U.1S. NUCLEAR-REGULATORY COMMISSION.-
-
q
'
k^
'
REGION Ill
,
,
8..*
l;;
,
,
v s
-
+
,
Report No.:-- 50-374/90005(DRS)
!'
E
,
b-3g
' Docket No.: i.50-374'-
License No.: -.NPF-18
<
p[e
. -,.
"
- Licensee
- -CommonwealthEdisonCompany-Post Office 4 Box'767 a
f.
,
Chicago, IL_ 60690
-
!
Facility-- Name: LaSalle County Station, Unit 2
,
b
s f@
Inspection At: _ LaSalle vite, Marseilles, IL 61341
~
U
.
,
a k?
LInspection Conducted:
April 18 and.24; May 8 and 21, 1990 i
n
-
q
~ Inspector: MM MM 8M/[fd
'
K. b. Ward Date
d
- i
,
8/3*/0'
j
'
-Approved By:
'h n'
D. H.-Danielson,-Chief
.
lDate a
< Materials-and Processes Section j
. Inspection' Summary
,
q Inspection on April'18 and 24; May 8 and 21,1990-(Report No. 50-374/90005(DRS);
-
' Areas Inspected:. Routine, unannounced safety-inspection of, inservice a
. inspection <(ISI) activities: including review of programs-(73051), procedures-
!
'
L(73052), observation.of work ~ activities (73753),'and' data review (73755).
Results: No violations'or deviations were identif.ied. Based on the results" d
_of the inspectio_n, the-NRC i_nspector noted the following-
'
.m
-
, Management was involved ~in the ISl' activities in an' effective manner.
j
.
-
Ultrasonic examinations which identified midplate segregates-.in the'.
,
reactor pressure vessel were performed by qualified personnel and.in accordance:with: ASME Sections-XI and. V-of the: Code; j
'
^ '
LWell' stated and explicit procedures were used to' install a' temporary
' ~
-clamp for the #15 jet pump sensing line.
l'.
.-
,
!
i
?0060$@fCK05000374
-
66 900530 Q
-!
.
'
,
iid i f,.
- l
^C
.
-
.l
>
.p, a
'
&&;Q hl%
,
> '
t
%;; M ',
W $l L
.]
W d';
'
,, b-j w.;
A, DETAILS Li f:..
.D :
\\
,
!'
l1.
! Persons' Contacted
,
-a s
,
p
-
j V
'Consnoriwedith' Edison Company (CECO)
,
4 E
--*GODiederich,StationManager
.
'
<
. *W.-)Huntington, Technical-Superintendent
[
~..
g-
- W. Betourne, Quality Assurance Superintendent -
(*T. Hammerich,-Regulatory Assurance
"
'
'
.
- J. Giesker,. Technical-Staff Supervisor-
'
- A. Kochis,' Technical Staff Engineer
'.
s*M. Oclon,1 echnical-Staff /ISI-
- {
T r
'
.
<
U. S. Nuclear Regulatory Consnission (U. S. NRC)
,
- T.. Tongue, Senior: Resident inspector
)
,
R. Kopriva, Resident Inspector.
'
- Hartford Steam Boiler Inspection'and-Insurance Company-(HSB)
j.
-
'
.
.
.
..
[
-*J. Tetreault,'AHil
'
'
~
' General Electric Company--(GE)
a, a
T. Brinkman,i Level III
The-NRC? inspector-also contacted and interviewed other licensee andL i
contractor employees. -
i
- Denotes'those present'at the exit interview on May'21, 1990.
,f 2.,
Inservice Inspection (ISI), Unit 2 l
a'.
- Reviewtof Program (73051)
if GE and_ Ceco personnel perfo'rmed the:ISI program in accordance with d
-
,
' ASME Section XI, 1980 Edition, Winter 1980 Addenda. 'The-sampling.
-
- 1-inspection-plan for-addressing-intergranular stress corrosion..
.
