Similar Documents at Byron |
---|
Category:Letter
MONTHYEARML24351A1892024-12-16016 December 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000455/2025011 RS-24-077, Application to Revise Technical Specifications for Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process2024-12-0909 December 2024 Application to Revise Technical Specifications for Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process BYRON 2024-0060, CFR 50.59 Summary Report, Changes, Tests and Experiments2024-12-0808 December 2024 CFR 50.59 Summary Report, Changes, Tests and Experiments BYRON 2024-0059, CFR 72.48 Evaluation Summary Report2024-11-21021 November 2024 CFR 72.48 Evaluation Summary Report BYRON 2024-0057, Day Inservice Inspection Report for Interval 4, Period 3, (B1R26)2024-11-14014 November 2024 Day Inservice Inspection Report for Interval 4, Period 3, (B1R26) IR 05000454/20240032024-11-12012 November 2024 Integrated Inspection Report 05000454/2024003 and 05000455/2024003 RS-24-122, Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2024-11-0707 November 2024 Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI 05000454/LER-2024-002, Reactor Vessel Closure Head Penetration 31 Degraded2024-11-0707 November 2024 Reactor Vessel Closure Head Penetration 31 Degraded ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums RS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision BYRON 2024-0054, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2024-10-24024 October 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report ML24297A2702024-10-23023 October 2024 Notification of NRC Baseline Inspection and Request for Information: Inspection Report 05000455/2025002 RS-24-098, Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality2024-10-23023 October 2024 Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals2024-10-10010 October 2024 Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24281A1502024-10-0707 October 2024 Request for Information for NRC Commercial Grade Dedication Inspection Report 05000454/2025010 and 05000455/2025010 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary BYRON 2024-0046, Cycle 27 Core Operating Limits Report2024-09-19019 September 2024 Cycle 27 Core Operating Limits Report RS-24-088, Relief Requests Associated with the Fifth Inservice Inspection Interval2024-09-13013 September 2024 Relief Requests Associated with the Fifth Inservice Inspection Interval ML24250A1182024-09-0606 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information 05000454/LER-2024-001, Both Trains of Control Room Ventilation Temperature Control System Inoperable2024-09-0505 September 2024 Both Trains of Control Room Ventilation Temperature Control System Inoperable ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit IR 05000454/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Byron Station, Units 1 and 2 (Report 05000455/2024005 and 05000454/2024005) ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000454/20240112024-08-0808 August 2024 Phase 2 Post- Approval License Renewal Report 05000454/2024011 IR 05000454/20240022024-07-26026 July 2024 Integrated Inspection Report 05000454/2024002 and 05000455/2024002, and Exercise of Enforcement Discretion ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-066, Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller2024-06-25025 June 2024 Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller ML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report BYRON 2024-0031, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-05-16016 May 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation IR 05000454/20240012024-05-10010 May 2024 Integrated Inspection Report 05000454/2024001; 05000455/2024001 and 07200068/2024001 BYRON 2024-0028, Annual Radiological Environmental Operating Report (AREOR)2024-05-0909 May 2024 Annual Radiological Environmental Operating Report (AREOR) BYRON 2024-0022, 2023 Regulatory Commitment Change Summary Report2024-05-0202 May 2024 2023 Regulatory Commitment Change Summary Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24116A1192024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML24113A1272024-04-22022 April 2024 Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) ML24113A2892024-04-22022 April 2024 Notification of NRC Baseline Inspection and Request for Information BYRON 2024-0020, Annual Dose Report for 20232024-04-18018 April 2024 Annual Dose Report for 2023 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition BYRON 2024-0021, Registration of Use of Cask to Store Spent Fuel2024-04-11011 April 2024 Registration of Use of Cask to Store Spent Fuel RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors 2024-09-06
