IR 05000566/1980016
| ML19340D533 | |
| Person / Time | |
|---|---|
| Site: | Yellow Creek |
| Issue date: | 11/19/1980 |
| From: | Blake J, Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19340D532 | List: |
| References | |
| 50-566-80-16, 50-567-80-16, NUDOCS 8012310053 | |
| Download: ML19340D533 (3) | |
Text
_
O
[
o UNITED STATES
!",,
l',7, NUCLEAR REGULATORY COMMISSION
,$
.. c. $
REGION 11
-
o,
[
101 MARIETTA si., N.W., sulTE 3100 b
g o
ATLANTA, GEORGIA 30303
.....
Report Nos. 50-566/80-16 and 50-567/80-16 Licensee: Tennessee Valley Authority 500A Chestnut Street Chattanooga, TN 37401 Facility Name: Yellow Creek Docket Nos. 50-566 and 50-567 License Nos. CPPR-172 and CPPR-173 Inspection at Yellow Cree
'te near Iuka, Mississippi Inspector:
-,
_
_ // /I 80 J. J.
la V
"
~
Ddte Signed Approved by:
'
h
/ /f
A. R. Herdt, Section Chief, RC&ES Branch Date ' Signed SUMMARY Inspection on October 20-21, 1980 Areas Inspected This routine, unannounced inspection involved 12 inspector-hours on site in the areas of Previously Identified Inspection Findings; Licensee Identified Items; Construction Status and General Inspection of Welding and NDE Programs.
Results Of the areas inspected, no items of noncompliance or deviation were identified.
.
6 8012310053
.
-
.
-
-
.
-
m.. ~
.
,
DETAILS 1.
Persons Contacted Licensee Employees
- M. M. Price, Project Manager
- R. D. Briggs, Construction QC, Mechanical
- C. G. Wages, Assistant Construction Engineer, QC
- J. D. Shanlever, Construction QC, Welding
- C. E. Hale, Assistant Construction Engineer, Engineering Services
- S. E. Alge, Engineering Services, Document Construction Unit
- S. P. Watson, Document Construction Unit
- L. B. Parker, Construction QA
- S. A. Blount, Engineering Services, Tech Services Other licensee employees contacted included construction craftsmen, QC technicians, and office personnel.
Other Organizations Chicago Bridge & Iron Company C. L. Spears, Jr., Project Welding & QA Superintendent L. S. Savage, QA Technician
- Attended exit interview 2.
Exit Interview The inspection scope and findings were summarized on October 21, 1980 with those persons indicated in Paragraph I above. The inspector reminded the licensee of the ultimate responsibility for the quality of installed equipment in the plant regardless of how the equipment is furnished. Their recently identified problems with unsatisfactory welds on contractor fur-niched equipment should reinforce that area of concern.
3.
Licensee Action on Previous Inspection Findings (Closed) Infraction 566, 567/80-03-01, Failure to Establish Adequate Measures to Control Radiography.
The inspector reviewed the licensees second revised response to this item, dated October 3, 1980, which addresses the final corrective actions for the CB&I radiography problems.
This response discussed the reasons for the film darkening problem as well as the the corrective actions taken to preclude recurrence. The inspector reviewed six of the seven additional weld increments which required reshooting for penetrameter placement (the seventh could not be reshot because it was cut out to insert a penetration). Based on the review of the licensees letter, the radiographs, and procedure change implementation for placement of penetrameters and processing controls. This item is closed.
.. _ _
_.
_
,
,
-2-
.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Independent Inspection Effort The inspector conducted a general inspection of the construction site. This inspection included the following areas and activities:
Reactor Building and Waste Processing Building - Observed handling of a.
skid mounted piping assembly for the waste processing building and protection of installed equipment in the reactor building areas.
Inspection of the electrode issue station in the reactor building area.
b.
Warehouse - Inspected Class A, B pd C storage areas; observed receipt inspection and handling of pipe fittings in the receiving area; inspected storage of major components and piping for Unit 1.
Fabrication Shops - Observed welding of stainless steel piping sub-c.
assemblies for building drainage systems in pipe shop.
Observed welding and inspection of reactor building cable tray cupports in the fabrication shop; inspected the electrode issue station in the fab-rication shop area.
During these inspections the inspector discussed job requirements, quality control requirements, and amounts of supervisor's assistance with various craft personnel. The craft personnel interviewed appeared to be knowledge-able about requirements and felt that their foreman would help them to understand anything that was a problem.
There were no items of noncompliance or deviat-ions in this area of the inspection.
6.
Licensee Identified Items (50.55(e))
(Open) Item No. 566, 567/80-16-01, Deficient Welds on Gas Stripper a.
Module - On October 8, 1980, the licensee reported that piping on a skid mounted gas stripper pump modula appeared to have defective welds. The unit was manufactured by Norwalk Fabrictors for the NSSS
!
contractor, Combustion Engineering. The inspector looked at several of
{
the defective welds on the unit, noting under-sized branch connection
'
welds and several butt welds with incomplete penetration.
b.
(0 pen) Item No. 566, 567/80-16-02, Site QA Audit Deficiencies - On September 23, 1980, the licensee reported that an audit of site activities had identified a potential QA breakdown in the areas of rebar and imbedment installation and improper QC inspection signoffs.
The inspector reviewed the prelimins y report of the audit finding and discussed the problem with the site Qa representative.
_ _ - -
-
-- -