IR 05000454/2018411

From kanterella
Jump to navigation Jump to search
NRC Security Baseline Inspection Report 05000454/2018411; 05000455/2018411 - Cover Letter Only (DRS-A.Anderson)
ML18082B120
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/23/2018
From: Steven Orth
Plant Support Branch II
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2018411
Download: ML18082B120 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION rch 23, 2018

SUBJECT:

BYRON STATION, UNITS 1 AND 2NRC SECURITY BASELINE INSPECTION REPORT 05000454/2018411; 05000455/2018411

Dear Mr. Hanson:

On March 9, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a Security Baseline Inspection at your Byron Station, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on March 9, 2018, with Mr. C. Catencamp and other members of your staff.

The NRC inspectors did not identify any findings or violations of more-than-minor significance.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Nonpublic Enclosure:

IR 05000454/2018411; 05000455/2018411 cc: C. Catencamp, Byron Station Security Manager A. Khayyat, State Liaison Officer, Illinois Emergency Management Agency cc w/o encl: Distribution via LISTSERV