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000454/20233012023-11-27027 November 2023 NRC Initial License Examination Report 05000454/2023301 and 05000455/2023301 IR 05000454/20193012019-04-0808 April 2019 NRC Initial License Examination Report 05000454/2019301; 05000455/2019301 IR 05000454/20173012018-01-0505 January 2018 NRC Initial License Examination Report 05000454/2017301; 05000455/2017301 (DRS-J.Seymour) IR 05000454/20163012016-04-28028 April 2016 NRC Initial License Examination Report 05000454/2016301; 05000455/2016301, March 14, 2016 March 29, 2016 RS-14-164, (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-05-29029 May 2014 (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations IR 05000454/20133012013-06-17017 June 2013 Er 05000454-13-301, 05000455-13-301, on 04/29/2013 - 05/13/2013, Exelon Generation Company, LLC, Byron Station, Units 1 and 2, Initial License Examination Report IR 05000454/20123012012-02-24024 February 2012 Er 05000454-12-301, 05000455-12-301(DRS), on 01/23/2012-02/07/2012, Exelon Generation Company, LLC, Byron Station, Units 1 and 2, Initial License Examination Report ML1114703662010-09-27027 September 2010 2010 Byron Station Initial Examination Outline Submittal IR 05000454/20083012008-08-0505 August 2008 Er 05000454-08-301(DRS), 05000455-08-301(DRS), on 05/19/08 - 07/02/08, Exelon Generation Company, LLC, Byron Station, Units 1 and 2, Initial License Examination Report IR 05000454/20033012004-01-0808 January 2004 IR 05000454-03-301(DRS), and IR 05000455-03-301(DRS); on 12/01-12/203; Byron Station. Initial License Examination Report 2023-11-27
[Table view] |
Text
ary 24, 2012
SUBJECT:
BYRON STATION, UNITS 1 AND 2 NRC INITIAL LICENSE EXAMINATION REPORT 05000454/2012301; 05000455/2012301
Dear Mr. M. Pacilio:
On February 7, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing examination process for license applicants employed your Byron Station, Units 1 and 2. The enclosed report documents the results of those examinations. Preliminary observations noted during the examination process were discussed on January 27, 2012, with Mr. M. McCue, Acting Training Director, and other members of your staff. An exit meeting was conducted by telephone on February 10, 2012, between Mr. T. Tulon, Site Vice President, and Mr. M. Bielby, Chief Operator Licensing Examiner, to review the proposed final grading of the written examination for the license applicants. During the telephone conversation NRC resolutions of the station=s post examination comments, initially received by the NRC on February 7, 2012, were discussed.
The NRC examiners administered an initial license examination operating test during the week of January 23, 2012. The written examination was administered by Byron Station training department personnel on January 31, 2012. Five Senior Reactor Operator and three Reactor Operator applicants were administered license examinations. The results of the examinations were finalized on February 21, 2012. Eight applicants passed all sections of their respective examinations and five were issued senior operator licenses and three were issued operator licenses.
The written examination and other related written examination documentation will be withheld from public disclosure for 24 months per your request. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66
Enclosures:
1. Operator Licensing Examination Report 05000454/2012301(DRS);
05000455/2012301(DRS)
w/Attachment: Supplemental Information 2. Simulation Facility Report
REGION III==
Docket No: 50-454; 50-455 License No: NPF-37; NPF-66 Report No: 05000454/2012301(DRS); 05000455/2012301(DRS)
Licensee: Exelon Generation Company, LLC Facility: Byron Station, Units 1 and 2 Location: Byron, IL Dates: January 23 - February 7, 2012 Inspectors: M. Bielby, Chief Examiner B. Palagi, Examiner C. Moore, Examiner Approved by: Hironori Peterson, Chief Operations Branch Division of Reactor Safety Enclosure
SUMMARY OF FINDINGS
ER 05000454/2012301(DRS); 05000455/2012301(DRS); 01/23/2012-02/07/2012; Exelon
Generation Company, LLC, Byron Station, Units 1 and 2; Initial License Examination Report.
The announced initial operator licensing examination was conducted by regional Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG-1021, AOperator Licensing Examination Standards for Power Reactors,@ Revision 9, Supplement 1.
Examination Summary:
Eight of eight applicants passed all sections of their respective examinations. Five applicants were issued senior operator licenses and three applicants were issued operator licenses.
(Section 4OA5.1).
REPORT DETAILS
4OA5 Other
.1 Initial Licensing Examinations
a. Examination Scope
The NRC examiners and members of the facility licensees staff used the guidance prescribed in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9-Supplement 1, to develop, validate, administer, and grade the written examination and operating test. Members of the facility licensees staff prepared the outline and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of January 23, 2012, with the assistance of members of the facility licensees staff. During the on-site validation week, the examiners audited two license applications for accuracy. The NRC examiners, with the assistance of members of the facility licensees staff, administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of January 23 through 27, 2012. The facility licensee administered the written examination on January 31, 2012.
b. Findings
- (1) Written Examination The NRC examiners determined that the written examination, as proposed by the licensee, was within the range of acceptability expected for a proposed examination.
Less than 20% of the proposed examination questions were determined to be unsatisfactory and required modification or replacement. All changes made to the proposed examination, were made in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors, and documented on Form ES-401-9, Written Examination Review Worksheet, which will be available in 24 months electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS).
On February 7, 2012, the licensee submitted documentation noting that there were no post-examination comments for consideration by the NRC examiners when grading the written examination. The final as-administered examination and answer key (ADAMS Accession Number ML12055A179, will be available in 24 months electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS).
The NRC examiners graded the written examination on February 7, 2012, and conducted a review of each missed question to determine the accuracy and validity of the examination questions.
- (2) Operating Test The NRC examiners determined that the operating test, as originally proposed by the licensee, was within the range of acceptability expected for a proposed examination.
Changes made to the operating test, documented in a document titled, AOperating Test Comments,@ as well as the final as administered dynamic simulator scenarios and JPMs, are available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS).
The NRC examiners completed operating test grading on February 21, 2012.
- (3) Examination Results Five applicants at the Senior Reactor Operator (SRO) level and three applicants at the Reactor Operator (RO) level were administered written examinations and operating tests. Eight applicants passed all portions of their examinations and were issued their respective operating licenses.
.2 Examination Security
a. Scope
The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with 10 CFR 55.49, AIntegrity of Examinations and Tests.@ The examiners used the guidelines provided in NUREG 1021, "Operator Licensing Examination Standards for Power Reactors,@ to determine acceptability of the licensee=s examination security activities.
b. Findings
No findings of significance were identified.
4OA6 Meetings
.1 Debrief
The chief examiner presented the examination team's preliminary observations and findings on January 27, 2012, to Mr. M. McCue, Acting Training Director and other members of the Byron Station Operations and Training Department staff.
.2 Exit Meeting
The chief examiner conducted an exit meeting on February 10, 2012, with Mr. T. Tulon, Site Vice President, by telephone. The NRC=s final disposition of the station=s post-examination comments were disclosed and discussed with Mr. Tulon during the telephone discussion. The examiners asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or debrief/exit meetings.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- T. Tulon, Site Vice President
- M. Coffman, Non-Licensed Operator Training Specialist
- D. Grudger, Regulatory Assurance Manager
- B. Hochstetter, Initial License Training Specialist
- T. Hulbert, Byron Regulatory Assurance
- M. McCue, Acting Training Director / Licensed Operator Requalification Training Lead
- G. Pickar, Acting Training Director / Operations Training Manager
- R. Schliessman, Braidwood Regulatory Assurance
- G. Smith, Initial License Training Specialist
- R. Williams, Senior Operations Supervisor
- B. Youman, Plant Manager
NRC
- B. Bartlett, Senior Resident Inspector
- M. Bielby, Chief Examiner
- C. Moore, Examiner
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None Attachment
LIST OF DOCUMENTS REVIEWED