IR 05000409/1983012

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 50-409/83-12 on 830808-12.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt,Personnel,Response,Records & Repts,Testing & Maint.Details Withheld (Ref 10CFR73.21)
ML20024E890
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 08/31/1983
From: Christoffer G, Creed J, Bern Stapleton
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20024E886 List:
References
50-409-83-12, NUDOCS 8309070178
Download: ML20024E890 (1)


Text

{{#Wiki_filter:_ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ e o U. S. NUCLEAR REGULATORY COMMISSION

REGION III

i Report No. 50-409/83-12 ! Docket No. 50-409 License No. DPR-45 Safeguards Group IV-l Licensee: Dairyland Power Cooperative l 2615 East Avenue - South Lacrosse, WI 54601 Facility Name: Lacrosse Boiling Water Reactor (LACBWR) Inspection At: LACBWR Site, Genoa, WI Inspection Conducted: August 8 - 12, 1983 Date of Last Physical Security Inspection: February 28 - March 4, 1983 Type of Inspection: Rout,ine, unannounced physical protection I- . Inspectors: G. M. Christoffer / ' Physical Protection Specialist Date f k!D B W.

n Physical Protection Specialist Date ).d.h M [ M.

7 h/!$3 Approved By: 7. R. Creed, Chieu Safeguards Section Date Inspection Summary Inspection on August 8 - 12, 1983 (Report No. 50-409/83-12(DRMSP)) Areas Inspected: Included a review of Security Plan and Implementing Procedures; Security Organization - Management, Personnel, Response; Records and Reports; Testing and Maintenance; Locks, Keys and Combinations; Security System Power Supply; Lighting; Assessment Aids; Access Control - Personnel; Alarm Stations; Communications; General Requirements Training and Qualification Plan; Additional Requirements - Power Reactors; Safeguards Contingency Plan; Safeguards Informa- > tien and Previous Items. The inspection involved 74 inspector-hours onsite by two NRC inspectors. The inspection began during the day-shift; 10 of 74 inspec-tion hours were accomplished during off-shift periods.

Resulta: The licensee was found to be in compliance with NRC requirements within the areas examined during this inspection. A previously identified unresolved item was closed.

(Details: UNCLASSIFIED ) ' -

x s ST1Q 8309070178 830831 3f-[[cpa[,2tionThis DR ADOCK 05000 0 Uo Page is Deconttulled