims 5: Scheduled A Equipment Failure (Explain) l Manual foi Piepaiation of Data R Maintenance of Test 2 Manual Scram.
Enity Sheets for I.icensee C Refueling 3 Automatic Scram.
Event Repost (LER) File INUREG.
D-Regulatory Restriction 4 Other(Explain) 01611 E-Operatur Training & License Examinaikm F-Administrative G-Operational Ensor (Explain t Exhibit 1 - Same Source -
ll Other (E xplain)
F NARRATIVE SUlWARY OF OPERATING
- EXPERIENCE July 1984 The Unit operated at near full thermal power for this reporting period with two power reductions.
On 840704 l -
power was reduced for a rod pattern adjustment then on 840715, power was reduced to repair a main condenser tube leak.
At the end of.the reporting period, the FitzPatrick Plant' is operating at approximately 727 MWe.
E
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
RmW DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE E
COMPONENT #
HOURS 6/24 23 31462 Visual Cracked Weld Ground out and re-welded 14 P15 76 7/26 88 23912' Visual Kinked wirle rope on Replaced wire rope 12 CR 2 1/2 ton hoist i
7/28 86 23910 Visual Overheated Magna Replaced magnetorque, 91 CR 2 torque brake adjusted control current.per manufacturer's instructions 7/24 88 22852 P.M.
Pitted pinion gear Replaced gear - lubricated 72 CR 2 on 20T hoist due to per manufacturer's instruc-improper lubrication tions 7/27 88 22869 P.M.
Pit.ted bul1 gear on Performed NDE on gear, 20 CR 2 20T hoist.due to cleaned and lubricated per improper lubrication manufacturer's instructions I
{
A
JAMES A. FITZPATRidK NUCLEAR POWER PLANT Y
SAFETY RELATED ELECTRICAL & MECHANICAL MAINTENANCE
SUMMARY
i SYSTEM " COMPONENT #
N DATE HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE E
HOURS 7/9 10 31159 Visual Worn packing Adjusted packing 2
MOV-89A 7/20 71 23800 S.I.
Failed to maintain Replaced cell 48 Batt 38 specified ' individual cell voltage on Cell 166 7/20 71 25370 S.I.
Failed to maintain Replaced cell 32 Batt 3B specified individual cell volt. on Cell 93 l
I i
l 1
l
}
e a
NEWYORK POWER AUTHORITY-JAMES A.FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE ' SUlWilARY JULY 1984 i
WORK REQUEST NO.
HOW CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SEEM PRE E
COMPONENT NO.
DETECTED MALFUNCTION MALFUNCTION yC g j
g I
840720 02 031659 OPS Out of calib.
Failed recorder Cal'd./ swapped 10 TE-145A upscale A&B loops - Re-
,. 1 ' a 840703 07 033533 OPS Faulty connuter Computer won't Replaced computel 2
131-C input board enter #3TIP DTA board 1
i, 840630 07 029063 JIC Age Light bulb Replaced bulb in 15 j
131A,B,C,D renlacement tin drives l
840705 07 031518 OPS Tubing changed Adj.so como. wi] 1 Changed core 4
TIP, DR. CON during shutdown accent data 9 bgomlimitto i
840717 07 033564 OPS Adjustment Hill not reset Adj. Inon trio /
4 APRM-C needed during F-ST-5B took out of BYPS
(
840629 07 031533 OPS Unknown Channel 7 won't Found no problemi 15 I
TIP #1 count out to with system j
main comnuter 840703 07 033625 OPS Open gnd. conn./ Comouter won't Resoldered con-20 TIP #2 Flux amp accept #2 data nection i !
l' 840723 07 029654 OPS Recal needed due C&D flux amos Perf.4-7AB 10
{
TIP to new ampcrd 5% apart GEK13971G & gain di 840723 07 031621 OPS Needed adj. and Chart RCRDR Cleaned,lubed, 24 R-131-1 cleaning Jap wg 't adj. & calib 840717 10 033584 OPS Defective LPCI Keen Full Replaced sensor /
32 LS-104 sensor will not reset Perf. IMP-G30 i
c 4
j S40723 16-1 033579 OPS Battery voltage Recorder indi-Renle'd battery /
12 j
DPR-200 low cates low read-Cal W/ISP-35
<nn
).
840705 27 031573 OPS Worn out/ Age Drywell Rad Re-Reple'd printheac 10 RR-104A co'rder/Brkn Dr. cable /calib.
j Rt ro I
3 I
i NEWYORK POWER AUTHORITY-JAMES A.FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
t JULY 1984 1
i WORK REQUESTNO.
