IR 05000491/1981001

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-491/81-01,50-492/81-01 & 50-493/81-01 on 810310-12.No Noncompliance Noted.Major Areas Inspected: safety-related Structures,Review of Quality Records & Corrective Action on Previous Insp Findings
ML20008G016
Person / Time
Site: Cherokee  
Issue date: 04/01/1981
From: Economos N, Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20008G014 List:
References
50-491-81-01, 50-491-81-1, 50-492-81-01, 50-492-81-1, 50-493-81-01, 50-493-81-1, NUDOCS 8105120555
Download: ML20008G016 (4)


Text

.

d D

UNITED STATES

  1. ^

8'

NUCLEAR REGULATORY COMMISSION n

$

E REGION 11 g

8, 101 MARIETTA ST., N.W., SUITE 3100

.

ATLANTA, G EORGI A 30303

&

++.**

Report Nos. 50-491/81-01, 50-492/81-01 and 50-493/81-01 Licensee: Duke Power Company P. O. Box 2178 Charlotte, NC 28242 Facility Name:

Cherokee Docket Nos. 50-491, 50-492 and 50-493 License Nos. CPPR-167, CPPR-168 and CPPR-169 Inspection at Cherokee clear t near Gaffney, South Carolina Inspector:

%

8 BC

/

.

N. Econo s'

fateSi ed Approved by:

f

[/

A. R. Herdt, Section Chief D6t( Signed Engineering Inspection Branch Engineering and Technical Inspection Division SUMMARY Inspected on March 10-12, 1981 Areas inspected This routine, unannounced inspection involved 20 inspector-hours on site in the areas of safety-related structures (containment) review of quality records, corrective action on previous inspection findings, radiographic film and work observation.

Results Of the areas inspected, no violations or deviations were identified. ~

._

8?05120 555

.

_

.

._. -__ _

_

.. -

.

__

_.

_

_

-

.

/

,

.

REPORT DETAILS 1.

Persons Contacted.

Licensee Employees

  • J. T. Moore, Project Manager
  • J. W. Davis, Senior Construction Engineer
  • K. W. Schmidt, Acting Senior QA Engineer J. E. Cavender, Corporate Level III Examiner Other licensee employees contacted included construction craftsmen and inspectors.
  • Attended exit interview

.

2.

Exit Interview The inspection scope and findings were summarized on March 12, 1981 with those persons indicated in paragraph 1 above.

>

3.

Licensee Action on Previous Inspection Findings This was not inspected during this inspection.

4.

Unresolved I'tems Unresolved items were not identified during this inspection.

5.

Independent Inspection Effort A general inspection was performed in and around the reactor building to observe construction activity, housekeeping, control of weld consumables l

inside containment and construction progress. Through discussions, inter-

!

views and observations, the inspector noted the following:

a.

The size of the work force and construction activity is being reduced severely to the paint where af ter a period of four to six weeks it is anticipated that only storage and maintenance work will be performed.

b.

Work on the nuclear service water dam will continue and should be

!

completed in approximately two months.

-

l c.

There are about 2,000 cubic yards of conct ete scheduled for pouring

'

after which this activity will stop.

l

_

--

_.

_ _ _ _ _ _

.-

_

-. _. -. _ _ - _

_ - -..

.

.

,

,

.

-

d.

The containment liner will remain on temporary supports instead cf being floated and grouted to its permanent position as previou:,iy planned. A protective coating will be applied and provisions will be made to permit water drainage.

Within the-areas inspected no violations or deviations were identified.

6.

Steel Structures and Supports - Observation of Welding Activities Within Containment The applicable code for fabrication and inspection of the containment liner is the ASME Boiler and Pressure Vessel Code,Section III, Subsection NE (74S76) with code cases 1714 and 1777 applicable.

Duke Specification P81S-1144.10-00-0001 contains provisions and/or requirements for welding, repairs, NDE, inspections and tolerances, etc.

Procedure M-71 is used to implement process control and documentation. Welding procedures are quali-fied to Section IX of the ASME Code. In general, vertical and horizontal welds of the liner have been fabricated with the flux cored arc process while attach;nents including leak channels penetrations, etc., are fabricated with the shielded metal arc process. At the time of this inspection, leak channel weld IV0924A was in the final fabrication stage. This was the only weld being fabricated at this time.

