IR 05000460/1978007
ML20147E711 | |
Person / Time | |
---|---|
Site: | Washington Public Power Supply System |
Issue date: | 12/14/1978 |
From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
To: | Strand N WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
Shared Package | |
ML20147E638 | List: |
References | |
NUDOCS 7812210166 | |
Download: ML20147E711 (1) | |
Text
E "" "'d tg UNITED STATES
,
8t NUCLEAR REGULATORY COMMISSION
., g ;
5..
..j
REGION V
D SUITE 202, W ALNUT C REEK PLAZ A
$
o 1990 N. CALIFOhNIA BOULEVARD p
4eee&
W ALNUT CREEK, C ALIFORNI A 94596
.
DEC 141978 Docket Nos. 50-460 50-513 Washington Public Power Supply System P. O. Box 968 Richland, Washington 99352 Attention: Mr. N. O. Strand Managing Director l
G entlemen:
Thank you for your letter dated December 11, 1978 informing us of the l
steps you have taken to correct the items which we brought to your attention in our letter dated November 8,1978. Your corrective actions will be verified.during a future inspection.
Your cooperation with us is appreciated.
Sincerely,
'
\\
-
G. S. S neer, Chief Reactor Construction and e
Engineering Support Branch
l 781221014