HOW CAUSE OF RESULTS OF ACTION TAKEN REPAIR M
M EM COMPONENT NO.
DETECTED MALFUNCTION MALFUNCTION TO PRECLUDE TIME RECURRENCE HOURS i
840705 27 031679 OPS Needed adj.
Drvwell Rad Re-Adj stenping 8
'l RR-104B corder doesn't switch / Cal. re-nrint corder i
840705 27 031532 OPS Needed adJ.
Reading down-Performed ISP-31 16 02 AZ-101B scale for A&B 02 ANZR l
840716 39 024148 RDP Normal wear and Out of adjust-Checked calib; 4
PAH13,12,7 age ment reset zero i
840712 70
')31599 OPS Out of align-Connn't won't Adj zero & snan 14 i
TCV-120A nent stroke full on actuator
~
1 travel 840716 71 031660 OPS Faulty amneter Anmeter shows Reple'd ammeter 4
i INV-3B imnroner indicti w/ stock mtr 840716 71 025675 OPS Bad lamp driver Off-light doesn t Reple'd lamp 32 LPCI "B" board go out driver; lights OK 840706 73 031680 OPS Uindows on panel Fan trouble annun-Reset temn SU 18 HV-llA,FN-2A accidentally ciator is lit Annunciator i
m.4 e e %,=
1meyeA I
l i
l
UNITSHUTDOWNS AND POWER REDUCTN)MS DOCKET NO.
50-333 UNIT NAME EitzPatr:.ck DATE
- 7**
REPORTMONTig JUNE 1484 COMFt.ETED gy _
J Cook TELEPilONE L315) 342-3840 l
s.
O l
.! E S
e
$sE EE licensee h,
'"L Cause & Cweective N*-
N8*
k 58 4
.2 Event r.1 Aceion i.
~
$E E
j15j Report
- NG ree,en Reew,c.ce 5
7 840621 S
33.5 3
2 N/A N/A N/A Shutdown to photograph suonorts
'in Drywell and Steam Tunnel 8
840625 F
41.2 A
3 84-013 TG FLT Reactor scram on high nressure from bynass valve closure caused bv dirt in EHC fluid filters.
Cleaned filters and returned to service.
l 1
2 3
4 F: Fwsed Reaum:
Method:
Emhiteit G. Insesucti.ms 5: Scheduled A. Equipment Failwe(Eschin)
I-Manual Tw Psepasasi.m..I Data B-Maintenance of Test 2-Manual Scram.
Emery Sheets (w t.icensee C.Refacting 3-Autonestic Scrases.
Event Repms (LER)l'ile (NLINEG-D-Regulasany Resteiction 4-Oeher (Emplaan) 0161)
E.Operatur Training & Ucense Emandn=ehm F-Adeninis rative 5
G-Operasianal Erew (Emplaint Estubie I - Same Sinnce Ilother1Eaplain)
y.
jc 4
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE June 1984 The Unit operated at near full' thermal power for the first twenty-one days of the reporting period.
On 840621, shutdown was commenced and the Unit was taken off line on 840623 for maintenance.
Start-uo began on 840625 when a reactor scram occurred from~high pressure caused by turbine bypass valve closure.
The bypass valves closed due to blocked oil flow in the EllC Fluid Filters.
Repairs were completed and the Unit was
. back in service on 840627.
At the end of the reoorting period, the FitzPatrick Plant is operating at approximately 596 MTe.
k
7 t'UVVtl( /4U l ilVitt i I UI-l i tt U ini t UV lil:.W TUltl\\
.i JAMES A. FITZPATRICK NUCLEAR POWER PLANT l 3
SAFETY RELATED ELECTRICAL d MECilANICAL MAINTENANCE
SUMMARY
DATE 5YSTEM Y
LE{3 #ll0W DETECTED CAUSE OF taALFutJcTiott ACTION TAKEN TO PRECLUDE RECURRENCE T ME ll0UR.,
5/16 27 24244 icch..Svco Burned out relny lleplaced relay 10 Illli-1020 Teoting 5/22 70 29615 Opo-Position indiention Adjunted 11 HOD 100A ouL of adjuntment u
S/25 10 24193 Ups Wear Overhauled UU RWC-20 9
S/21 2/
2'3664 Visual Dirt un tle r body to Cleaned facen, replaced 2
PCV122A bonnet gant:et gaoket 7/4 03 JJt>J4 ups Scot Leak Hebuilt valve 12 CHD 127 IICU26-07 e
t 0
- m
(.-
l gWy LED c
e 0
i W-O m
.+
N n
N 1
m&-
1 4
1 i
W O
ebi
'W C
C G
a C
u O
.- E a
UJ c
- cc
=
.E a
O t*c b
O C
C.-= C C
C U
y g
n CJ 4
4 0" 3
5 c
U ce
~
e.