,
^
~
cracking' (IGSCC)Econcerns was in accordance with-Generic Letter (GL) 88-01. A11 23 weldssinspected in accordance with GL.88-01 were
.
'
found to be acceptable. The licensee did not make a request for-
-4
relief from the ASME Code.this outage. The NRC. inspector reviewed audits /surveillances-of ISI activities conducted by qualified q
personnel to verify compliance with the ISI program.-
.
!
b
!
f
,
d beli lhi
_.
r
V[ n."
=
- A b '.
. Review of Procedures (73052)
-
%
.
.
.
All applicable.ISI procedures were approved _by the,ANIl and were'
reviewed by the NRC-inspector. The GE smart ultrasonic system and?
manual; pulse. echo UT detection instruments with' transducers of
-.
.
various-angles, sizes, and frequencies were used. The nondestructive y
examinations (NDE) were performed;in'accordance with ASMELSection V, p
1980 Edition, Winter 1980 Addenda.,
,
,
c.
Data'ReviewandEvaluations(73755)
.
m k
(1)_. General.
'
L.
F The following examination data was within the criteria.as-
'
outlined in the applicable NDE procedures and ASME Tode requirements. The.NRC-inspector's review included examination
..
s C
of documents relating to NDE equipment, data,Tand evaluations.
-(2)~ReactorPressureVesse1~HeadCladCracking(Unit 2)-
,
Intense visual, liquid. penetrant, and-ferrite: examine.tions were performed by CECO and GE.1S1 personnel on the Unit 2; upper head
.
Lin response to GE letters RICSILs 050 and 051 dated April 23,-1900,-
.
and May 3. -1990. These examinations were performed on selected
~
]]
m areas of the inner cladding surfaces.
~
q Since most of the cladding on the head was performed.with anL a
automatic process LCEco stated that the head was>very smooth and-uniform.-- Areas that were clad using a manual-. process a_nd:then_-
blended, i.e., full-penetration. welds, were also smooth and
,
showed no evidence of heavy! grinding.
Past and.present: ultrasonic examinations were performed on 2/3 of:the headito f.lange,_.
dollar, and four. meridian: welds. The reports showed no visible.
j evidence of mismatch at any weld joints, and'no indications _were-
detected during the nondestructive examinations.-
,
CECoalsosentateam'ofSargentandLundy(S&L)andjGEengineers
/
to the. Chicago Bridge and. iron (CB&I)'~ f acility' in-Houston, Texas, to review the original fabrication records. tin addition,_
a review of-available records-was conducted at>the.GE facility:.
i in San Jose, California. The_ records" search / review at.CB&I'andL l
GE showed no evidence of major rework in the welds or the t5
]
cladding surfaces. Ceco believes..that these examinations f
satisfy the requierments for-GE's letters RICSils 050 and 051.
HRR was informed by CECO of the above activities and concurred
'
with this conclusion.
d p_
q A meeting was held by CECO on May 21, 1990, for the purpose of-i developing an inspection plan for Unit l'.
The inspection plan j
.
included the reactor-vessel head, vessel-to-flange weld, and the
,,
upper shell region. CECO committed to the NRC to inspect these.
i areas because of the cracks found recently in the Quad Cities, Unit 2 reactor head.-
,
!
q
.
j L
,
y,
y Q
~
,
,
t'y, ;2 g y,
f"b6[',
f!
>
ld.; 10bservation of' Work Activities (73753).
>
_
R
- The NRC: inspector observed work activities in progress and W
had discussions with personnel riuring the observation of ISI-
. activities. 4These" observations' included _the following:
- (1)- A GE individual performing a liquid penetrant examination on weld-#RH-2009-12, Line #3RH;40CB-16".
"
,
g
L(2) ;A-GE individual ~ performing a magnetic particle examination
>
,
on weld.#RH-2009-13, Line #2RH-40CB-16".-
y.
[
(3) A CECO QA-individual performing: surveillance of EBASCO
. personnel performing NDE.
