IR 05000420/2005020

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 850420-0520
ML18019A263
Person / Time
Site: Harris, 05000420 
Issue date: 06/05/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18019A262 List:
References
50-400-85-16, NUDOCS 8507110557
Download: ML18019A263 (2)


Text

ENCLOSURE

NOTICE OF VIOLATION Carolina Power and Light Company Shearon Harris Unit 1 Docket No. 50-400 License No.

CPPR-158 The following violation was identi fied during an in specti on conducted on April 20 May 20, 1985.

The Severity Level was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).

CFR 50.55(f)(1) requires CP&L to implement the quality assurance program described or r eferenced in the Preliminary Safety Analysis Report.

Section 1.8.5.5 of the CP&L guality Assurance Program requires that measures be established to insure that inspections are conducted in accordance with documented instructions, procedures, and approved drawings.

Contrary to the above, on May 14, 1985, the inspector identified at least two instances where electrical field modifications were being performed that did not meet the procedural requirements of construction work procedure

"Installation of Seismically Supported Electrical Cable Trays, Conduit,'oxes and Bus Ducts" (WP-203).

In addition, the Electrical Field Modifi-cations were not documented as a Field Change Request/Permanent Waiver ( FCR/PW) within 5 days, as required by this procedure.

Thi s i s a Severi ty Level V violati on (Supp 1 ement II).

Pursuant to

CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including:

(1) admission or denial of the alleged violations; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.