. a o
u c
C 14 0 1
- Q-C 2
W mca ee.
.e
=
c:
e
- ee
==e
-- a L
gf)
U
-~ L2 %
-~ = C C
4 G t
O
".)
.e O
.e 6
=
..e
.u
.:g
=
ea Z'
W.
O.
O O
O C L U C U
C L-eoo oe=
e:
t o
0L Z
0
- C.*
O C O. -
3
) ()
-=
4 X
a
.=,
.3 U
L Q
0 m.
E 'U E E'
c,, -
2 I""
C C
C D C &4 C C C
- =4 0
m d
U ctc cU C Ou O C k
UC m C I-C C C n L* C E C C (D >
^
C C
- ) W Z
9 C C. C C-O a
C
--e >
y
=.
o c. i e =. -
- c. :
=. x c.
=. -
N R
o o
- C e
-m o oC eC o
o=
LO 2
= u awe
=-
= 2
=
= >
>C J
- l C
.O
~w z
3
~
.o O
~
I O
k te ?
"m C)
C
.o c.
o a=
d --Q O
2 OC O
W
=
u c:
tu a m.
u
- e
.s u
b b
C
.o 0,
=
c
=
= u u
- a DC J
h
,U L
E U
C O C
P LS 4
O C
O a
4 O
g CJ C C3 C 0 2C E
$<- "= '
~
~
C-
=
"~-
- e e
o>
> c
- N, "g
~
'Q C
C4 O
O OO u
-C
)P 3:
b= C Z
3:
3: U W
O>
W i
I 1,
-t y
W O
"4.
O W
U N W
J, w w
C C
C
$b y
C 3
3 3
e e
m m
e m
. 3, 4 g
2 c.
N
--4 c.
6 Q,
Z 3
O
~
t-d Yt u-I,:.
u
=
w g
5 =
=
e o
c N
O W AW cc N
N ll0 "h Cll A C C C-N WZ C
N~
P N
C A T
- =4 C N
N Cp
- 0 3
- v-
=<
C>
a>
c=C =
<>N y
g:
NC C>
NN AO "O
> Q Le d
-C 4
NC N LO NC N<
NUCJ
% t!') <
5 8 l
1 2W l
I H
en
~
s
+
>=
b N
C N
N N
Q l
'O i
i
,A h
4 C
C W
y N
N N
N N
N N
k N
N N
N N
N N
o e.
- e x
e s
e o
E.
j i
i
1 4
ECN E
RRUCE a
R A
Y E
t R
D e
A U
n L
n M
C o
M E
b R
U P
S o
T T
y s
E d s uN l
C i
ot UA N
E b e l
L A
lA dn
(
k I
P N
T ea v
E cg i
i t R T
n lo l
iE it t
iT pn l
W A
C ee l
'I O M
A t
n I
VP L
tR A
A C
i i
M E l
t l
o t
I L
A l
T U
l C
l C
U C
N ni H E
U t
1, F
e L
t f
k K!
l 4
A l
n~
(C G
M t
og n
I F
UR L
O g
T A
E n
l A
CI J
k 9
I S
i P
R i
N n'
s 4
i Z
- T t
ivT C
C e
I E
L IF L
t E
l D
U A.
D E
\\
/
T E
C i S T
E t
S t E A
T l
L E
a
'D M
i E
D u
VVA R
s I
i rJ V0 V
Y l
l TE
{
FA G
S 0
4 O1 H
D MA 1 C W
M E
T S
7 h
2 S
E 4
1 M
/
e D
6, 8
y
c - --
l 5 ames A. FitzPatrick J
N
', Nuclear Power Plant oy P.o. Boa 41 Lycoming, New York 13093
- 315 342.3840
- > NewYorkPbwer 4# Authority August 6, 1984
[ JAFP-84-0761 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTN:
DOCUMENT CONTROL DESK Re:
DOCKET NO. 50-333
Dear Sir:
The Operating Status Report for the month of July 1984 is enclosed.
The refueling information remains the same as previously submitted.
Enclosed also are revised pages to the June 1984 Report and the Mechanical Maintenance Summary which was inadvertantly omitted.
If there are any questions concerning this report, contact John Cook at (315) 342-3840, Ext. 439.
Very truly yours,
/: