July 11, 2007
SUBJECT:
ERRATA TO BRAIDWOOD STATION, UNITS 1 AND 2 NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000456/2007007 AND 05000457/2007007
Dear Mr. Crane June 12, 2007
SUBJECT:
ERRATA TO BRAIDWOOD STATION, UNITS 1 AND 2 NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000456/2007007 AND 05000457/2007007
Dear Mr. Crane On June 12, 2007, the U. S. Nuclear Regulatory Commission (NRC) issued Problem Identification and Resolution Inspection Report 05000456/2007007 and 05000457/2007007 (ML071640143) for your Braidwood Station, Units 1 and 2. The List of Items Opened, Closed, and Discussed had incorrectly specified the classification of two items.
The enclosed List of Items Opened, Closed, and Discussed, contains the corrected page of the Attachment (marked revised). Please insert the enclosed page 2 to replace the current page 2 of the Attachment in Inspection Report 05000456/2007007 and 05000457/2007007. Please remove and dispose of the original page 2 of the Attachment.
We apologize for any inconvenience to you and your staff.
Sincerely, Richard A. Skokowski, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Enclosure:
Revised List of Items Opened, Closed, and Discussed to Inspection Report No. 05000456/2007007 and 05000457/2007007 DISTRIBUTION:
See next page DOCUMENT NAME:C:\\FileNet\\ML071930170.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME RSkokowski:dtp DATE 07/11/07 OFFICIAL RECORD COPY
Letter to C. Crane from R. Skokowski dated July 11, 2007 SUBJECT:
ERRATA TO BRAIDWOOD STATION, UNITS 1 AND 2 NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000456/2007007 AND 05000457/2007007 cc w/encl:
Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Operations Support Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission
Letter to C. Crane From R. Skokowski dated July 1, 2007 SUBJECT:
ERRATA TO BRAIDWOOD STATION, UNITS 1 AND 2 NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000456/2007007 AND 05000457/2007007 DISTRIBUTION:
DXC1 TEB RFK RidsNrrDirsIrib GEG KGO GLS SPR DRPIII DRSIII PLB1 TXN
LIST OF ITEMS OPENED, CLOSED AND DISCUSSED Opened and Closed 05000456/2007007-01; 05000457/2007007-01 NCV The licensees failure to maintain a procedure adequate could have resulted in securing the only remaining residual heat removal pump (Section 4.OA.2.a.1)05000456/2007007-02; 05000457/2007007-02 NCV Inadequate extent of condition review which failed to identify that IST testing was not performed for component cooling water systems valves (Section 4.OA.2.a.2)
Discussed None 2 (Revised)