{{#Wiki_filter:. - /))! (N, , , JUL 6 1984 DISTRIBUTION: Central F11e:j ORB #3Rdg &" Memo PMKreutzer MEMORANDUM FOR: Harold R. Denton, Director Office of Nuclear Reactor Regulation FROM: Darrell G. Eisenhut, Director - Division of Licensing, NRR SUBJECT: "SHOLLY" STATISTICS Enclosed is the update of the Sholly statistics covering the period May 6, 1983 through June 20, 1984.
No additional comments nor requests for hearing were received.
In the TMI-I proceeding, by a Memorandum and Order dated June 1,1984, the Board dismissed 9 of 11 contentions. The hearing is scheduled to begin July 16, 1984 on the remaining contentions.
In the matter of the Trojan spent fuel pool expansion, the annendment was issued on June 8,1984 A prehearing conference has been held and contentions are being formulated.
A press release was issued on the application dated May 25, 1984 received from Commonwealth Edison Company to amend the operating licenses for the LaSalle County Station, Units 1 and 2.
The amendment would change the TS to increase the allowable main steam line tunnel inlet air to outlet air temperature difference trip setpoint 12 F, from 24 F to 36"F.
The change is proposed to pre-vent an unintentional full isolation of all main team lines causing reactor shutdown (trip). CECO explained that the proposed change is needed as soon as possible to prevent such spurious trips from causing full steam line isolations and reactor shut downs.
The exigent circumstance results from actual normal temperature difference measurements (recently obtained during Unit 2 startup operations) in the steam tunnel being higher than expected and approaching the trip setpoint of 24 F.
As Unit 2 proceeds to full power, additional normal heat in the steam tunnel or minor plant ventilation changes may cause the trip setpoint to be exce" >'ed. t / ., { [[ '{ ' b 'I / (' , hd d / ) Y; q. d'/ \\ l ' N' 9407300050 840706 CF SUBJ CF ID&R-5FAC LIC
' . . . 2- - The next n,cnthly FRN is scheduled for publication on July 25, 1984, after which the statistics will be updated.
,; p rinina). cind b7 i d y ry n G. E 1:;c: ? g, Darrell G. Eisenhut, Director Division of Licensing, NRR Enclosure: As stated cc w/ enclosure: DL ads DL BCs DL LAs 0 ELD Contact: Pat Kreutzer X29516 '#
'^ l _.
< l k . ORBQ)DL
- DL
/ AJ:DL A[h L D:
PNkreutzer:dd Il# anrnell O Iller GCL nas t6nhut 7/t /84 7/3/84 ' 7/ /84 7/ /84 7/ f/E, ' [
- . . . "SH0LLY" STATISTICS May 6,1983 - June 20,1984 Monthly FRN Individual FRN Individual FRN Total Proposed HSHC Proposed NSHC SHC NUMBER 1053 217
1295 Period for public comment: 30 days 1053 205
1283 Less than 30 days: Short FRN . .
12 X X ~ - , - x - x [ Press release
2 Grand Gulf 8 TMI-1 Public comments received 1 Oyster Creek 1 Sysquehanna
121/ , 1 Grand Guld 2 TMI-1; 2 Trojan; 1 Pilgrim Requests for hearing 1 Salem-1; 2 Zion 1/2 112/ 2 Turkey Pt. 3/4 Amendments Issued Total............................................................ 595 (1) with 30 days notice ............................................................ 562 . . (2) l es s th a n 3 0 d ays u no no t i c e................................................... '
(3) Hea ri ng reques ted but fi nal NSHC de termi na tion made ( 50.91(a )(4 ))................. 63/ Backlog: (applications received which have not been noticed, either in monthly FRN or individually through June 20. 1984 ): NUMBER 335._ (Includes items which have been prepared and approved for publication in July monthly, items which are ia concurrence chain, and items for which additional information is needed from the licensee.)
FOOTNOTES: See Page 2.
s
2 i 't * $
- .. -2-FOOTNOTES FOR "SHOLLY" STATISTICS ,- w w: , 1] Comments Grand Gulf 2 conrnents - one from State, one from a member of - the public TMI-I 7 comments received as result of initial noticing - action, I additional comment receiveJ as a result of Notice of Additional Opportunity published on August 25, 1983.
Susquehanna I comment received from a member of the public - Oyster Creek I consnent received from State - 2] Request for hearing , THI-I Steam generator repair - 2 requests for hearing received.
- Prehearing conference held; contentions accepted by ASLB. By a Memorandum and Order dated June 1,1984, the Board dismissed 9 of 11 contentions. Hearing is scheduled to begin July 16, 1984.
Salem-1 Integrated leak -rate - 1 request for hearing received - f m State of Delaware. On Jan. 20, 1984 State filed stion to withdraw which was granted by the board Jan. 25, 1984.- Turkey Pt. 3/4 Proposed operational limits for current and future - reloads - 2 requests for hearing (2 units) Pilgrini Single loop operation - 1 request for hearing.
- Proceeding dismissed Jan. 26, 1984 based on settlement.
Grand Gulf Amendment No.10 redefined HPCS operation and resulted in - a calculated increase in peak clad temperature.
One hearing request received. Prehearing conference was held Feb. 29, 1984. ASLB issued decision on Apr. 23, 1984 admitting two contentions for discovery.
Trojan Spent fuel pool expansion - 2 requests for hearing, - 1 from State and 1 from Coalition for Safe Power.
Both admitted as parties to proceeding.
Prehearing conference held and contentions are being formulated.
Zion 1/2 Containment leak testing - 2 requests for hearing (2 units) - from Citizens Against Nuclear Power.
Licensee subsequently withdrew application for amendment.
,3_/ Amendment Issued, Item (3) THI-1 - hot testing, 1 amendment; Salem-1 - integrated leak testing, 1 amend-ment; Turkey Pt. 3/4 - operational limts for current / future reMads, 2 amend-ments; THI-1 hot functional testing of SG - 1 amendment; Trojan spent fuel pool - 1 amendment. }}