,
L" (4). Observed by video, GE individuals performing ultrasonic examinations on welds-inside~the reactor pressure vesseli o ' - r'
h'
(RPV)usingtheGEautomatedRPV_inspectionsystem(GERIS)'.
L Longitudinal wave examination'of weld metal and shear wave examinations in two directions:using two beam angles:were C
'
.
performed. Midplate_ segregates were recorded during the-intervice inspection that were acceptable in accordance
]
with;ASME Section XI,' Paragraph IWB 3000, and ASME Section-
sg V,-Article 4, 1980 Edition, Winter 1980 Addenda. Ultrasonic:
^ reflectors showed a very close similarity between the present reflectors and the reflectors recorded during the; L
baseline preservice inspections. -These segregates are--
characterized as metallurgical / geometric in-nature and are.
f 5all in.the base material -
c n
Midplate segregates are caused by: a concentration of alloying
~ lements in specific regions, which. result in differences in e
the' metallurgical structure due to:variationsLin chemical
'-
.
composition. These variations 1 form during original. ingot /
solidification'and are concentrated inithe. top center of Lo
'the ingot. As the ingot gets rolled into plate, these segregates;are spread out through the center section of_the plate. These inclusions are found parallel to the plate ~
surfaces and are_often called stringers.
NRR was informed by Ceco of-the above activities and concurred.with this_
,
'
conclusion.-
q W
(5) Observed by video, CECO individuals performing visual l
-
examinations (VT) of the vessel internals using a
.
"
y Westinghouse miniature underwater TV camera in conjunction with video tape recorders recording the examinations. The
,
VT revealed cracks in the attachment welds between the-
]
sensing line and the lowest sensing line bracket for the
'
- 15 jet. pump.
VT of the welds on the remaining sensing line brackets for this jet pump showed no indications.= An
!
i h
analysis by GE determined that if this condition was left
"as is" for the next cycle, additional damage including a
,
1-
.
N
,
i+
.
j mm e
n
-
,
,
'
e
-
_
..:
y(,
,
s
.
-
-
.
'
l
- break'in the sensing-line itself may result '. Therefore, GE recommended that a temporary clamp be installed during_ this outage and:a permanent modification be prepared'for i
- "
installation during the next outage. T1e nonsafety-related)
i
.
i<
clamp was installed and will. provide support for the_
cracked bracket that. holds the jet pump sensing _line to;the
- 15 jet pump diffuser. NRR was-informed by Ceco of the
,
above activities and concurred with this conclusion.
.
(6) GE personnel were observed performing visual examinations E
,
,
on the steam dryer using a ~ Westinghouse miniature underwater =
'!
TV camera from inside the reactor vessel. -The video tapes y
recorded during these examinations were reviewed by the NRC
'
inspector, Ceco. GE,-the ANII, and were discussed with the-
'
-NRR' staff.~:GE determined that the cracks were acceptable
!
.for one more ' cycle of operation and did not need to be-repaired before startup. CECO and NRR concurred with'GE's-conclusion. All the indications were near the top or_ the e
bottom of the support ring, and were similar to known cracks in several other steam dryer support rings at other
'
nuclear power plants.
,
The NRC inspector reviewed the qualifications and certifications of.-
j
- all inspection personnel on site performing ISI to ensure conformance-
with SNT-TC-1A.
The personnel performing Ui in accordance with
>
GL 88-01-were qualified at the Electric Power Research Institute
(EPRI).forIGSCC.
!!
g No violations or deviations were identified.
-
-
5.
Exit Interview The NRC inspector met with site representatives (denoted in Paragraph 1)
at the' conclusion of the inspection on May:21, 1990. The NRC inspector i
,
t summarized the scope and findings of the inspection noted-in: this report.
The NRC inspector also discussed 1the likely informational content-of the inspection report with regard-to documents or processes reviewed by the i
NRC inspector during the inspection..The licensee did-not identify any j
such documents / processes as proprietary.
.