Following are completed welds selected at random for observation in order to ascertain whether they met procedural and code requirements:

Weld hpe Location / Orientation IV0924-A Leak Chase Channel Zone 10, Vertical 1H0909 Leak Chase Channel Zone 9, Horizontal IV0919 Leak Chase Channel Zone 9, Vertical IV0916 Leak Chase Channel Zone 9, Vertical IV0921 Leak Chase Channel Zone 9, Vertical 10917-B Liner Plate Zone 9, Vertical 10918-B Liner Plate Zone 9, Vertical 10925-B Liner Plate Zone 9, Vertical 10926-B Liner Plate Zone 9, Vertical

,

Areas of specific interest included weld reinforcement uniformity and contour surface defects, undercut, arc strikes, spatter, welder identifi-cation, cleanliness.

In addition, the inspector reviewed selected quality records including: process control sheets (Forms M-71A) for completeness, accuracy, clarity and disposition of repairs, weld consumable certifications, and receipt inspectiort for the following:

l l

~

.

i

.

e

'

,

.

TYPE Ht#/ Lot #

Size

'

E7018 48R-1/8" dia.

47K.

5/32" dia.

50T 3/32" dia.

E707-1 H7638 1/16" dia.

,

Welder performance qualifications,. originals and updates.were-reviewed. The-leak channel to plate welds were magnetic particle inspected in accordance with requirements.of Procedure NDE-22T, Revision 5, using ASME Section III, ND and NE (74W76) acceptance standards. The procedure was written to comply with ASME Section V (77S77) Article 1 and 7.

Quality records of containment liner plates 10918, 10919, 10925, 10926 and 11019 were reviewed in order to ascertain whether the material was consis-tent with SA-516 GR 70 requirements and had been properly receipt inspected and released.

Within the areas inspected no violations or deviations were identified.

7.

Containment Liner Weld Radiograph Review (Unit 1)

The inspector reviewed selected films of liner plate welds for conformance with procedural and cede requirements. Applicable code requirements, see paragraph 6, are implemented through approved site procedure NDE-10A, Revision 4 " General Radiography Practice."

Films reviewed are-as follows:

j Weld No.

Film No./RT Stations 10917-B 20 thru 29 10918-B 8 thru 16 10925-B 13 thru 20 10926-B 0 thru 7 Within the areas inspected no violations or deviations were identified.

8.

Leak Chase Pressure Testing

~

At the time of this inspection the licensee was conducting leak tests on the liner channels. The tests involved both the." sniffer" and pressure change methods which were being performed in accordance to the following proce-dures:

a.

NDE-52, Revision 0, Leak Test Halogen Diode (Sniffer) Method

.

__ _

_ _.. _..

n-

-

-__ _ _,...

, _. _ _ _.. _ _ _ _ ___ __.

.

-

.

.

.

..

.

-

.

b.

NDE-53, Revision 0, Leak Test Pressure Change.

QA Procedure 0-1, Revision 21, Control of Measuring and Test Equipment, establishes requirements for calibration of measuring and testing equipment, e.g.,

pressure gauges, used in this test.

Within these areas. the inspector observed the on going testing on "A" area which was being delayed because of unfavorable wind conditions and equipment failures and, reviewed related QA records including personnel records, equipment calibrations, and documentation.

Within the areas inspected no violations or deviations were identified.

9.

Inspector Followup Items a.

(Closed) Inspector Followup Item (IFI) 491/80-04-01 - Documentation of Preheat Temperature Checks. Attachment Form 71A to Procedure M-71, Process Control and Inspection of Containment Systems and Liner Plates, has been revised to allow for the documentation of preheat checks as they are performed during weld fabrication.

b.

(Closed) IFI No. 491/80-08-01 -- Stud Base Oualification Report.

Certification records for stud weldability qualification of Nelson shear connectors from 1/4" to 7/8" solid flux shear connector studs were reviewed for code compliance.

!

l

_

(

_ -

!

_

l i

l l

_